Project Proposals: Regeneration Capital Grant Fund

Total budget £0

Screenshot 2025-05-08 134517.jpg

From Small Seeds - Cornabus Community Forest Initiative

2025-05-08  •  No comments  •  Islay Development Initiative  •  Regeneration Capital Grant Fund

   

IDI has set aside an initial 25 acres of Cornabus Community Forest to deliver housing, a Community Orchard, Garden and allotments for the community. 

In 2021 we carried out extensive consultation on the proposed development site within the now community owned Cornabus Forest. Formerly a commercial Sitka Spruce plantation, the whole site will eventually be replanted with native broadleaf to replicate the Atlantic Rainforest once prevalent on Islay, delivering significant biodiversity benefits but also on the community wish list from the consultation was housing for young people, allotments, an orchard and forest trails and a garden areas. 

The project will endeavour to add social and environmental value to the site and also create a space for community members and groups to enjoy. In 2020 Islay lost it's well-known community garden at Islay House, due to the property being sold on the open market. This was a much loved and used community space. Although the site at Cornabus is not a walled garden, extensive research on other forest garden initiatives was carried out in 2022 - including visits to Royal Botanical Society managed forests and formal garden spaces, such as Benmore and Puck's Glen. The intention is to take some elements of the old community garden site and duplicate them and the new, with lots of additional features.

The project is highly ambitious, and the first stage of funding has been secured from Inspiring Scotland for development of the tree nursery site where we will grow the replacement trees.  Secondary funding has come from Carbon Neutral Islands, specifically to create some of the infrastructure and assist with a circular economy approach to fuel wood supply on the island at affordable rates. 

This is a lifetime legacy project that will create a destination for outdoor enjoyment but also offer a range of solutions to the socio-economic challenges that the island faces with a strong focus on becoming Carbon Neutral. Islay is in a housing crisis and the addition of 10 affordable houses will help address some of those issues. To ease pressure on the Grid, the project also comes with it’s own district heating system using the remaining Sitka Spruce on site as a fuel source, a wind turbine and solar panels.  

The finished project will deliver a host of positive benefits including but not limited to:

  • Employment
  • Affordable Housing
  • Circular Economy approach/local fuel
  • Community garden
  • Allotments
  • Carbon capture in new tree planting
  • Significant destination space for locals and visitors alike.

The project will link into Argyll College, Islay High School, Youth Initiative and employability. Partners and funders will be Scottish Government – Rural and Islands Housing Fund, Argyll and Bute Council and National Lottery. Community group usage will be open to all groups on the island and will link into national networks such as Community Woodlands Association, Scottish Islands Federation and Community Tree Nursery Network.

 

Site plan for reference and example

Creating a Safe, Accessible, Multi-Purpose Gathering Space in the Heart of Oban

2025-06-02  •  No comments  •  Oban Communities Trust  •  Regeneration Capital Grant Fund

This proposal meets RCGF criteria:  supporting locally developed, place-based regeneration projects that involve local communities, helping to tackle inequalities and improving the economic, social and physical environment of deprived, disadvantaged and fragile remote communities across Scotland. It is community led, addresses market failure (inadequate parking and outdoor event space) and will result in strong regeneration outcomes.

The Rockfield Centre is owned and run by Oban Communities Trust, a Community Benefit Society run by and for its members and the wider community. It sits within c. 2000 m2 of old playpark, currently used as a car park

What will your project do? The project will re-surface the existing outdoor space surrounding The Rockfield Centre, resulting in a safe, smooth surfaced area which can be used to bring the community together through large-scale outdoor events, create economic additionality by unlocking new potential for town centre events, and contribute to ongoing town-centre carparking demand.

Why is your project needed? In the recent past, The Rockfield Centre's outdoor space has been used for a range of outdoor events from the Clipper food and drink village (July 2024) and the centre's Spring Festival (June 2025), whilst day-to-day it contributes ~ 50 spaces to the town centre parking supply - a critical resource during peak season. However, the space is badly in need of resurfacing, both to ensure its future as a carparking resource and to enable its use as a safe and accessible community gathering space. 

