1. What we want to achieve.

The Cairnbaan Community Trust, (SC052905) wants to refurbish the forestry buildings to provide a community gathering point and flexible workshop and event spaces. We want a community hub that can be used by the community for education such as crafts and Gaelic, health e.g. yoga and other activities, recreation and social gatherings, inside and outside and temporary office space for local entrepreneurs.

Our priority is the smaller of the two buildings which will provide space for community events and workshops, social meeting space, hot desks and a community kitchen. There is external space that can be developed to provide a community garden and outside event space.  It is hoped in the future the larger of the two buildings can be developed to provide space for larger workshops and events.

We have divided the work into phases and we are currently seeking funding for phases 1 and 2. 

Phase 0: This covers the procurement of the forestry buildings under a community asset transfer funded by the Scottish Land Fund and we have secured initial funding for essential repairs to both buildings to make them safe and weatherproof.  The work will start when we take ownership on the 01/08/2025.

Phase 1: Is the refurbishment of the smaller building.  This phase will change the internal layout of the building to create flexible spaces.  This entails new partitions, doors, lighting and upgrade to the heating.  Additional facilities, external and internal, will be needed for disabled and users with special needs.  We also aim to fit a community kitchen and social space for coffee mornings.   Finally we need to replace windows and install new furnishings and fittings.

Phase 2: Is the landscaping and provision of a community garden and outdoor space.   

Phase 3: Is the refurbishment and fitting out of the larger building.  In this phase we also plan to look at energy efficiency improvements, e.g. heat pumps and solar panels.

2. Why our project is needed

Currently there is no community centre to provide a focal point or resources for the community.   There is a risk of social isolation amongst our older population and there are no facilities for the young people in our village.  Community cohesion is being eroded.

We commissioned a feasibility report through Community Enterprise which highlighted the following points. Accessing facilities is difficult without a car, the minimal bus service is a school service with no evening or Sunday services.  There are no shops, medical or other services in the village.  Despite scoring highly in other domains the area falls into the 10% most deprived areas in Scotland in terms of access to services in relation to the Scottish indices of multiple deprivation. Feedback from local people highlighted that a primary need in the community is an indoor social area and meeting space.

3. The positive changes our project will bring

Our vision is to reduce isolation, improve community life and reflect the cultural, environment and historic heritage of the area. The current priorities for the CCT are.

  • Bringing the community together to enable opportunities for social interaction and growth.
  • Advancement of arts, heritage, culture and science.
  • The provision and organization of recreational facilities to improve the quality of life for the community.
  • Improving the environment including education about the environment, culture and history.
  • The relief of thos in need either because of age, ill health, disability or financial hardship.

The refurbishment of the buidings will provide a focal point for the community and the resources to bring the community together especially those that feel isolated. It will provide resources for all ages across the community and give everyone opportunities for development and a sense of purpose and indentity.

Through current engagement with the local community we have already identified skills and volunteers that can contribute to the refurbishment which will foster community involvement from the outset

4. How long will our project run

Phase 1 and 2 of the project will start on: 05/01/2026

The project will run for: 15 months

Our Business plan and the Feasibility report are available on request.  Unfortunately the file size was too big to attach.

No supports
Screenshot 2025-05-08 134517.jpg

From Small Seeds - Cornabus Community Forest Initiative

2025-05-08  •  No comments  •  Islay Development Initiative  •  Regeneration Capital Grant Fund

   

IDI has set aside an initial 25 acres of Cornabus Community Forest to deliver housing, a Community Orchard, Garden and allotments for the community. 

In 2021 we carried out extensive consultation on the proposed development site within the now community owned Cornabus Forest. Formerly a commercial Sitka Spruce plantation, the whole site will eventually be replanted with native broadleaf to replicate the Atlantic Rainforest once prevalent on Islay, delivering significant biodiversity benefits but also on the community wish list from the consultation was housing for young people, allotments, an orchard and forest trails and a garden areas. 

