Isle of Mull Wet Weather Sports Hall
2025-06-01 • No comments • • Regeneration Capital Grant Fund
What do you want to do?
Build a wet weather and indoor sports hall next to the Island playing fields at Garmony, near Craignure.
A healthy lifestyle is essential for the well being of a community. A core pillar of attaining health is access to physical activity. Over the past 20 years there has been a dramatic weather change on our island. Gone are the frosty days and snow covered mountains. During winters it rains most days and is often stormy. As a direct result of this sports participation on Mull has fallen away at an alarming rate. The proposed project is to construct a desperately needed Wet Weather Sports Hall. The project has significant support from throughout Mull. This was reinforced by active participation by our Community Council who submitted our application for full planning permission. This facility will be available for all to use. The Mull Rugby Club will be in full consultation with Sportscotland on a fair and equitable way to manage the facility.
Why is your project needed?
There is no wet weather or indoor sports hall on Mull. As Mull is an island people cannot travel to facilities elsewhere without difficulty. They must be provided locally.
Apart from greatly improving life on Mull this project will be invaluable to existing community sports groups, create opportunities for new organisations and, hopefully, re-establish some we have lost. Many events are organised at the Garmony playing fields but with the increase in inclement weather these often have to be cancelled on the day of the event. For example our island sports day has now been abandoned after many disruptions due to weather. It cannot proceed on wet grass. This was sole destroying for all involved. A cancellation causes great disruption to island life due to difficulties of communication as children are travelling by a variety of methods from up to 40 miles away and in different directions. With the hall this event could move inside if it was raining. The hall would also give our indoor athletes a suitable premises and allow them to have well catered home events on Mull. At last Mull would have a full sized basketball court and could, for the first time, play home games and join leagues. The facility would mean evening training for all sports could always go ahead no-matter the weather. Multiple badminton courts would provide an exciting and competitive space. It will even accommodate a tennis court for our keen players. It is heart breaking to record that the once very active Isle of Mull Football Association is no longer in existence. There is still a strong football presence on Mull and this facility will provide an indoor pitch giving an gateway to football participation in all weathers. And finally our own club, the Isle of Mull Rugby Club has seen a drastic decrease in player numbers over recent years. Training is almost always in wet, cold windy weather. This is disheartening for the players and leads to more injuries as the fitness to participate is diminished.
What positive changes will your project bring about?
This project will enrich life on the Island of Mull.
For the active participants the wet weather hall will provide a comfortable environment. This results in higher skill levels and increasing participation. For voluntary officials it will enhance achievement and remove the demoralising effect of bad weather. For communities it will encourage supporting roles and family involvement across all sports and leisure activities. The project also aligns with many lifestyle priorities. Well-being is improved. A tailored space protected from a hostile environment encourages diversity and inclusion for all. Try running a fun day in horizontal rain and our use of words becomes well chosen as only the hardy participate. Performance is improved across all age groups and skill levels leading to enhanced personal satisfaction.
It is highly probable that a project of this nature will encourage local families to stay on Mull and remove barriers to decisions on whether to move to our island. It is therefore considered that the project will have a positive impact on the population of our island. The Mull Community Council was unanimous in its support of the project.
By situating this project at Garmony it becomes part of a prooven sports destination. The Isle of Mull Rugby Sevens takes place at Garmony and this event has attracted teams from as far away as America with four figure attendances each year. Members and players of visiting teams and organisations will find the experience of using the facility highly rewarding.
How long will your project run for?
This project is stage three of the long term development of sports facilities at Garmony on the Isle of Mull.
Out of a need for playing facilities the Isle of Mull Rugby Club decided to embark on a long term development of sports facilities for the island. There were none available on Mull. An island survey by Tobermory High School selected Garmony as it was in a central position on Mull and was situated between the two main ferry terminals of Craignure and Fishnish.
Stage 1 Building a two pitch sports field from scratch on waste ground. Successfully completed.
Stage 2 Building changing rooms and community club house with kitchen. Successfully completed.
Stage 3 Building a wet weather facility. This objective was always planned but has become a matter of urgency in recent years. We project a start date and completion in 2026
The existing Garmony facilities are available for all to use. They also receive no revenue support and are fully self-supporting financially. We anticipate the same for Stage 3.
