Inveraray Pier- A neglected Pearl of a Great Town
2025-05-31 • No comments • • Regeneration Capital Grant Fund
Inveraray Pier has been in a cycle of neglectful private ownership for over 20 years, and closed to the community, visitors and marine traffic for 10 years. In July 2023 Inspire Inveraray secured funding to purchase the pier on behalf of the community and has since successfully restored and opened the stone part of the pier to the public, however the timber pier remains closed and is in desperate need of restoration.
The objective of the project is the restoration and opening of the existing timber peir. The heritage of the timber pier is at the heart of the community, and was identified as a priority in a recent community consultation. The timber pier is in extremely poor condition and ,without restoration, the risk of loss of a valuable local asset is inevitable.
Restoration works will commence as soon as funding has been achieved, ideally starting in October 2025.
The community ownership of the pier has given a sense of pride and achievement to local people who are now keen to help and get involved to get the timber part of the pier restored. This is the opportunity for the local community to manage a valuable local asset and to complete the full restoration of the pier including the timber part. Reopening the pier has connected local communities and is building confidence in the achievability and benefits of community asset ownership.
The pier is the gateway to Inveraray and for the past 10 years had been an eye sore in the town. Restoring the timber part of the pier will help increase the number of visitors to the town by boat, creating an opportunity to generate an income that can be reinvested into community projects.
The pier will be a flat and open accessible space encouraging activities such as water sports, community events and gatherings amongst the local community. Fully restoring the timber part will allow more vessels to moor in Inveraray, serving as a safe transfer platform for cargo and passengers.
Once fully restored, Heritage boards will be commissioned for placement on the pier to provide historical background for local people and visitors visiting Inveraray and its treasured pier.
Sonas Childcare Project
2025-05-26 • No comments • • Regeneration Capital Grant Fund
SID plans to build a dedicated childcare facility to cater for babies and toddlers up to three years old and provide dedicated childcare services for the community. This building will complement the soon to be finished new community Pavilion, and will be set within the 16 acres of Playing Fields, with access to a nearby enclosed playpark, and plenty of green space.
On Islay there are a very limited number of childminders available. Islay has had a steady number of babies born in the last three years (ranging from 20-22 babies/year) and this is predicted to rise. Due to the lack of services available, families are using relatives and friends as childminders to allow them to return to work. The provision of a dedicated childcare facility would provide flexibility with this.
The facility will bring the following positive changes:
- More flexibility for families with regards to 0 to 3 childcare options.
- More opportunities for families to work childcare around their needs, enabling parents to return to work.
- Families may be encouraged to move to Islay, as instead of having severely limited childcare options there will be a dedicated facility.
- It will provide options for employment and training within the facility. It may help provide an opportunity for students and school leavers to gain work experience in their chosen field, without having to leave Islay.
It is anticipated that it will be several years before the facility is up and running. The project is currently in the early stages. A Planning Application has been submitted to Argyll & Bute Council, and the Building Warrant has been completed as far as possible, given the current funding restrictions. SID are currently looking for funding to finalise the Building Warrant, and move on to the construction phases.
Portsonachan Hall Rennovation & Modernisation Project
2025-05-30 • No comments • • Regeneration Capital Grant Fund
We want to modernise and improve our village hall which has remained unchanged for almost 100 years so that it can remain at the heart of our unique loch-side community for another century.
We are a close-knit community, but geographically remote, stretching 18 linear miles down Loch Awe-side. Ensuring we have a Village Hall that is fit for purpose is essential to keep us together, especially through the long autumn and winter months. The Hall provides us with a way of keeping in touch, offering people company and activities when there are so few amenities within the proximity of our community. Our Hall is home to about 13 different community groups, each with approximately 10-20 members. The Hall also provides an important resource for meetings for the South Lochaweside Community Company and the Glenorchy and Innishail Community Council as two examples. Having this space is vital for ensuring we can maintain such activities which allow our community a voice within the democratic process. We also hold many social evenings, which bring together new members of the community looking to integrate as well as many of the established community who would not get to see each other without the Hall. Our most recent BBQ brought in 90 people and our Sunday lunch catered for 30 people, and many of whom said without having this event, they would have spent their weekend alone.