The project will endeavour to add social and environmental value to the site and also create a space for community members and groups to enjoy. In 2020 Islay lost it's well-known community garden at Islay House, due to the property being sold on the open market. This was a much loved and used community space. Although the site at Cornabus is not a walled garden, extensive research on other forest garden initiatives was carried out in 2022 - including visits to Royal Botanical Society managed forests and formal garden spaces, such as Benmore and Puck's Glen. The intention is to take some elements of the old community garden site and duplicate them and the new, with lots of additional features.

The project is highly ambitious, and the first stage of funding has been secured from Inspiring Scotland for development of the tree nursery site where we will grow the replacement trees.  Secondary funding has come from Carbon Neutral Islands, specifically to create some of the infrastructure and assist with a circular economy approach to fuel wood supply on the island at affordable rates. 

This is a lifetime legacy project that will create a destination for outdoor enjoyment but also offer a range of solutions to the socio-economic challenges that the island faces with a strong focus on becoming Carbon Neutral. Islay is in a housing crisis and the addition of 10 affordable houses will help address some of those issues. To ease pressure on the Grid, the project also comes with it’s own district heating system using the remaining Sitka Spruce on site as a fuel source, a wind turbine and solar panels.  

The finished project will deliver a host of positive benefits including but not limited to:

  • Employment
  • Affordable Housing
  • Circular Economy approach/local fuel
  • Community garden
  • Allotments
  • Carbon capture in new tree planting
  • Significant destination space for locals and visitors alike.

The project will link into Argyll College, Islay High School, Youth Initiative and employability. Partners and funders will be Scottish Government – Rural and Islands Housing Fund, Argyll and Bute Council and National Lottery. Community group usage will be open to all groups on the island and will link into national networks such as Community Woodlands Association, Scottish Islands Federation and Community Tree Nursery Network.

 

No supports
Oban Lorne Clubhouse Designs

Oban Lorne RFC's Community Sports & Events Hub (Phase 1-2)

2025-05-21  •  No comments  •  Oban Lorne RFC & Community Sports Hub  •  Regeneration Capital Grant Fund

1. What do you want to do?

We aim to develop the Oban Sports & Events Hub—a modern, inclusive facility featuring a multi-sport clubhouse, floodlit pitches, gym, running track, and event spaces. This hub will serve as a central venue for sports, cultural events, and community gatherings, enhancing opportunities for physical activity and social engagement in Oban and the surrounding areas.

2. Why is your project needed?

Oban's existing sports infrastructure is outdated and lacks accessibility, limiting opportunities for participation in sports and community events. The current facilities do not meet the needs of the growing population, particularly youth and individuals with disabilities. By providing modern, accessible facilities, the Oban Sports & Events Hub will address these gaps, promoting inclusivity and community well-being.

3. What positive changes will your project bring about?

The hub will:

  • Enhance Health and Well-being: Provide facilities that encourage physical activity across all age groups.

  • Promote Inclusivity: Ensure accessible design for individuals with disabilities.

  • Support Youth Development: Offer programs and spaces dedicated to youth engagement.

  • Boost Local Economy: Attract events and visitors, supporting local businesses.

  • Foster Community Cohesion: Serve as a gathering place for diverse community groups.

 

4. How long will your project run for?

The project is planned over multiple phases and is subject to funding and lease agreements. The project has been designed to be flexible but includes:

  • Phase 1 (2025–mid 2026): Construction of the clubhouse, installation of floodlights, and development of the main pitch.

  • Phase 2 (mid–late 2026): Addition of a running track and 4G area.

  • Phase 3–4 (2027): Redevelopment of the bottom pitch and support of potential construction of the skate park.

  • Phases 5–8 (2028–2032): Expansion to include additional facilities and infrastructure improvements.

 

Partnerships:

We plan to collaborate with:

  • Local Sports Clubs: Oban Lorne RFC, Oban Saints FC, Oban Camanachd, and others.

  • Educational Institutions: Local schools and youth organisations, including the school hostel. 

  • Community Groups: Oban Community Skate Park Committee and cultural organisations.

  • Local Businesses & Charities: Atlantis Leisure, Adventure Oban, Happy Wee Health Club.

