Complete our lifeline link road!
2025-06-02 • No comments • • Regeneration Capital Grant Fund
In 2021 and 2022, IKDT secured funding to construst 1.79KM of brand new road connecting the North and South of the island. This project has been in the pipeline for many decades and has connected up the two different communities and is allowing our island to thrive as one. Just after we have secured the funding for the 2nd stage of the project, the tar topping, war broke out in Ukraine. Apart from the obvious humanitarian crisis, this had an instant impact on the price of all the raw materials required for surfacing. It meant we had to scale stage 2 back and make do with tarring the new built section of the road with a single layer of tar and leave approx 500 metres of road in an unbound, farm track state. Our plan for stage 2 had been to deliver 2 layers of tar over the new road (1.79km) and the 500m of existing road when we could petition the council to adopt the road as it connects up the existing council road to several council tax paying households. As it stands, while the road is in use and is hugely beneficial to life on the island however the maintenance burden on IKDT is not ideal. The council will not consider adoption until the road is brought up to the standard we had planned for stage 2 so we are hoping to complete the job. Adoption is key to the long term future of the road and indeed to whole community as it will allow unfettered access to all including vital services, emergency vehicles and access to the lifeline ferry service. The surfacing could be delivered in one week but the effects would be felt for generations to come. We would hope to continue the excellent working relationship with A&B Roads department to help deliver the best value for money possible.
Creating a Cairnbaan Community Hub. Refurbishment of the old forestry buildings
2025-05-30 • No comments • • Regeneration Capital Grant Fund
1. What we want to achieve.
The Cairnbaan Community Trust, (SC052905) wants to refurbish the forestry buildings to provide a community gathering point and flexible workshop and event spaces. We want a community hub that can be used by the community for education such as crafts and Gaelic, health e.g. yoga and other activities, recreation and social gatherings, inside and outside and temporary office space for local entrepreneurs.
Our priority is the smaller of the two buildings which will provide space for community events and workshops, social meeting space, hot desks and a community kitchen. There is external space that can be developed to provide a community garden and outside event space. It is hoped in the future the larger of the two buildings can be developed to provide space for larger workshops and events.
We have divided the work into phases and we are currently seeking funding for phases 1 and 2.
Phase 0: This covers the procurement of the forestry buildings under a community asset transfer funded by the Scottish Land Fund and we have secured initial funding for essential repairs to both buildings to make them safe and weatherproof. The work will start when we take ownership on the 01/08/2025.
Phase 1: Is the refurbishment of the smaller building. This phase will change the internal layout of the building to create flexible spaces. This entails new partitions, doors, lighting and upgrade to the heating. Additional facilities, external and internal, will be needed for disabled and users with special needs. We also aim to fit a community kitchen and social space for coffee mornings. Finally we need to replace windows and install new furnishings and fittings.
Phase 2: Is the landscaping and provision of a community garden and outdoor space.
Phase 3: Is the refurbishment and fitting out of the larger building. In this phase we also plan to look at energy efficiency improvements, e.g. heat pumps and solar panels.
2. Why our project is needed
Currently there is no community centre to provide a focal point or resources for the community. There is a risk of social isolation amongst our older population and there are no facilities for the young people in our village. Community cohesion is being eroded.
We commissioned a feasibility report through Community Enterprise which highlighted the following points. Accessing facilities is difficult without a car, the minimal bus service is a school service with no evening or Sunday services. There are no shops, medical or other services in the village. Despite scoring highly in other domains the area falls into the 10% most deprived areas in Scotland in terms of access to services in relation to the Scottish indices of multiple deprivation. Feedback from local people highlighted that a primary need in the community is an indoor social area and meeting space.
3. The positive changes our project will bring
Our vision is to reduce isolation, improve community life and reflect the cultural, environment and historic heritage of the area. The current priorities for the CCT are.
- Bringing the community together to enable opportunities for social interaction and growth.
- Advancement of arts, heritage, culture and science.
- The provision and organization of recreational facilities to improve the quality of life for the community.
- Improving the environment including education about the environment, culture and history.
- The relief of thos in need either because of age, ill health, disability or financial hardship.
The refurbishment of the buidings will provide a focal point for the community and the resources to bring the community together especially those that feel isolated. It will provide resources for all ages across the community and give everyone opportunities for development and a sense of purpose and indentity.