What positive changes will your project bring about? We belive that this project will unlock huge potential for outdoor events within Oban town centre, with benefits for business, local charities, and the wider community. Our strategic planning has identified a need within the Oban town centre area for a flexible and adaptable outdoor space that can be used by community groups for a wide range of activities - including markets, concerts, festivals, and outdoor theatre. Our outdoor space is the ideal location for holding these events as it is enclosed, easy to secure, and removes the need for disruptive and costly road closures which would be highly advantageous in a town which regularly experiences traffic flow issues and can struggle with capacity at peak times. We believe that Oban and the wider community will benefit from this project as it will open up opportunities which have otherwise not been considered, as there is no alternative suitable town centre area that can offer these facilities. This project will allow these opportunities to be fully explored and realised. The Rockfield Centre is strategically placed at the heart of the town, and is open to all. We have a track record of successfully delivering exciting, inclusive, and novel community-focussed events alongside large contracted projects, and are fully commited to working collabaratively and building strength through partnerships.

How long will your project run for?  Once funding is in place, the works could be completed quickly with actual disruption to the space kept to 2-3 weeks. We estimate the cost to be £60k (based on quotes obtained in summer 2024). We aim to have this work completed by the end of 2025.

Oban Lorne Clubhouse Designs

Oban Lorne RFC's Community Sports & Events Hub (Phase 1-2)

2025-05-21  •  No comments  •  Oban Lorne RFC & Community Sports Hub  •  Regeneration Capital Grant Fund

1. What do you want to do?

We aim to develop the Oban Sports & Events Hub—a modern, inclusive facility featuring a multi-sport clubhouse, floodlit pitches, gym, running track, and event spaces. This hub will serve as a central venue for sports, cultural events, and community gatherings, enhancing opportunities for physical activity and social engagement in Oban and the surrounding areas.

2. Why is your project needed?

Oban's existing sports infrastructure is outdated and lacks accessibility, limiting opportunities for participation in sports and community events. The current facilities do not meet the needs of the growing population, particularly youth and individuals with disabilities. By providing modern, accessible facilities, the Oban Sports & Events Hub will address these gaps, promoting inclusivity and community well-being.

3. What positive changes will your project bring about?

The hub will:

  • Enhance Health and Well-being: Provide facilities that encourage physical activity across all age groups.

  • Promote Inclusivity: Ensure accessible design for individuals with disabilities.

  • Support Youth Development: Offer programs and spaces dedicated to youth engagement.

  • Boost Local Economy: Attract events and visitors, supporting local businesses.

  • Foster Community Cohesion: Serve as a gathering place for diverse community groups.

 

4. How long will your project run for?

The project is planned over multiple phases and is subject to funding and lease agreements. The project has been designed to be flexible but includes:

  • Phase 1 (2025–mid 2026): Construction of the clubhouse, installation of floodlights, and development of the main pitch.

  • Phase 2 (mid–late 2026): Addition of a running track and 4G area.

  • Phase 3–4 (2027): Redevelopment of the bottom pitch and support of potential construction of the skate park.

  • Phases 5–8 (2028–2032): Expansion to include additional facilities and infrastructure improvements.

 

Partnerships:

We plan to collaborate with:

  • Local Sports Clubs: Oban Lorne RFC, Oban Saints FC, Oban Camanachd, and others.

  • Educational Institutions: Local schools and youth organisations, including the school hostel. 

  • Community Groups: Oban Community Skate Park Committee and cultural organisations.

  • Local Businesses & Charities: Atlantis Leisure, Adventure Oban, Happy Wee Health Club.

  • Local Authorities: Argyll and Bute Council for planning and support.

  • National Event Organisers

These partnerships will ensure the hub meets the diverse needs of the community and operates sustainably.