  • Local Authorities: Argyll and Bute Council for planning and support.

  • National Event Organisers

These partnerships will ensure the hub meets the diverse needs of the community and operates sustainably.

No supports
The Atlantis Leisure Centre in Oban

Renewing the fabric of Atlantis Leisure for the next Generation

2025-06-02  •  No comments  •  Atlantis Leisure  •  Regeneration Capital Grant Fund

Atlantis Leisure is a vibrant, community-run health and wellbeing hub in the heart of Oban. For over 30 years, we’ve been a lifeline for locals of all ages - a place where toddlers learn to swim, teens train with sports clubs, adults improve their fitness and older residents stay active and connected. As a registered charity and social enterprise, every penny we earn is reinvested. Our huge range of facilities are designed to support active, healthy lives. We work with schools, NHS partners, and community groups to deliver inclusive, high-impact services. With over 150,000 visits a year and no other facility like it for 95 miles, Atlantis isn’t just a leisure centre - it’s the beating heart of our community.

This application comprises separate projects that are also listed on Aspiring Places indivdiually but we thought it made sense to group them together as a single proposal for the purposes of RCGF too:

1. What do you want to do? We propose a multi-strand capital regeneration programme at Atlantis Leisure — a vital, community-owned asset serving Oban and surrounding remote rural areas — to deliver large-scale, community-led change aligned with RCGF's aims that breathes new life into an over 50 year old facility. 

This project brings together three deliverable, community-prioritised infrastructure improvements:

  1. Installation of rooftop solar panels and battery storage: significanty reducing carbon emissions, lowering long-term operating costs and contributing to Net Zero targets. 160k
  2. Expansion of Atlantis’ gym: a two-storey extension to accommodate growing community demand, support inclusive programmes like Elevate & Stay Active, and provide flexible meeting and office space to host outreach services and community partners. 175k
  3. Creation of accessible changing facility: reconfiguring existing internal space, to provide a dignified, fully inclusive changing area to support disabled users 50k
  4. Restoration of end of life outdoor sports pitch: bringing an end-of-life, unusable asset back into service, enabling schools, clubs, and informal groups to use it year-round, relieving pressure from indoor space and boosting physical activity levels. 90k
  5. Restoration of Sports Hall Roof: rectifying end-of-life aspects of the roofing. 150,000k

2. Why is your project needed? Atlantis Leisure is a community-run registered charity and social enterprise that delivers year-round access to sport, physical activity, and wellbeing services. We are the only such facility within a 95-mile radius and serve over 150,000 users annually — yet key parts of our infrastructure are now limiting access, affordability, and impact.

  • The pitch is end-of-life and unusable, with back-up facilities constrained by a statutory noise order.
  • We've run out of room in our existing gym facility meaning vital communtiy programmes like Healthy Options are unable to operate properly
  • There is no suitable changing space for users with complex access needs, meaning many are excluded from participation.
  • Energy costs are surging, making it harder to deliver affordable access and sustain services for low-income families.

The project will regenerate these essential community assets, futureproof our building, reduce inequalities in access, and enable Atlantis to deliver sustainable social value for decades to come — directly supporting the RCGF’s priorities around deprivation, climate, inclusion, and place-based transformation.

3. What positive changes will your project bring about?

  • Inclusive Infrastructure: The accessible changing space addresses long-standing inequality, empowering disabled users to participate fully & independently.
  • Net-Zero Progress: Solar & battery systems will directly reduce carbon emissions, support national climate goals, & make Atlantis more financially sustainable.
  • Renewed Community Space: The front pitch transformation will reinstate valuable outdoor capacity, expanding options for schools, clubs, and families.
  • Address Capacity Issues: Expanding the gym answers a growing problem with existing capacity.
  • Child Poverty Impact: Reducing running costs helps us to maintain subsidised programmes, removing financial barriers to physical & social wellbeing.
  • Place-Based Renewal: This project aligns with the Place Principle and National Strategy for Economic Transformation by investing in a community-anchored asset with cross-cutting impact.