Sandbank Village Hall (SVH) – The Next 100 Years!
2025-06-02 • No comments • • Regeneration Capital Grant Fund
- What do you want to do? Describe the activities your project will carry out and list any partner organisations.
- SVH Management Committee is seeking funding to redevelop the village hall in a rural community where there are no other community facilities. The hall hosts a range of groups and services, such as yoga classes, family celebrations, presentations e.g. local wind farm, fundraising events and acts as a polling station during local and national elections.
- Why is your project needed? Summarise the evidence showing your community needs this project. Help!
Today, SVH remains a vital institution within the village, embodying a rich heritage and an unwavering commitment to community values. It stands as a reminder of the village's history, a venue for collective memory, and a beacon of fellowship. The hall continues to host a diverse range of activities, adapting to contemporary needs while preserving its historical essence.
- What positive changes will your project bring about? Describe the benefits for participants. Help!
The SVH project will help deliver community needs which evidence: -
- Clear and genuine need.
- Relevant and appropriate consultation.
- The ability to keep the site in good order and well maintained once the project is complete.
- Reasonable costs which offer good value.
- The ability to deliver the project on time and on budget.
- The project’s outcomes will benefit the natural, social or built environment and make a positive impact on local communities.
- How long will your project run for? Provide the project duration and estimated start date.
From 1st April 2025 to 31 March 2026
Lighting up the Skerryvore Lighthouse Shore Station - The Lighthouse Cottages
2025-05-30 • No comments • • Regeneration Capital Grant Fund
1 We need to repoint the external stonework and do work on the chimneys and roof of the 4 lighthouse cottages. No maintenance work has been done for many years and there has been major issues with damp and water damage in these 4 properties. There is a critical housing shortage on Tiree and in particular affordable housing. We have now 2 of the cottages on long term lease to locals and would like to make the other 2 habitable for long term lease. We would also like to use this opportunity to encourage young people on Tiree to consider construction and in particular stonemasonry as a possible career. The team we would use, have experience of running training programmes for school pupils to come and work on the site and learn some of the basic skills of maintainting heritage buildings. This added value to the project would bring a very useful experience to our local children who are disadvantaged at present from these type of careers activities. We would also offer to design a long term training programme for a local person so that we could have local skills to maintain the A listed heritage buildings on our site.
2 We funded work late last year on two of the chimneys by a stonemason specialising in these kind of listed buildings. He has advised that all the external walls, chimneys and roof require work done to preserve these wonderful buildings. The work he did was enough to sort the immediate issues of dampness coming from the chimneys. There is still some damp coming through the walls/windows. Also the other chimneys that we did not repair mean that two of the cottages are not fit for long term lease at the moment. Funding has been recieved by Argyll and Bute Council to allow us to the internal upgrading but we require major funding for all the external works so that we an offer 4 good quality upgraded affordable homes for locals. One of the issues has been lack of maintenance of all the A listed buildings on our site. There has been some repair work done but it has exaccerbated the problems due to lack of knowledge. These buildilng require specialist skills. If we can train up someone locally to do the basic ongoing maintenance through this project this would be of huge long term benefit to the Hynish Trust.
3 When we advertised the last cottage for lease we got 5 applicants. They were all local people wanting to come to live at Hynish. Our vision is to create a clachan type village at the Skerrryvore Shore Station in Hynish for people to live, play, learn and enjoy. The demand is there amongst the community for long term affordable housing and this is a relatively quick win to maintain the two leases we have and create another two. But more importantly to ensure the buildings are presrved for the long term future. So the refurbishment of the externals of these buildings would be transformational for the Hynish Trust. It would ensure that these buildings will be fit for purpose for the future. It also addresses the critical housing situation. Providing an opportunity for local children to experience somehting different as a possible career opportunity would be welcomed by the school and the community. If we can also get a local person trained up to be able to maintain all our buildings externally this would be a long term benefit to the community and create much needed local employment.