Through current engagement with the local community we have already identified skills and volunteers that can contribute to the refurbishment which will foster community involvement from the outset
4. How long will our project run
Phase 1 and 2 of the project will start on: 05/01/2026
The project will run for: 15 months
Our Business plan and the Feasibility report are available on request. Unfortunately the file size was too big to attach.
Lighting up the Skerryvore Lighthouse Shore Station - The Lighthouse Cottages
2025-05-30 • No comments • • Regeneration Capital Grant Fund
1 We need to repoint the external stonework and do work on the chimneys and roof of the 4 lighthouse cottages. No maintenance work has been done for many years and there has been major issues with damp and water damage in these 4 properties. There is a critical housing shortage on Tiree and in particular affordable housing. We have now 2 of the cottages on long term lease to locals and would like to make the other 2 habitable for long term lease. We would also like to use this opportunity to encourage young people on Tiree to consider construction and in particular stonemasonry as a possible career. The team we would use, have experience of running training programmes for school pupils to come and work on the site and learn some of the basic skills of maintainting heritage buildings. This added value to the project would bring a very useful experience to our local children who are disadvantaged at present from these type of careers activities. We would also offer to design a long term training programme for a local person so that we could have local skills to maintain the A listed heritage buildings on our site.
2 We funded work late last year on two of the chimneys by a stonemason specialising in these kind of listed buildings. He has advised that all the external walls, chimneys and roof require work done to preserve these wonderful buildings. The work he did was enough to sort the immediate issues of dampness coming from the chimneys. There is still some damp coming through the walls/windows. Also the other chimneys that we did not repair mean that two of the cottages are not fit for long term lease at the moment. Funding has been recieved by Argyll and Bute Council to allow us to the internal upgrading but we require major funding for all the external works so that we an offer 4 good quality upgraded affordable homes for locals. One of the issues has been lack of maintenance of all the A listed buildings on our site. There has been some repair work done but it has exaccerbated the problems due to lack of knowledge. These buildilng require specialist skills. If we can train up someone locally to do the basic ongoing maintenance through this project this would be of huge long term benefit to the Hynish Trust.
3 When we advertised the last cottage for lease we got 5 applicants. They were all local people wanting to come to live at Hynish. Our vision is to create a clachan type village at the Skerrryvore Shore Station in Hynish for people to live, play, learn and enjoy. The demand is there amongst the community for long term affordable housing and this is a relatively quick win to maintain the two leases we have and create another two. But more importantly to ensure the buildings are presrved for the long term future. So the refurbishment of the externals of these buildings would be transformational for the Hynish Trust. It would ensure that these buildings will be fit for purpose for the future. It also addresses the critical housing situation. Providing an opportunity for local children to experience somehting different as a possible career opportunity would be welcomed by the school and the community. If we can also get a local person trained up to be able to maintain all our buildings externally this would be a long term benefit to the community and create much needed local employment.
4 The project would start in March 26 and run to September 26.
Portsonachan Hall Rennovation & Modernisation Project
2025-05-30 • No comments • • Regeneration Capital Grant Fund
We want to modernise and improve our village hall which has remained unchanged for almost 100 years so that it can remain at the heart of our unique loch-side community for another century.
We are a close-knit community, but geographically remote, stretching 18 linear miles down Loch Awe-side. Ensuring we have a Village Hall that is fit for purpose is essential to keep us together, especially through the long autumn and winter months. The Hall provides us with a way of keeping in touch, offering people company and activities when there are so few amenities within the proximity of our community. Our Hall is home to about 13 different community groups, each with approximately 10-20 members. The Hall also provides an important resource for meetings for the South Lochaweside Community Company and the Glenorchy and Innishail Community Council as two examples. Having this space is vital for ensuring we can maintain such activities which allow our community a voice within the democratic process. We also hold many social evenings, which bring together new members of the community looking to integrate as well as many of the established community who would not get to see each other without the Hall. Our most recent BBQ brought in 90 people and our Sunday lunch catered for 30 people, and many of whom said without having this event, they would have spent their weekend alone.
The closure of the local bar recently has left a void in the community with the hall now the only communal space where members of the community can come together.
Having a space that is safe, warm and usable is a lifeline for rural communities like ours, and has wide-reaching impacts, including on our community's health and wellbeing. Given the age of our existing hall we need to refurbish our Hall to ensure it can continue to serve our community and for it to become more environmentally-considerate.
Full planning permission was granted for the rennovation project in May 2025. We can now begin work on the creation of our project management plan which is likely to be divided into distinct phases.