The closure of the local bar recently has left a void in the community with the hall now the only communal space where members of the community can come together.
Having a space that is safe, warm and usable is a lifeline for rural communities like ours, and has wide-reaching impacts, including on our community's health and wellbeing. Given the age of our existing hall we need to refurbish our Hall to ensure it can continue to serve our community and for it to become more environmentally-considerate.
Full planning permission was granted for the rennovation project in May 2025. We can now begin work on the creation of our project management plan which is likely to be divided into distinct phases.
We anticipate that this project will take a year to a year and half to complete, during which time we will partner with Glenorchy & Innishail Community Council, South Loch Awe Community Company, Dalmally Community Company and Orchy & Awe Community Trust.

MACPool Activity Hub: Sustainability
2025-05-22 • No comments • • Regeneration Capital Grant Fund
MACPool Activity Hub is a local community hub settled within the rural area of Lochgilphead. We currently service the area of Mid Argyll, where the population is approximately 6,000 people. On an average week, we will provide services such as specialised swimming sessions, fitness classes and Learn to Swim lessons, where over 500 regular participants will attend the Activity Hub.
MACPool Activity Hub works closely with rural school with promoting Water Safety Sessions and scheduled blocks of weekly lessons to pupils. The main Learn to Swim program caters to more than 220 participants from a 25 mile radius on a weekly basis, with ages ranging from 4-75 years old.
We offer a range of programs designed to specialise in different needs such as our Toddler Time sessions to classes such as HyrdoMobility, a senior exercise class, focusing on water-based exercises to strengthen the core and increase stability.
In collaboration with RMFitness and the NHS Living Well Program, MACPool Activity Hub has been assisting with the rehabilitation within the senior community, providing a bespoke area to re-build confidence, both in and out of the water.
We also host Additional Support Needs (ASN) and Young Carer sessions in partnership with the Mid Argyll Youth Development Services (MAYDS), providing a safe space for those in the community who may not otherwise have access to such spaces.
In accordance with our sustainability principles, MACPool Activity Hub is a part of the Renewable Heating Incentive (RHI) scheme. Therefore, the Hub uses a biomass boiler that is fuelled by woodchips to produce the necessary heating for the swimming pool and hot water systems. MACPool Activity Hub is also a part of the Feed In Tariff (FIT) scheme and have over 100 solar panels, which generate renewable electricity.
During previous winters, however, the quality of the fuel source has declined, causing our boilers to malfunction. It is essential that our boilers remain fully operational to comply with regulations concerning water and air temperatures. When we do not meet these regulations, we are forced to close the pool, cancelling valuable swimming lessons, fitness classes and pre-programmed sessions, thus losing credibility and revenue.
Our vision is to expand on the foundations of what we have created so far, improving integral community bonds, while seeking other connections to become a cornerstone of the community. To sustain our efforts, we aim to secure funding for a secondary heating source and to upgrade the storage silo, to allow us to change over from woodchips to wood pellets. This will enable us to remain in the RHI scheme while continuing to develop our programs and timetable, while also fostering partnerships that align with the needs of the community.

Creating a Community Growing Space in Oban Town Centre
2025-06-02 • No comments • • Regeneration Capital Grant Fund
This project meets RCGF criteria: address vacant / derelict land as well as supporting locally developed, place-based regeneration projects that involve local communities, helping to tackle inequalities and improving the economic, social and physical environment of deprived, disadvantaged and fragile remote communities across Scotland. It is community led, and will result in strong regeneration outcomes.
The Rockfield Garden is leased and run by Oban Communities Trust, a Community Benefit Society run by and for its members and the wider community.