4 The project would start in March 26 and run to September 26.
Sonas Childcare Project
2025-05-26 • No comments • • Regeneration Capital Grant Fund
SID plans to build a dedicated childcare facility to cater for babies and toddlers up to three years old and provide dedicated childcare services for the community. This building will complement the soon to be finished new community Pavilion, and will be set within the 16 acres of Playing Fields, with access to a nearby enclosed playpark, and plenty of green space.
On Islay there are a very limited number of childminders available. Islay has had a steady number of babies born in the last three years (ranging from 20-22 babies/year) and this is predicted to rise. Due to the lack of services available, families are using relatives and friends as childminders to allow them to return to work. The provision of a dedicated childcare facility would provide flexibility with this.
The facility will bring the following positive changes:
- More flexibility for families with regards to 0 to 3 childcare options.
- More opportunities for families to work childcare around their needs, enabling parents to return to work.
- Families may be encouraged to move to Islay, as instead of having severely limited childcare options there will be a dedicated facility.
- It will provide options for employment and training within the facility. It may help provide an opportunity for students and school leavers to gain work experience in their chosen field, without having to leave Islay.
It is anticipated that it will be several years before the facility is up and running. The project is currently in the early stages. A Planning Application has been submitted to Argyll & Bute Council, and the Building Warrant has been completed as far as possible, given the current funding restrictions. SID are currently looking for funding to finalise the Building Warrant, and move on to the construction phases.
Inveraray Pier- A neglected Pearl of a Great Town
2025-05-31 • No comments • • Regeneration Capital Grant Fund
Inveraray Pier has been in a cycle of neglectful private ownership for over 20 years, and closed to the community, visitors and marine traffic for 10 years. In July 2023 Inspire Inveraray secured funding to purchase the pier on behalf of the community and has since successfully restored and opened the stone part of the pier to the public, however the timber pier remains closed and is in desperate need of restoration.
The objective of the project is the restoration and opening of the existing timber peir. The heritage of the timber pier is at the heart of the community, and was identified as a priority in a recent community consultation. The timber pier is in extremely poor condition and ,without restoration, the risk of loss of a valuable local asset is inevitable.
Restoration works will commence as soon as funding has been achieved, ideally starting in October 2025.
The community ownership of the pier has given a sense of pride and achievement to local people who are now keen to help and get involved to get the timber part of the pier restored. This is the opportunity for the local community to manage a valuable local asset and to complete the full restoration of the pier including the timber part. Reopening the pier has connected local communities and is building confidence in the achievability and benefits of community asset ownership.
The pier is the gateway to Inveraray and for the past 10 years had been an eye sore in the town. Restoring the timber part of the pier will help increase the number of visitors to the town by boat, creating an opportunity to generate an income that can be reinvested into community projects.
The pier will be a flat and open accessible space encouraging activities such as water sports, community events and gatherings amongst the local community. Fully restoring the timber part will allow more vessels to moor in Inveraray, serving as a safe transfer platform for cargo and passengers.
Once fully restored, Heritage boards will be commissioned for placement on the pier to provide historical background for local people and visitors visiting Inveraray and its treasured pier.
From Small Seeds - Cornabus Community Forest Initiative
2025-05-08 • No comments • • Regeneration Capital Grant Fund
IDI has set aside an initial 25 acres of Cornabus Community Forest to deliver housing, a Community Orchard, Garden and allotments for the community.
In 2021 we carried out extensive consultation on the proposed development site within the now community owned Cornabus Forest. Formerly a commercial Sitka Spruce plantation, the whole site will eventually be replanted with native broadleaf to replicate the Atlantic Rainforest once prevalent on Islay, delivering significant biodiversity benefits but also on the community wish list from the consultation was housing for young people, allotments, an orchard and forest trails and a garden areas.
The project will endeavour to add social and environmental value to the site and also create a space for community members and groups to enjoy. In 2020 Islay lost it's well-known community garden at Islay House, due to the property being sold on the open market. This was a much loved and used community space. Although the site at Cornabus is not a walled garden, extensive research on other forest garden initiatives was carried out in 2022 - including visits to Royal Botanical Society managed forests and formal garden spaces, such as Benmore and Puck's Glen. The intention is to take some elements of the old community garden site and duplicate them and the new, with lots of additional features.