Together, these outcomes represent transformational, community-led regeneration that will enhance the resilience, health, and wellbeing of Oban.

4. How long will your project run for?

The project is fully deliverable within FY 2026–27.

  • Start: Early 2026
  • End: March 2027
  • Drawdown Ready: All spend will be committed or completed within the terms of the RCGF.
  • Delivery Approach: Projects will be managed by Atlantis Leisure’s Facilities Subgroup with oversight from the Board. 
  • Match Funding: Confirmed: Atlantis own contribution. Pending: we are actively pursuing applications and conversations with other funders including LES's CARES programme

No supports
Photograph of the Rockfield Garden

Creating a Community Growing Space in Oban Town Centre

2025-06-02  •  No comments  •  Oban Communities Trust  •  Regeneration Capital Grant Fund

This project meets RCGF criteria: address vacant / derelict land as well as supporting locally developed, place-based regeneration projects that involve local communities, helping to tackle inequalities and improving the economic, social and physical environment of deprived, disadvantaged and fragile remote communities across Scotland. It is community led, and will result in strong regeneration outcomes.

The Rockfield Garden is leased and run by Oban Communities Trust, a Community Benefit Society run by and for its members and the wider community. 

We are transforming a disused, previously cultivated food production area into a vibrant and inclusive community growing space, but need funding to realise our vision. This project is rooted in a growing community movement: over the past year, more than 1,100 volunteer hours have been contributed at The Rockfield Garden. The momentum is clear—and this garden will be a living, growing symbol of community action.

The space, located behind The Rockfield Centre, was previously used to grow fruit, vegetables, and flowers for the former McTavish's Kitchens, but has since lain derelict.

What will your project do? Over the last 12 months a 25+ band of volunteers have spend over 1000 hours on Phase 1, preparing the space for cultivation. We are now seeking funding for Phase 2, which will initiate food production and support both experienced and novice growers, fostering strong community involvement.

  • Installing fencing and handrails to ensure safety and accessibility
  • Building raised beds and flexible growing spaces for communal and individual use
  • Constructing a weatherproof meeting shelter and a secure tool shed.
  • Providing tools, gardening equipment, seeds, compost, and plants.
  • Developing a community composting system to promote circular growing practices.
  • Installing bee hives, chicken coops, and a community orchard
  • Offering a varied programme of community engagement and educational growing activities, including informal social gardening drop-ins, volunteer action days, and community education.

Why is your project needed? Oban currently has no community growing provision, and local residents lack accessible opportunities to grow, learn, and contribute. As a rural town we are also heavily reliant on imported food, reducing local food resilience and creating disproportionately high food mile loadings. This project will:

  • Provide the community with growing space, tools, and support to grow food locally.
  • Encourage healthier lifestyles and increased social connection through shared, hands-on activity
  • Respond to the pressing need for increased food resilience in the face of climate change and supply chain vulnerabilities.
  • Help diversify the town’s food sources, reducing reliance on imported produce and associated transport emissions.
  • Create a learning hub to build knowledge and practical skills in sustainable food growing, composting, and ecological gardening
  • Offer a mix of communal and some individually managed plots, providing flexibility to suit different needs and abilities.
  • Enhance community cohesion and empowerment through participation, ownership, and shared outcomes.
  • Contribute to the Rockfield Centre's mission to reduce its carbon footprint and provide wholesome, healthy, affordable community meals.

What positive changes will your project bring about? The Rockfield Garden will deliver wide-ranging benefits across environmental, social, and educational areas:

  • Environmental Impact: With an estimated growing area of 1,400m², there is potential to produce 2,000–3,000kg of fruit and vegetables annually. This local production could reduce food miles and cut an estimated 3–4 tonnes of CO₂ emissions per year.
  • Food Resilience: In light of climate change and global food supply threats, local food production is a vital adaptation strategy. Growing food locally in Oban will contribute to community-level food security and resilience.
  • Health and Wellbeing: Access to growing spaces and outdoor activities supports mental and physical wellbeing. Gardening fosters regular physical activity, better nutrition, and emotional connection to nature.
  • Learning and Empowerment: Hands-on education will equip participants with valuable skills in food production, sustainability, and ecological stewardship.
  • Community Cohesion: The project will bring together people of all ages and backgrounds, strengthening social bonds, reducing isolation, and building a sense of place and purpose.
  • Sustainability: By incorporating composting and circular practices, such as seed saving, the garden will serve as a practical example of sustainable community living. By transforming this underused land into a thriving garden, we’re not just growing food—we’re growing community, resilience, and shared futures.