Design of Mull Theatre Extension

An Tobar and Mull Theatre: Theatre Development and Early Years Facility

2025-05-23  •  No comments  •  An Tobar and Mull Theatre  •  Regeneration Capital Grant Fund

Who are we?

An Tobar and Mull Theatre (AT&MT) is a vibrant multi-arts centre on the Isle of Mull and the only producing theatre in the Hebrides. As a hub for artistic excellence, cultural expression, and community connection, we play a vital role in our island's creative and social ecology. We aspire to be an island voice holding space for island experience in global culture at a time when the voices of rural communities are drowned out. Through our wide-ranging programme of theatre, visual arts, creative learning, and music, we serve: 

  • Local and visiting artists, providing space, time, and collaborative opportunities to experiment and grow. 
  • All school-age children on Mull, providing arts engagement and curriculum enrichment. 
  • Young people, creating pathways in the creative industries and amplifying youth voice through the arts. 
  • Older adults, including those living with dementia and other long-term conditions, supporting wellbeing and inclusion.

AT&MT has been recognised as a leader in community-based arts practice by the Federation of Scottish Theatre and as an essential part of local infrastructure by the Mull and Iona Community Trust.  The value of our community outreach, arts provision, and advocacy for rural communities is reflected in the thoughtful feedback we continue to receive from our local community:

“Engaging directly with one’s local community and peers is a valuable experience as it provides opportunity to share ideas and experiences and reinforces connectivity across our islands. I feel that this type of outreach work [AT&MT’s community outreach programme] is fundamental to a thriving cultural ecology on Mull and Iona” – Studio Cèilidh participant

“Because of Mull’s geography and lack of public transport many youngsters have difficulty accessing creative activities [...] The work has been taken to them through schools and location theatre. This ensures equality of access.” – Long-term Community Members

What do we want to do and why?

To secure our future and deepen our impact, we are launching an ambitious development project that responds directly to the needs of our island community. At the heart of this project is the purchase of the land beneath Mull Theatre and extension of the building to include dedicated creative workshop spaces for artists and visiting practitioners and an on-site crèche and early years facility to support families and broaden access to the arts. 

This project is essential to: 

  • Protect the future of Mull's only professional theatre and the only producing theatre in the Hebrides. Currently operating under a lease, securing ownership of our site will give us long-term stability and the confidence to plan boldly.
  • Address a critical shortage in early years childcare. Mull faces a well-documented lack of affordable and accessible childcare. This project offers a creative, community-centred solution that support parents and caregivers to participate fully in island life and the creative sector. 
  • Nurture the next generation of artists and islanders. The crèche and workshop spaces will be designed with care, learning, discovery, and cultural enrichment at their heart. 
  • Grow the island's creative ecology and promote the artistic excellence of Argyll and Bute on a national and international level. New workshop spaces will allow us to host more artists-in-residence and facilitate peer exchange. It will also offer affordable rehearsal and creation space for local and visiting artists, and extend our ability to deliver training, workshops, and events that connect Mull and Argyll and Bute to the wider cultural landscape of Scotland and beyond. 
  • Strengthen community wellbeing. As we emerge from the social and economic challenges of recent years, this development supports community recovery through creativity, care, and collaboration.

Who are our partners?  

We will work in partnership with: 

  • Local early years creative learning practitioners and educators, ensuring the crèche is child-centred, safe, and rooted in best practice. 
  • Forestry and Land Scotland, to navigate our land purchase and ensure the building extension is designed with care and attention to our beautiful natural surroundings. 
  • Mull and Iona Community Trust (MICT), to ensure the facility is bespoke and meets the needs of our island community.
  • Our Community Advisory Group, to ensure that local voices and lived experience remains at the heart of the project. 

We believe that access to the arts, like access to care, should not depend on geography. This project is about more than bricks and mortar, it's about building a future where creativity, care, and community thrive side-by-side. With the support of our partners and funders, we're excited to take this next step in our journey, ensuring that AT&MT remains a place where island voices are heard, nurtured, and celebrated for generations to come. 

20221027_111318 (1).jpg

Complete our lifeline link road!