We are transforming a disused, previously cultivated food production area into a vibrant and inclusive community growing space, but need funding to realise our vision. This project is rooted in a growing community movement: over the past year, more than 1,100 volunteer hours have been contributed at The Rockfield Garden. The momentum is clear—and this garden will be a living, growing symbol of community action.
The space, located behind The Rockfield Centre, was previously used to grow fruit, vegetables, and flowers for the former McTavish's Kitchens, but has since lain derelict.
What will your project do? Over the last 12 months a 25+ band of volunteers have spend over 1000 hours on Phase 1, preparing the space for cultivation. We are now seeking funding for Phase 2, which will initiate food production and support both experienced and novice growers, fostering strong community involvement.
- Installing fencing and handrails to ensure safety and accessibility
- Building raised beds and flexible growing spaces for communal and individual use
- Constructing a weatherproof meeting shelter and a secure tool shed.
- Providing tools, gardening equipment, seeds, compost, and plants.
- Developing a community composting system to promote circular growing practices.
- Installing bee hives, chicken coops, and a community orchard
- Offering a varied programme of community engagement and educational growing activities, including informal social gardening drop-ins, volunteer action days, and community education.
Why is your project needed? Oban currently has no community growing provision, and local residents lack accessible opportunities to grow, learn, and contribute. As a rural town we are also heavily reliant on imported food, reducing local food resilience and creating disproportionately high food mile loadings. This project will:
- Provide the community with growing space, tools, and support to grow food locally.
- Encourage healthier lifestyles and increased social connection through shared, hands-on activity
- Respond to the pressing need for increased food resilience in the face of climate change and supply chain vulnerabilities.
- Help diversify the town’s food sources, reducing reliance on imported produce and associated transport emissions.
- Create a learning hub to build knowledge and practical skills in sustainable food growing, composting, and ecological gardening
- Offer a mix of communal and some individually managed plots, providing flexibility to suit different needs and abilities.
- Enhance community cohesion and empowerment through participation, ownership, and shared outcomes.
- Contribute to the Rockfield Centre's mission to reduce its carbon footprint and provide wholesome, healthy, affordable community meals.
What positive changes will your project bring about? The Rockfield Garden will deliver wide-ranging benefits across environmental, social, and educational areas:
- Environmental Impact: With an estimated growing area of 1,400m², there is potential to produce 2,000–3,000kg of fruit and vegetables annually. This local production could reduce food miles and cut an estimated 3–4 tonnes of CO₂ emissions per year.
- Food Resilience: In light of climate change and global food supply threats, local food production is a vital adaptation strategy. Growing food locally in Oban will contribute to community-level food security and resilience.
- Health and Wellbeing: Access to growing spaces and outdoor activities supports mental and physical wellbeing. Gardening fosters regular physical activity, better nutrition, and emotional connection to nature.
- Learning and Empowerment: Hands-on education will equip participants with valuable skills in food production, sustainability, and ecological stewardship.
- Community Cohesion: The project will bring together people of all ages and backgrounds, strengthening social bonds, reducing isolation, and building a sense of place and purpose.
- Sustainability: By incorporating composting and circular practices, such as seed saving, the garden will serve as a practical example of sustainable community living. By transforming this underused land into a thriving garden, we’re not just growing food—we’re growing community, resilience, and shared futures.
How long will your project run for? This is a long-term project that is ticking along in Phase 1, but requires substantial funding to move to Phase 2. Once funded, we anticipate c. 1 year to do the required structural works. We anticipate the total works requiring c. 70k, including staff time, but would gladly accept smaller amounts of funding which would allow us to complete the project in a modular fashion.