How long will your project run for? This is a long-term project that is ticking along in Phase 1, but requires substantial funding to move to Phase 2. Once funded, we anticipate c. 1 year to do the required structural works. We anticipate the total works requiring c. 70k, including staff time, but would gladly accept smaller amounts of funding which would allow us to complete the project in a modular fashion.

No supports
20221027_111318 (1).jpg

Complete our lifeline link road!

2025-06-02  •  No comments  •  Isle of Kerrera Development Trust  •  Regeneration Capital Grant Fund

In 2021 and 2022, IKDT secured funding to construst 1.79KM of brand new road connecting the North and South of the island. This project has been in the pipeline for many decades and has connected up the two different communities and is allowing our island to thrive as one. Just after we have secured the funding for the 2nd stage of the project, the tar topping, war broke out in Ukraine. Apart from the obvious humanitarian crisis, this had an instant impact on the price of all the raw materials required for surfacing. It meant we had to scale stage 2 back and make do with tarring the new built section of the road with a single layer of tar and leave approx 500 metres of road in an unbound, farm track state. Our plan for stage 2 had been to deliver 2 layers of tar over the new road (1.79km) and the 500m of existing road when we could petition the council to adopt the road as it connects up the existing council road to several council tax paying households. As it stands, while the road is in use and is hugely beneficial to life on the island however the maintenance burden on IKDT is not ideal. The council will not consider adoption until the road is brought up to the standard we had planned for stage 2 so we are hoping to complete the job. Adoption is key to the long term future of the road and indeed to whole community as it will allow unfettered access to all including vital services, emergency vehicles and access to the lifeline ferry service. The surfacing could be delivered in one week but the effects would be felt for generations to come. We would hope to continue the excellent working relationship with A&B Roads department to help deliver the best value for money possible.