2025-06-02  •  No comments  •  Isle of Kerrera Development Trust  •  Regeneration Capital Grant Fund

In 2021 and 2022, IKDT secured funding to construst 1.79KM of brand new road connecting the North and South of the island. This project has been in the pipeline for many decades and has connected up the two different communities and is allowing our island to thrive as one. Just after we have secured the funding for the 2nd stage of the project, the tar topping, war broke out in Ukraine. Apart from the obvious humanitarian crisis, this had an instant impact on the price of all the raw materials required for surfacing. It meant we had to scale stage 2 back and make do with tarring the new built section of the road with a single layer of tar and leave approx 500 metres of road in an unbound, farm track state. Our plan for stage 2 had been to deliver 2 layers of tar over the new road (1.79km) and the 500m of existing road when we could petition the council to adopt the road as it connects up the existing council road to several council tax paying households. As it stands, while the road is in use and is hugely beneficial to life on the island however the maintenance burden on IKDT is not ideal. The council will not consider adoption until the road is brought up to the standard we had planned for stage 2 so we are hoping to complete the job. Adoption is key to the long term future of the road and indeed to whole community as it will allow unfettered access to all including vital services, emergency vehicles and access to the lifeline ferry service. The surfacing could be delivered in one week but the effects would be felt for generations to come. We would hope to continue the excellent working relationship with A&B Roads department to help deliver the best value for money possible.

Old forestry buildings

Creating a Cairnbaan Community Hub. Refurbishment of the old forestry buildings

2025-05-30  •  No comments  •  Cairnbaan Community Trust  •  Regeneration Capital Grant Fund

1. What we want to achieve.

The Cairnbaan Community Trust, (SC052905) wants to refurbish the forestry buildings to provide a community gathering point and flexible workshop and event spaces. We want a community hub that can be used by the community for education such as crafts and Gaelic, health e.g. yoga and other activities, recreation and social gatherings, inside and outside and temporary office space for local entrepreneurs.

Our priority is the smaller of the two buildings which will provide space for community events and workshops, social meeting space, hot desks and a community kitchen. There is external space that can be developed to provide a community garden and outside event space.  It is hoped in the future the larger of the two buildings can be developed to provide space for larger workshops and events.

We have divided the work into phases and we are currently seeking funding for phases 1 and 2. 

Phase 0: This covers the procurement of the forestry buildings under a community asset transfer funded by the Scottish Land Fund and we have secured initial funding for essential repairs to both buildings to make them safe and weatherproof.  The work will start when we take ownership on the 01/08/2025.

Phase 1: Is the refurbishment of the smaller building.  This phase will change the internal layout of the building to create flexible spaces.  This entails new partitions, doors, lighting and upgrade to the heating.  Additional facilities, external and internal, will be needed for disabled and users with special needs.  We also aim to fit a community kitchen and social space for coffee mornings.   Finally we need to replace windows and install new furnishings and fittings.

Phase 2: Is the landscaping and provision of a community garden and outdoor space.   

Phase 3: Is the refurbishment and fitting out of the larger building.  In this phase we also plan to look at energy efficiency improvements, e.g. heat pumps and solar panels.

2. Why our project is needed

Currently there is no community centre to provide a focal point or resources for the community.   There is a risk of social isolation amongst our older population and there are no facilities for the young people in our village.  Community cohesion is being eroded.

We commissioned a feasibility report through Community Enterprise which highlighted the following points. Accessing facilities is difficult without a car, the minimal bus service is a school service with no evening or Sunday services.  There are no shops, medical or other services in the village.  Despite scoring highly in other domains the area falls into the 10% most deprived areas in Scotland in terms of access to services in relation to the Scottish indices of multiple deprivation. Feedback from local people highlighted that a primary need in the community is an indoor social area and meeting space.

3. The positive changes our project will bring

Our vision is to reduce isolation, improve community life and reflect the cultural, environment and historic heritage of the area. The current priorities for the CCT are.