Lighting up the Skerryvore Lighthouse Shore Station - The Lighthouse Cottages
2025-05-30 • No comments • • Regeneration Capital Grant Fund
1 We need to repoint the external stonework and do work on the chimneys and roof of the 4 lighthouse cottages. No maintenance work has been done for many years and there has been major issues with damp and water damage in these 4 properties. There is a critical housing shortage on Tiree and in particular affordable housing. We have now 2 of the cottages on long term lease to locals and would like to make the other 2 habitable for long term lease. We would also like to use this opportunity to encourage young people on Tiree to consider construction and in particular stonemasonry as a possible career. The team we would use, have experience of running training programmes for school pupils to come and work on the site and learn some of the basic skills of maintainting heritage buildings. This added value to the project would bring a very useful experience to our local children who are disadvantaged at present from these type of careers activities. We would also offer to design a long term training programme for a local person so that we could have local skills to maintain the A listed heritage buildings on our site.
2 We funded work late last year on two of the chimneys by a stonemason specialising in these kind of listed buildings. He has advised that all the external walls, chimneys and roof require work done to preserve these wonderful buildings. The work he did was enough to sort the immediate issues of dampness coming from the chimneys. There is still some damp coming through the walls/windows. Also the other chimneys that we did not repair mean that two of the cottages are not fit for long term lease at the moment. Funding has been recieved by Argyll and Bute Council to allow us to the internal upgrading but we require major funding for all the external works so that we an offer 4 good quality upgraded affordable homes for locals. One of the issues has been lack of maintenance of all the A listed buildings on our site. There has been some repair work done but it has exaccerbated the problems due to lack of knowledge. These buildilng require specialist skills. If we can train up someone locally to do the basic ongoing maintenance through this project this would be of huge long term benefit to the Hynish Trust.
3 When we advertised the last cottage for lease we got 5 applicants. They were all local people wanting to come to live at Hynish. Our vision is to create a clachan type village at the Skerrryvore Shore Station in Hynish for people to live, play, learn and enjoy. The demand is there amongst the community for long term affordable housing and this is a relatively quick win to maintain the two leases we have and create another two. But more importantly to ensure the buildings are presrved for the long term future. So the refurbishment of the externals of these buildings would be transformational for the Hynish Trust. It would ensure that these buildings will be fit for purpose for the future. It also addresses the critical housing situation. Providing an opportunity for local children to experience somehting different as a possible career opportunity would be welcomed by the school and the community. If we can also get a local person trained up to be able to maintain all our buildings externally this would be a long term benefit to the community and create much needed local employment.
4 The project would start in March 26 and run to September 26.

Creating a Cairnbaan Community Hub. Refurbishment of the old forestry buildings
2025-05-30 • No comments • • Regeneration Capital Grant Fund
1. What we want to achieve.
The Cairnbaan Community Trust, (SC052905) wants to refurbish the forestry buildings to provide a community gathering point and flexible workshop and event spaces. We want a community hub that can be used by the community for education such as crafts and Gaelic, health e.g. yoga and other activities, recreation and social gatherings, inside and outside and temporary office space for local entrepreneurs.
Our priority is the smaller of the two buildings which will provide space for community events and workshops, social meeting space, hot desks and a community kitchen. There is external space that can be developed to provide a community garden and outside event space. It is hoped in the future the larger of the two buildings can be developed to provide space for larger workshops and events.
We have divided the work into phases and we are currently seeking funding for phases 1 and 2.
Phase 0: This covers the procurement of the forestry buildings under a community asset transfer funded by the Scottish Land Fund and we have secured initial funding for essential repairs to both buildings to make them safe and weatherproof. The work will start when we take ownership on the 01/08/2025.
Phase 1: Is the refurbishment of the smaller building. This phase will change the internal layout of the building to create flexible spaces. This entails new partitions, doors, lighting and upgrade to the heating. Additional facilities, external and internal, will be needed for disabled and users with special needs. We also aim to fit a community kitchen and social space for coffee mornings. Finally we need to replace windows and install new furnishings and fittings.
Phase 2: Is the landscaping and provision of a community garden and outdoor space.
Phase 3: Is the refurbishment and fitting out of the larger building. In this phase we also plan to look at energy efficiency improvements, e.g. heat pumps and solar panels.