We anticipate that this project will take a year to a year and half to complete, during which time we will partner with Glenorchy & Innishail Community Council, South Loch Awe Community Company, Dalmally Community Company and Orchy & Awe Community Trust.
Isle of Mull Wet Weather Sports Hall
2025-06-01 • No comments • • Regeneration Capital Grant Fund
What do you want to do?
Build a wet weather and indoor sports hall next to the Island playing fields at Garmony, near Craignure.
A healthy lifestyle is essential for the well being of a community. A core pillar of attaining health is access to physical activity. Over the past 20 years there has been a dramatic weather change on our island. Gone are the frosty days and snow covered mountains. During winters it rains most days and is often stormy. As a direct result of this sports participation on Mull has fallen away at an alarming rate. The proposed project is to construct a desperately needed Wet Weather Sports Hall. The project has significant support from throughout Mull. This was reinforced by active participation by our Community Council who submitted our application for full planning permission. This facility will be available for all to use. The Mull Rugby Club will be in full consultation with Sportscotland on a fair and equitable way to manage the facility.
Why is your project needed?
There is no wet weather or indoor sports hall on Mull. As Mull is an island people cannot travel to facilities elsewhere without difficulty. They must be provided locally.
Apart from greatly improving life on Mull this project will be invaluable to existing community sports groups, create opportunities for new organisations and, hopefully, re-establish some we have lost. Many events are organised at the Garmony playing fields but with the increase in inclement weather these often have to be cancelled on the day of the event. For example our island sports day has now been abandoned after many disruptions due to weather. It cannot proceed on wet grass. This was sole destroying for all involved. A cancellation causes great disruption to island life due to difficulties of communication as children are travelling by a variety of methods from up to 40 miles away and in different directions. With the hall this event could move inside if it was raining. The hall would also give our indoor athletes a suitable premises and allow them to have well catered home events on Mull. At last Mull would have a full sized basketball court and could, for the first time, play home games and join leagues. The facility would mean evening training for all sports could always go ahead no-matter the weather. Multiple badminton courts would provide an exciting and competitive space. It will even accommodate a tennis court for our keen players. It is heart breaking to record that the once very active Isle of Mull Football Association is no longer in existence. There is still a strong football presence on Mull and this facility will provide an indoor pitch giving an gateway to football participation in all weathers. And finally our own club, the Isle of Mull Rugby Club has seen a drastic decrease in player numbers over recent years. Training is almost always in wet, cold windy weather. This is disheartening for the players and leads to more injuries as the fitness to participate is diminished.
What positive changes will your project bring about?
This project will enrich life on the Island of Mull.
For the active participants the wet weather hall will provide a comfortable environment. This results in higher skill levels and increasing participation. For voluntary officials it will enhance achievement and remove the demoralising effect of bad weather. For communities it will encourage supporting roles and family involvement across all sports and leisure activities. The project also aligns with many lifestyle priorities. Well-being is improved. A tailored space protected from a hostile environment encourages diversity and inclusion for all. Try running a fun day in horizontal rain and our use of words becomes well chosen as only the hardy participate. Performance is improved across all age groups and skill levels leading to enhanced personal satisfaction.
It is highly probable that a project of this nature will encourage local families to stay on Mull and remove barriers to decisions on whether to move to our island. It is therefore considered that the project will have a positive impact on the population of our island. The Mull Community Council was unanimous in its support of the project.
By situating this project at Garmony it becomes part of a prooven sports destination. The Isle of Mull Rugby Sevens takes place at Garmony and this event has attracted teams from as far away as America with four figure attendances each year. Members and players of visiting teams and organisations will find the experience of using the facility highly rewarding.
How long will your project run for?
This project is stage three of the long term development of sports facilities at Garmony on the Isle of Mull.
Out of a need for playing facilities the Isle of Mull Rugby Club decided to embark on a long term development of sports facilities for the island. There were none available on Mull. An island survey by Tobermory High School selected Garmony as it was in a central position on Mull and was situated between the two main ferry terminals of Craignure and Fishnish.
Stage 1 Building a two pitch sports field from scratch on waste ground. Successfully completed.
Stage 2 Building changing rooms and community club house with kitchen. Successfully completed.
Stage 3 Building a wet weather facility. This objective was always planned but has become a matter of urgency in recent years. We project a start date and completion in 2026
The existing Garmony facilities are available for all to use. They also receive no revenue support and are fully self-supporting financially. We anticipate the same for Stage 3.