No supports
LOGO

Lorn and Oban Reuse Initiative - Renewals and Expansion Project

2025-05-30  •  1 comment  •  The GRAB Trust  •  Regeneration Capital Grant Fund

What we want to do - Lorn and Oban Reuse Initiative (LORI) is our long-standing furniture reuse project based in Oban, serving communities for over 15 years. The project, which aims to achieve a Zero Waste society, diverts furniture, household goods and electricals etc. into reuse and before [these] unwanted items enter the waste hierarchy. In the last 12 months, LORI has supported over 11500 customers including businesses, individuals and families. Those in poverty and personal crisis, those displaced by war in Ukraine and communities challenged by the ongoing cost of living crisis. “Such a fantastic way to reduce wasting perfectly good products. Furniture is top quality and the staff I met were friendly, welcoming and incredibly helpful.” CustomerThis is an exciting period for our charity, as we are planning a major expansion of our work to enable us to better support the growing number of people who come to us for help. Our plans are well advanced including planning consent and building warrant for the proposed improvements and renewals to increase available floor space to meet the growing demand for reuse goods. GRAB has set aside reserves to contribute to the cost of these improvements.Under this grant we propose to move forward rapidly with the project. Available match funding already secured will support project management and admin resources and back LORI during any disruption to trade while improvements take place. Under this grant, captal funds will be deployed to prepare groundworks and the foundations to accommodate new modular buildings, the purchase of new buildings to replace derelict and delapidated units and much-needed welfare facilities. And extensive refurbishment to an existing building.    Why the project is needed - In Argyll and Bute, landfill accounts for around half of the Council’s annual production of Carbon Dioxide equivalent emissions (CO2e). (Source: Argyll and Bute Council Decarbonisation Plan 2021). Positive changes will the project bring about - Planet – Tackling the climate emergency, LORI reduces landfill; 45% of greenhouse gases come from products we use and purchase. Saving valuable resources from landfill, LORI reduces the communities’ carbon footprint and cuts emissions.  In Oban and Lorn approx. 858 tonnes of Municipal Solid Waste is produced each year.  Currently just over 10% or 86 tonnes is diverted through reuse by The GRAB Trust.  People – supporting local people and creating jobs, LORI supports communities to utilise existing resources, LORI has steadily increased volumes diverted from landfill each year; diverting over 450 tonnes from landfill in the last 8 years. The initiative sustains 7 jobs and 12 regular volunteers.  Pounds – Strengthening the circular economy we offer low cost, high quality furniture and homewares to everyone as a sustainable, low cost alternative to buying new.  LORI supports the Circular Economy by keeping existing resources in use for longer and our not-for-profit community enterprise now recirculates over £120,000 in our communities annually. Reducing the tax burden, LORI decreases landfill tax, saving local taxpayers over £8,000 annually. Place – engaging and empowering communities LORI is a place where ideas flourish. We support community groups and partners in the third sector. We help businesses like cafes, hotels and Air B&B furnish their premises.  We help communities to share and to learn new skills; reusing and repairing is a creative way to try new things, gain useful skills, appreciate what we already have and find new uses to make the most of it.  GRAB is part of Circular Communities Scotland Share and Repair Network and LORI is a source for tools for makers and craftsmen - keeping traditions alive.Our renewals project at LORI will ensure communities are supported for years to come - increase available floorspace by 80%, introduce welfare facilities for staff and volunteers and extend product lines – the new provision of running water at the site will open up the possibility of testing white goods (washing machines & dishwashers) for example. With increased floorspace LORI will better serve the growing demand for reuse, further reduce landfill and offer increased support to the circular economy in Oban and Lorn.   

No supports

Portsonachan Hall Rennovation & Modernisation Project

2025-05-30  •  No comments  •  Portsonachan Hall  •  Regeneration Capital Grant Fund

We want to modernise and improve our village hall which has remained unchanged for almost 100 years so that it can remain at the heart of our unique loch-side community for another century.

We are a close-knit community, but geographically remote, stretching 18 linear miles down Loch Awe-side. Ensuring we have a Village Hall that is fit for purpose is essential to keep us together, especially through the long autumn and winter months. The Hall provides us with a way of keeping in touch, offering people company and activities when there are so few amenities within the proximity of our community. Our Hall is home to about 13 different community groups, each with approximately 10-20 members. The Hall also provides an important resource for meetings for the South Lochaweside Community Company and the Glenorchy and Innishail Community Council as two examples. Having this space is vital for ensuring we can maintain such activities which allow our community a voice within the democratic process. We also hold many social evenings, which bring together new members of the community looking to integrate as well as many of the established community who would not get to see each other without the Hall. Our most recent BBQ brought in 90 people and our Sunday lunch catered for 30 people, and many of whom said without having this event, they would have spent their weekend alone.

The closure of the local bar recently has left a void in the community with the hall now the only communal space where members of the community can come together.

Having a space that is safe, warm and usable is a lifeline for rural communities like ours, and has wide-reaching impacts, including on our community's health and wellbeing. Given the age of our existing hall we need to refurbish our Hall to ensure it can continue to serve our community and for it to become more environmentally-considerate.  

Full planning permission was granted for the rennovation project in May 2025.  We can now begin work on the creation of our project management plan which is likely to be divided into distinct phases.

We anticipate that this project will take a year to a year and half to complete, during which time we will partner with Glenorchy & Innishail Community Council, South Loch Awe Community Company, Dalmally Community Company and Orchy & Awe Community Trust.