2. Why our project is needed
Currently there is no community centre to provide a focal point or resources for the community. There is a risk of social isolation amongst our older population and there are no facilities for the young people in our village. Community cohesion is being eroded.
We commissioned a feasibility report through Community Enterprise which highlighted the following points. Accessing facilities is difficult without a car, the minimal bus service is a school service with no evening or Sunday services. There are no shops, medical or other services in the village. Despite scoring highly in other domains the area falls into the 10% most deprived areas in Scotland in terms of access to services in relation to the Scottish indices of multiple deprivation. Feedback from local people highlighted that a primary need in the community is an indoor social area and meeting space.
3. The positive changes our project will bring
Our vision is to reduce isolation, improve community life and reflect the cultural, environment and historic heritage of the area. The current priorities for the CCT are.
- Bringing the community together to enable opportunities for social interaction and growth.
- Advancement of arts, heritage, culture and science.
- The provision and organization of recreational facilities to improve the quality of life for the community.
- Improving the environment including education about the environment, culture and history.
- The relief of thos in need either because of age, ill health, disability or financial hardship.
The refurbishment of the buidings will provide a focal point for the community and the resources to bring the community together especially those that feel isolated. It will provide resources for all ages across the community and give everyone opportunities for development and a sense of purpose and indentity.
Through current engagement with the local community we have already identified skills and volunteers that can contribute to the refurbishment which will foster community involvement from the outset
4. How long will our project run
Phase 1 and 2 of the project will start on: 05/01/2026
The project will run for: 15 months
Our Business plan and the Feasibility report are available on request. Unfortunately the file size was too big to attach.

Sandbank Village Hall (SVH) – The Next 100 Years!
2025-06-02 • No comments • • Regeneration Capital Grant Fund
- What do you want to do? Describe the activities your project will carry out and list any partner organisations.
- SVH Management Committee is seeking funding to redevelop the village hall in a rural community where there are no other community facilities. The hall hosts a range of groups and services, such as yoga classes, family celebrations, presentations e.g. local wind farm, fundraising events and acts as a polling station during local and national elections.
- Why is your project needed? Summarise the evidence showing your community needs this project. Help!
Today, SVH remains a vital institution within the village, embodying a rich heritage and an unwavering commitment to community values. It stands as a reminder of the village's history, a venue for collective memory, and a beacon of fellowship. The hall continues to host a diverse range of activities, adapting to contemporary needs while preserving its historical essence.
- What positive changes will your project bring about? Describe the benefits for participants. Help!
The SVH project will help deliver community needs which evidence: -
- Clear and genuine need.
- Relevant and appropriate consultation.
- The ability to keep the site in good order and well maintained once the project is complete.
- Reasonable costs which offer good value.
- The ability to deliver the project on time and on budget.
- The project’s outcomes will benefit the natural, social or built environment and make a positive impact on local communities.
- How long will your project run for? Provide the project duration and estimated start date.
From 1st April 2025 to 31 March 2026

Dunoon Pier
2025-03-26 • No comments • • Regeneration Capital Grant Fund
Operating under the governance of the Dunoon Community Development Trust and in partnership with Argyll and Bute Council, the Save the Pier working group has been actively seeking funding and carrying out further research to progress the necessary technical studies needed to inform these types of developments.
The initial goal of the working group is to develop a robust, evidence-based feasibility study, providing a clear case for the pier’s redevelopment and its potential role within the future of the town’s wider marine infrastructure. Longer-term they hope to begin the process of the pier’s renovation.
The wider team —comprising volunteers with expertise in public sector infrastructure, finance, heritage preservation, project development and community engagement —has been engaging with stakeholders in the public and private sector, having discussions with potential funders, and laying the groundwork to ensure any future redevelopment is viable and sustainable.
Our Progress So Far
The project has involved extensive positive collaboration with Argyll and Bute Council, alongside wider stakeholder consultations, a public petition, and collaboration with advisors in major infrastructure, heritage conservation, and funding options.