  • Bringing the community together to enable opportunities for social interaction and growth.
  • Advancement of arts, heritage, culture and science.
  • The provision and organization of recreational facilities to improve the quality of life for the community.
  • Improving the environment including education about the environment, culture and history.
  • The relief of thos in need either because of age, ill health, disability or financial hardship.

The refurbishment of the buidings will provide a focal point for the community and the resources to bring the community together especially those that feel isolated. It will provide resources for all ages across the community and give everyone opportunities for development and a sense of purpose and indentity.

Through current engagement with the local community we have already identified skills and volunteers that can contribute to the refurbishment which will foster community involvement from the outset

4. How long will our project run

Phase 1 and 2 of the project will start on: 05/01/2026

The project will run for: 15 months

Our Business plan and the Feasibility report are available on request.  Unfortunately the file size was too big to attach.

Dunoon Skatepark.jpg

Dunoon Skatepark Redevelopment

2025-05-30  •  No comments  •  Dunoon Community Development Trust  •  Regeneration Capital Grant Fund

Dunoon Community Development Trust wants to work with children and young people to design and develop a new skatepark facility in Dunoon that will better meet their needs and encourage increased outdoor activity and community connection.

Dunoon Skatepark is sited in Ardenslate, one of two areas in the town within the highest decile of the Scottish Index of Multiple Deprivation.  The original skatepark was campaigned for and developed by local young almost 20 years ago and its creation was a major achievement for those involved. It was well used for several years, however, the original steel structures and rough surfacing are no longer fit for purpose and levels of use have seriously declined. Some elements of the facility present a significant hazard, especially for learners, so there are very few younger users or family involvement. Local young people and young adults have been actively involved in campaigning for improvements to the skatepark gathering hundreds of signatures on their petition on Change.org  Recent engagement with school pupils has confirmed their interest in improved facilities for skating and wheeling on the site.

By developing this facility to better meet the needs of skateboarders, in-line skaters and BMX bikers of all abilities, we will be able to support and encourage children, young people and young adults to build their skills and enjoy peer-to-peer learning experiences. More time spent outdoors engaging in interesting physical activities will help to address the health and wellbeing challenges faced by young people and young adults and help to reduce social isolation.

This project will run for between 12 and 18 months including consultation, design, planning, permissions and construction.

The skatepark is situated on land owned by Argyll & Bute Council so it will be vital to work in partnership with them. Consultation will also involve local schools, Dunoon Community Council and Live Argyll youth work team.

Community Village Hall/Community Hub

Clachan Village Hall/Community Hub Phoenix project

2025-06-02  •  No comments  •  Clachan Village Hall (Kintyre) SCIO SC050324  •  Regeneration Capital Grant Fund

Clachan lost its much loved and well used village hall due to terminal decline as an asbestos concrete roofed building with corroded portal flames and was demolished in 2022. The iconic historic B Lited Kilcalmonell church was purchased with a Scottish Land Fund grant to serve as a replacement village hall to arise like the proverbial phoenix from the ashes of the old hall. The hub will allow resumption of the dormant user group activities and will provide a recreational, educational venue for the comunity as well as a resource for private hire. It will also serve as an emergency centre to provide safe haven and meal provision at times of emergency such as has occured on many occasions over the past 10 years particualrly in relation to power cuts, village floods, a freak snow storm, and gales, some of which also resulted in blocking the A83 artery to Campbeltown. We are in the process of renovating the exisitng church building to provide the main comunal space and this work shold be completed by the end of the year.  This is being funded in part by are own fund raising initiatives and by local wind farm trust grants. We then need grant funding for the extension to provides the addtional space for : a catering/kitchen area, a small meeting room, additional storage and toilet provision with disabled access for larger capacity events and activities. It is is this extension project (phase 2) that we are seeking funding from the RCGF scheme as well as other agencies such as the Windfarm Trusts, and other grant funders. We are looking for this construction work to be done 2026-2027.