The project is highly ambitious, and the first stage of funding has been secured from Inspiring Scotland for development of the tree nursery site where we will grow the replacement trees. Secondary funding has come from Carbon Neutral Islands, specifically to create some of the infrastructure and assist with a circular economy approach to fuel wood supply on the island at affordable rates.
This is a lifetime legacy project that will create a destination for outdoor enjoyment but also offer a range of solutions to the socio-economic challenges that the island faces with a strong focus on becoming Carbon Neutral. Islay is in a housing crisis and the addition of 10 affordable houses will help address some of those issues. To ease pressure on the Grid, the project also comes with it’s own district heating system using the remaining Sitka Spruce on site as a fuel source, a wind turbine and solar panels.
The finished project will deliver a host of positive benefits including but not limited to:
- Employment
- Affordable Housing
- Circular Economy approach/local fuel
- Community garden
- Allotments
- Carbon capture in new tree planting
- Significant destination space for locals and visitors alike.
The project will link into Argyll College, Islay High School, Youth Initiative and employability. Partners and funders will be Scottish Government – Rural and Islands Housing Fund, Argyll and Bute Council and National Lottery. Community group usage will be open to all groups on the island and will link into national networks such as Community Woodlands Association, Scottish Islands Federation and Community Tree Nursery Network.
Complete our lifeline link road!
2025-06-02 • No comments • • Regeneration Capital Grant Fund
In 2021 and 2022, IKDT secured funding to construst 1.79KM of brand new road connecting the North and South of the island. This project has been in the pipeline for many decades and has connected up the two different communities and is allowing our island to thrive as one. Just after we have secured the funding for the 2nd stage of the project, the tar topping, war broke out in Ukraine. Apart from the obvious humanitarian crisis, this had an instant impact on the price of all the raw materials required for surfacing. It meant we had to scale stage 2 back and make do with tarring the new built section of the road with a single layer of tar and leave approx 500 metres of road in an unbound, farm track state. Our plan for stage 2 had been to deliver 2 layers of tar over the new road (1.79km) and the 500m of existing road when we could petition the council to adopt the road as it connects up the existing council road to several council tax paying households. As it stands, while the road is in use and is hugely beneficial to life on the island however the maintenance burden on IKDT is not ideal. The council will not consider adoption until the road is brought up to the standard we had planned for stage 2 so we are hoping to complete the job. Adoption is key to the long term future of the road and indeed to whole community as it will allow unfettered access to all including vital services, emergency vehicles and access to the lifeline ferry service. The surfacing could be delivered in one week but the effects would be felt for generations to come. We would hope to continue the excellent working relationship with A&B Roads department to help deliver the best value for money possible.
South Kintyre Growing Project
2025-05-29 • No comments • • Regeneration Capital Grant Fund
SKDT already operates the gateway garden (under licence from ACHA), as well as the putting green and herb garden (under licence from ABC) and the Robert Black Memorial Helipad (owner operator).
SKDT has well developed plans in place for these areas, which we would obviously like to see being well used by the community.
The creation of the Gateway Garden over the last 18 months has provided opportunities for food growing, education and intergenerational activity which are identified actions in the Campbeltown Community Action Plan (2022 – 2027). The Growing Project will also go some way towards developing local resilience and food security.
The initial redevelopment of the Gateway Garden, which is in a prominent location at the entrance to the town, has given impetus to other volunteers and potential gardeners to come forward.
Unfortunately, the limited size of the current garden area has restricted the number of growing plots available. The Growing Project would allow us to identify other suitable growing areas which we can develop in a gradual and progressive way, The, now ceased, Campbeltown Community Garden has donated their remaining plant and equipment to SKDT, now in storage, which will give us a head start in developing new growing spaces.
We also have a large selection of lawnmowers, gardening tools, hoses and other items which we can use for this project. However we will still need to acquire additional equipment and sundries (gloves, boots, compost, fertiliser etc) to allow us to proceed.
We will look to access additional funding to develop the project further via local funding through e.g. Common Good Fund, MACC and Campbeltown Community Windfarm Fund.
The main focus of this expansive project will be to attract, retain and train volunteers to get their hands dirty and get digging, weeding and planting.