Community Involvement
Community engagement will be essential to shaping the pier’s future. There has consistently been a lot of interest on social media and in the newspaper with large numbers of people getting behind the idea of Dunoon Pier being regenerated. It is clear that there is good community support for the idea and the working group welcomes the input of local residents, businesses, and local organisations as the project evolves.
At this stage, the focus is on gathering the necessary technical and financial evidence to determine what is achievable.
Next Steps
Funding is currently being secured to complete a feasibility study, which will provide a comprehensive assessment of the pier’s future potential. This study will form the foundation for securing funding to progress any future redevelopment. However, given the scale of the project, careful planning and a phased approach is required. We aim to complete this initial phase and be in a position to share the feasibility study by Summer 2025.
Looking Ahead
Public infrastructure projects of this scale take time, but the dedication of the team working with the support of the local authority and Dunoon Community Development Trust means that there is a good chance that this project will progress positively. The Dunoon Pier working group is committed to communicating on their progress and will provide regular updates via Dunoon Community Development Trust and partners as the project moves forward.

Lighting Up the Shore Station - a sustainable Hub for Tiree
2025-05-27 • No comments • • Regeneration Capital Grant Fund
1 We would like to refurbish Alan Stevenson House (ASH) to offer a locally inspired restaurant, bar with 6 ensuite rooms (1 disabled). We would like to upgrade the Harbour with pontoons and seating/viewpoints to take in the wonderful natural environment and encourage people to come by boat to the site in the summer months. Morton Boyd Hall (MBH) is an excellent multi purpose facility that just needs some upgrading and could complment any activities going on at the site. The site at Hynish, with its heritage and special quality of place, has the opportunity to develop its local hospitality and develop something of a Hub for the southern end of the island. Capturing tourism and events spend, alongside island/day visitor spend would provide a revenue stream.
2 The Skerryvore Shore Station was transferred to the Tiree community in January 25. The transition has taken 3 years. There are 3 income streams - Housing, Heritage and Business - that will ensure it is a sustainable community organisation going forward. We have been reviewing the use of our 20+ A listed buildings to ensure they are fit for purpose and revenue earning where possible. ASH was first rebuilt in 1990 as a hostel type accomodation for groups with special needs. it was only used for a few weeks in the summer months and was always a overhead for the charity. MBH had been used to house the exhibition/museum but originally had been rebuilt as a multi purpose hall. The harbour stands strong against the incredible tides and weather. It is a viewpoint for sealife and birds. The community when asked what they would like to see at the site in our survey and subsequent community events were clear that Business should be a priority. 84% said that they wanted a restaurant/cafe, quality accomodation and event space all year round. They also wanted the Harbour preserved. So our community mandate was clear. We have piloted the restaurant and rooms over the past 2 years and now believe that it could definately work if we had a good standard of accomodation to offer and a multi purpose space for events. We have moved the exhbition to another building to free up Morton Boyd Hall so that we have a this multi purpose facility. We will then be able to work with community groups to put on a variety of events and functions during the year. We will also be able to provide permanent employment for locals.
3 We can already see from our pilot that our community is very positive about the fact we have a local family working at ASH and have created year round employment for locals. We have trialled a number of community events over last winter and they proved to be very popular. The Tiree people just love the shore station and feel a strong sense of guardianship. The pilot has also showed us that we could have a reasonable income stream from this. We now have some facts and figures to base our projections on which gives us confidence this is the right way forward. All the buildings at Hynish need to work and complement each other to ensure the "place" is kept in alignment. The pilot has demonstrated that the restaurant/rooms/bar and events do contribute greatly to this. The project would enhance the employment opportunities; keep a family with 3 children living on Tiree as they have jobs; provide the much needed income stream to ensure sustainability; reduce running costs; make the buildings all more energy efficient and in line with our aim to lower the carbon footprint and provice a place for people and business to floutish.
4 The project will start early in 2026 and be completed by November 2026.