Redevelopment of Tayvallich Community Hall
2025-05-28 • No comments • • Regeneration Capital Grant Fund
What we want to do -
Phase 1 involves replacing the hall disabled access and the provision of a generator to enhance community resilience.
Phase 2 re-configuring the toilet block and the provision of hot water in the ladies toilets.
Phase 3 - installing a decking, and two patio doors to enhance provision for events. Also creation of more storage.
Why our project is needed.
The hall is used by the local primary school for provision of sports facilities and other activities. The Parent Council arranges parties and other communal events - such as an annual car wash and wreath-making at Christmas. The hall provides many family events, shows, films and talks - to keep the local community informed and entertained. A seperate gym club runs on a wednesday. The multi-sport court provides for sporting activities such as hockey and tennis, and the playing field is used for football and field sports.
Many tourists use the hall's facilities especially for events such as "Gala day", and tourism is an important industry in Scotland. The hall was instrumental in the creation of Tayvallich Initiative which aims to provide low-cost housing in the village for essential workers and implements "rural burdens" which help ensure community survival longer-term. The annual Kayak Symposium run by local firm "Argyll Kayaks", brings dozens to the village for a weekend, centered around the hall, which benefits the whole community including the community shop and the Inn.
"Resilience Planning" is a recent aim of the Community Hall. A few months back there was a power outage for 4 days - many were caught out by it. Apart from losing heating and cooking, many have private water supplies (pumped) and so had no water either. The hall did its best as a "resilience hub" but had no electric itself - simply brewing hot drinks on a gas stove - it could not offer shelter/heating/lighting/hot food. Resilience planning involves a back-up generator to better serve the community in such future events.
The hall provides many services to the local community. Yoga on a monday and thursday; table tennis on a monday; bowls on a thursday; "Pickle ball" on a tuesday; "stretch and tone" on a tuesday; Fencing on a wednesday; Lunch Club every month - providing for the retired members of our community. The hall also hosts First Aid classes which benefit the local community and beyond.
The hall is also a popular venue for weddings (and funerals). There are regular Coffee Mornings in aid of a range of charities - Beatson cancer charity; the Lochgilphead Snowdrop Centre; and the Taynish run in aid of McMillan cancer care. The annual flower show is also a popular event. In addition, the hall hosts events such as Films and Talks - often being full to capacity. Friday and saturday evenings often see the hall host Bands and Ceilidhs which attract visitors from further afield. It encourages and supports local artists and musicians.
The project will bring about many positive changes.
It is essential that the hall can continue to act as a community hub. Phase 1 - the generator - will ensure it can run as a resilience hub too. Phase 1 also includes better disabled access which is essential. Provision of better toilet facilities is also essential (Phase 2), given the hall's popularity. Phase 3 will increase the capacity of the hall - even more community activities will be encouraged and supported.
The hall is a vital community resource and needs to be supported and protected. The success of the community hall helps kindle social cohesion - it is a vital part of village life.
The project will start in July 2025 and take 6 months to complete.
Save Tobermory Fisherman’s Pier
2025-06-02 • No comments • • Regeneration Capital Grant Fund
1 What do we want to do?
Tobermory Fisherman's Pier Association intends to renovate and improve Thomas Telford's hisoric pier for the use of fishermen and other commercial users. We would like to preserve the pier as a place that can be used and enjoyed by locals and visitors alike. We want to open the pier to other commercial users and provide a solution to the risk of flooding caused by increasingly higher tides. A structural engineers report has been commissioned and has provided a plan for remedial works.
2 Why is the project needed?
While the pier is a vital economic resource for the fishermen of North Mull, it is also an essential and integral part of Tobermory's built heritage. Without the pier the fishermen would need to look for alternative space to store and repair gear. They would have to use moorings or pontoons and they would have to use alternative means to land their catch. All of these alternatives are costly, inconvenient and not as safe as the platform provided by the pier.
We have the support of the community and are backed by Mull Community Council, Tobermory Harbour Association and Mull and Iona Community Trust.
3 What positive changes will our project bring about?
The proposed improvements to the pier will provide a fit for purpose structure that will enable the fishing community, and other commercial users, to have confidence in the long-term viability of their businesses and provide the oppurtunity to support new entrants to the sector. Securing the long-term future of the pier will enable it to remain at the heart of the community for centuries to come, bringing economic benefit to the town as a platform for the fishermen and also as part of what draws visitors to Tobermory. It will continue to be a much loved hub for community celebrations and a valued civic space for locals and visitors to enjoy.
4 How long will our project run for?
The project will start in March 2026 and run for seven months.