WEbsite image 13 .jpg

MACPool Activity Hub: Sustainability

2025-05-22  •  No comments  •  Mid Argyll Community Enterprises Limited  •  Regeneration Capital Grant Fund

MACPool Activity Hub is a local community hub settled within the rural area of Lochgilphead. We currently service the area of Mid Argyll, where the population is approximately 6,000 people. On an average week, we will provide services such as specialised swimming sessions, fitness classes and Learn to Swim lessons, where over 500 regular participants will attend the Activity Hub.

MACPool Activity Hub works closely with rural school with promoting Water Safety Sessions and scheduled blocks of weekly lessons to pupils. The main Learn to Swim program caters to more than 220 participants from a 25 mile radius on a weekly basis, with ages ranging from 4-75 years old.

We offer a range of programs designed to specialise in different needs such as our Toddler Time sessions to classes such as HyrdoMobility, a senior exercise class, focusing on water-based exercises to strengthen the core and increase stability.

In collaboration with RMFitness and the NHS Living Well Program, MACPool Activity Hub has been assisting with the rehabilitation within the senior community, providing a bespoke area to re-build confidence, both in and out of the water. 

We also host Additional Support Needs (ASN) and Young Carer sessions in partnership with the Mid Argyll Youth Development Services (MAYDS), providing a safe space for those in the community who may not otherwise have access to such spaces. 

In accordance with our sustainability principles, MACPool Activity Hub is a part of the Renewable Heating Incentive (RHI) scheme. Therefore, the Hub uses a biomass boiler that is fuelled by woodchips to produce the necessary heating for the swimming pool and hot water systems. MACPool Activity Hub is also a part of the Feed In Tariff (FIT) scheme and have over 100 solar panels, which generate renewable electricity.

During previous winters, however, the quality of the fuel source has declined, causing our boilers to malfunction. It is essential that our boilers remain fully operational to comply with regulations concerning water and air temperatures. When we do not meet these regulations, we are forced to close the pool, cancelling valuable swimming lessons, fitness classes and pre-programmed sessions, thus losing credibility and revenue.

Our vision is to expand on the foundations of what we have created so far, improving integral community bonds, while seeking other connections to become a cornerstone of the community. To sustain our efforts, we aim to secure funding for a secondary heating source and to upgrade the storage silo, to allow us to change over from woodchips to wood pellets. This will enable us to remain in the RHI scheme while continuing to develop our programs and timetable, while also fostering partnerships that align with the needs of the community. 

Shed letterhead (cropped).jpeg

Strachur Community Men's Shed

2025-05-22  •  No comments  •  Strachur Community Mens Shed  •  Regeneration Capital Grant Fund

Our primary aim is to build a safe social/recreational workshop and creative workspace for retired men & women to undertake creative projects for the village and local district. This should assist in improving the appearance of Strachur and surrounding area for the benefit of the local community and visitors e.g. by reconstituting picnic areas that have fallen into disrepair, also by maintaining benches; fences etc. such as those in our community Heron Park and installing sculpture/art works where agreed as appropriate. Similar maintenance and creative projects would be made available to the district  with the involvement of people domiciled within a 10 mile radius. Existing craft and trade skills that 'Shed' members possess would be used to do this, hopefully enabling members to learn new skills as well. Other local organizations  would also benefit e.g. the local Youth/Drama Group where members could assist in the manufacture of costumes and scenery for the regular annual productions at reduced cost.

Like many small rural villages Strachur has an increasing population of retirees. We hope that involvement in local projects - through teamwork - would help in reducing feelings of isolation for the 'older' members of our community by providing mental and physical stimulation, thus showing the 'younger' members of our community that we still have something to contribute to village life whilst improving recreational facilities for all. This approach should enable the facility to be sustained for many years as people become aware of the projects we are involved in. The provision of workshop facilities should also benefit the village Memorial Hall by providing support for maintenance and supplementing the facilities available in the centre of the village. To this end we want to work with the local Development Corporation; the Village Hall Committee and the Organisations that use the limited facilities available at present.