As well as our own volunteers, there is another group of volunteers who have been looking after the bus terminal area. We will work alongside and support both of these groups. We will access additional training and advice from a network of community gardens throughout Scotland.
We would also continue and expand our work with the local schools on developing their own gardens and teaching kids the benefits of growing your own food. This would also allow for some important intergenerational activities which improve the lives of young and old.
We will also support and lobby for the provision of allotments for people to grow their own produce.
Dunoon Pier
2025-03-26 • No comments • • Regeneration Capital Grant Fund
Operating under the governance of the Dunoon Community Development Trust and in partnership with Argyll and Bute Council, the Save the Pier working group has been actively seeking funding and carrying out further research to progress the necessary technical studies needed to inform these types of developments.
The initial goal of the working group is to develop a robust, evidence-based feasibility study, providing a clear case for the pier’s redevelopment and its potential role within the future of the town’s wider marine infrastructure. Longer-term they hope to begin the process of the pier’s renovation.
The wider team —comprising volunteers with expertise in public sector infrastructure, finance, heritage preservation, project development and community engagement —has been engaging with stakeholders in the public and private sector, having discussions with potential funders, and laying the groundwork to ensure any future redevelopment is viable and sustainable.
Our Progress So Far
The project has involved extensive positive collaboration with Argyll and Bute Council, alongside wider stakeholder consultations, a public petition, and collaboration with advisors in major infrastructure, heritage conservation, and funding options.
Community Involvement
Community engagement will be essential to shaping the pier’s future. There has consistently been a lot of interest on social media and in the newspaper with large numbers of people getting behind the idea of Dunoon Pier being regenerated. It is clear that there is good community support for the idea and the working group welcomes the input of local residents, businesses, and local organisations as the project evolves.
At this stage, the focus is on gathering the necessary technical and financial evidence to determine what is achievable.
Next Steps
Funding is currently being secured to complete a feasibility study, which will provide a comprehensive assessment of the pier’s future potential. This study will form the foundation for securing funding to progress any future redevelopment. However, given the scale of the project, careful planning and a phased approach is required. We aim to complete this initial phase and be in a position to share the feasibility study by Summer 2025.
Looking Ahead
Public infrastructure projects of this scale take time, but the dedication of the team working with the support of the local authority and Dunoon Community Development Trust means that there is a good chance that this project will progress positively. The Dunoon Pier working group is committed to communicating on their progress and will provide regular updates via Dunoon Community Development Trust and partners as the project moves forward.
"On your Bike", Tayinloan Youth Club
2025-04-29 • No comments • • Regeneration Capital Grant Fund
1. First and foremost, we want to keep our children safe while they enjoy being outdoors. The A83 runs the entire length of West Kintyre and as all the villages are spurs from this extremely fast and dangerous road, there is just nowhere safe for children to ride their bikes. To address this, we wish to install a pump track at Tayinloan
2. We feel it is needed because the main A83 is getting busier, and is one of the most dangerous roads in Scotland. Children and adults of all ages are now taking up more and more physical exercise and cycling has become very popular indeed. We wish to offer a safe enclosed area where they can learn and ride in safety.
3. The project could bring many positive benefits. Pump track riding not only provides a physical workout, but also promotes good mental well-being. It’s not just about the physical challenge – although that’s definitely a big part of the appeal. Spending time outdoors, surrounded by nature, has a way of melting away stress and lifting spirits. Pump track riding can actually help sharpen the mind and improve cognitive function. It is a way to encourage youngsters to leave their screens for a while and enjoy outdoor activities and social interaction.
These are just some of the positive changes for those participating in the sport. However there are many others, such as helping with social isolation which has become a big problem in these post Covid times.
At the pump track, generations come together, no matter their age! From little ones with their parents or grandparents to teenagers and young adults, everyone can enjoy fun and friendship, making it a true community hub. The little ones learn how to ride and gain confidence, while the more experienced riders practice their skills. Parents can have a great time too, as they watch their children gain confidence and make friends
4. Once the planning has been approved (hopefully within 6 months of application) and the funding secured, the pump track can be installed in 6 weeks.
We will work with Velosolutions, who are world leaders in this technology.
We will also liaise with schools and youth clubs.
We will work with Argyll and Bute Councillors