 

No supports
IMG-20240604-WA0002.jpg

Nonhebel Park (Final Phase)- Community Regeneration in Action

2025-05-30  •  No comments  •  Mull And Iona Community Trust (MICT)  •  Regeneration Capital Grant Fund

The Project:  We want to develop the final piece of community owned land available at Nonhebel Light Industrial Park, Tobermory to build up to two additional business units.   The new units will be for rent to businesses which are on a waiting list for space at the site.  Project Background & Need:  In response to community identified need for small business premises, community led rengeration charity, Mull and Iona Community Trust developed and now manages 38 business units plus fenced compounds, supporting 24 local businesses and an estimated 61 jobs.  There is a waiting list for the units still, proving market failure and the need to develop the final piece of land on the site to further support local businesses and economic regeneration in North Mull.     Project Outcomes: Positive Changes:  New business units supporting a minimum 2 businesses and up to another 8 local jobs.  Improving access to services, tackling rural poverty and population decline by supporting business expansion, start-up and employment; improving family incomes and making the island a more vibrant and sustainable place to live and work.  Project Timescales: Subject to securing funding, work to start in late 2025 and complete in Spring 2026. Highland and Island Enterprise are a project partner with a funding offer in the region of £200k.

 

 

 

No supports
Aerial View Tarbert Harbour

Tarbert Harbour Watercraft Launch & Recovery Slipway and Community Activity Hub

2025-04-09  •  No comments  •  Tarbert (Loch Fyne) Harbour Authority  •  Regeneration Capital Grant Fund

  1. Tarbert Harbour Authority has a bold and strategic ambition to build a Launch and Recovery Sportscraft / Watersports Slipway together with a Community and Watersports Activity Hub.  Whilst the Activity Hub and Slipway are linked as a strategic development; for the purposes of funding, build and project managment, they are being treated as distinct projects with individual costs, individual project timescales and individual benefits and outcome profiles. Phase 1  will see the development of a Watercraft Launch & Recovery Slipway, Kayak Pontoon and Boat Laydown Area - £1.5M   Phase 2 will see the building of a Community Water Sports and Activity Hub - £1.4M.

  2. The Project utilises a vacant and semi-derelict harbourside development plot to address: A significant health and social gap in terms of water sports, gym and soft play areas and associated learning and development activities.   An identified need for orgnanised, safe, educational and affordable access to the above facilities together with a learning area, meeting and events space.  Community Facilities are vital for the well-being of rural villages and a community hub/gym combined with a water sports facility can be a game-changer for diverse groups of people.  The integration of these amenities not only promotes physical health but also fosters social interaction together with economic growth.

  3. The development of the Community Water Sports Slipway and Activity Hub will provide wide ranging benefits.  Adults and children in Tarbert and Loch Fyne's local communities will have accessible opportunites to improve their health, wellbeing, social confidence, learning and skill sets.  Local families will benefit from access to safe soft play and early years development stimulus.  Young people in education along Loch Fyne will have the opportunity to acquire new experiences, skills and qualifications that will support their social development and provide a platform for demonstrating their capabilities in diverse ways. Visitors to Tarbert and the surrounding area, whether for work or leisure purposes, will be able to relax and participate in safe gym exercise, supervised water-based activities, training and development in sailing and boating to established National Standards.  Additional employment opportunities will be directly and indirectly created by this development.  The development will be a major step forward in realising the next stage in the village's regeneration and development.  Regular exercise is known to reduce stress, anxiety and depression, leading to healthier, more product individuals.  A well equipped gym provides access to fitness resources, encouraging users to adopt a healthy lifestyle.  The gym will cater for a wide range of fitness levels and interests, from beginners to advanced.  The Activity Hub will also be used as a training/meeting place for sports clubs/organisations, community groups, school groups, RYA training, activity leaders, famiies and friends.  

  4. It is proposed, once all Phase 1 funding is in place, to commence the development of the Launch/Retrieval Watercraft slipway this financial year with a completion date of mid 2026,  Phase 2 will follow, when funding allows, and when the final funding matrix is clearer.

Partnerships: We plan to collaborate with:

  1. Argyll & Bute community Council to align with local interests.

  2. Schools and educational institutions to promote learning opportunities.

  3. Local businesses, including bike hire providers and tourism boards, to enhance visitor engagement.

 

No supports