Please refer to the attached PDF file for our more comprehensive proposal.
Dunoon Pier
2025-03-26 • No comments • • Regeneration Capital Grant Fund
Operating under the governance of the Dunoon Community Development Trust and in partnership with Argyll and Bute Council, the Save the Pier working group has been actively seeking funding and carrying out further research to progress the necessary technical studies needed to inform these types of developments.
The initial goal of the working group is to develop a robust, evidence-based feasibility study, providing a clear case for the pier’s redevelopment and its potential role within the future of the town’s wider marine infrastructure. Longer-term they hope to begin the process of the pier’s renovation.
The wider team —comprising volunteers with expertise in public sector infrastructure, finance, heritage preservation, project development and community engagement —has been engaging with stakeholders in the public and private sector, having discussions with potential funders, and laying the groundwork to ensure any future redevelopment is viable and sustainable.
Our Progress So Far
The project has involved extensive positive collaboration with Argyll and Bute Council, alongside wider stakeholder consultations, a public petition, and collaboration with advisors in major infrastructure, heritage conservation, and funding options.
Community Involvement
Community engagement will be essential to shaping the pier’s future. There has consistently been a lot of interest on social media and in the newspaper with large numbers of people getting behind the idea of Dunoon Pier being regenerated. It is clear that there is good community support for the idea and the working group welcomes the input of local residents, businesses, and local organisations as the project evolves.
At this stage, the focus is on gathering the necessary technical and financial evidence to determine what is achievable.
Next Steps
Funding is currently being secured to complete a feasibility study, which will provide a comprehensive assessment of the pier’s future potential. This study will form the foundation for securing funding to progress any future redevelopment. However, given the scale of the project, careful planning and a phased approach is required. We aim to complete this initial phase and be in a position to share the feasibility study by Summer 2025.
Looking Ahead
Public infrastructure projects of this scale take time, but the dedication of the team working with the support of the local authority and Dunoon Community Development Trust means that there is a good chance that this project will progress positively. The Dunoon Pier working group is committed to communicating on their progress and will provide regular updates via Dunoon Community Development Trust and partners as the project moves forward.
Tighnabruaich Community Petrol Station - powering a fragile community
2025-05-31 • No comments • • Regeneration Capital Grant Fund
The Problem
Our petrol station is threatened with closure due to retirement of the owners, and the business case for a commercial purchase is very weak. We are likely to end up with no fuel within 24 miles (and more for the isolated parts of our district). If people are forced to travel out of the area for fuel, they will tend to do all their shopping on the same trip, affecting other local shops and businesses . Carbon emissions will increase as people are forced to travel at least 48 miles round trip for fuel, over single-track mountain roads. Even running garden tools will become problematic, and our local Life Boat and volunteer Fire Service will have problems with adequate supply.
The Solution
This type of scenario is a perfect fit for a community enterprise response: improving the resilience and sustainability of the local area; providing opportunities for business and employment; and helping our community plan ahead for the switch to electric vehicles. We need a community-owned petrol station to secure fuel supplies in the area in the medium-term, install charging points, create business units for rent, and refurbish the historic building as a community transport and resilience hub. Having run two community consultations in the past two years we know that people will continue to need fuel for the next 10 - 15 years, that there is demand for workshop spaces for small businesses and that the petrol station building (a former Victorian pier house) has a high heritage value for the local community.
Opportunities
Since consulting on the community purchase of the petrol station, we have a had two direct approaches from potential workshop tenants. One local community group has a waiting list of small businesses looking for premises, so the creation of new work units would have a positive impact on the local economy. With joint support from the Scottish Land Fund we would be able to employ a Project and Transition Manager, tasked with delivering improvements to the building, installation of charging points and other renewables measures, managing the workshop spaces and developing our plans for electric community transport. We see many benefits arising from this project as well as securing a vital service.
Current Stage of Planning
We are about to apply to the Scottish Land Fund for support in meeting the purchase price and employing a part-time member of staff. Other funds will come from applications to charitable trusts and the Scottish Government, a community share issue and our own resources. We have a clear idea of the costs of the building refurbishment and the replacment of the fuel pumps with card payment models. Support to install charging points will be our other target for the early stages after our community purchase and there are several possible sources of funding.
Longer Term Goals
The move away from fossil fuels is envrionmentally and socially necessary. Climate change is driving a rise in the number of destructive weather events - Storm Eowyn resulted in a five-day power cut for the district. Our scattered population has a very high percentage of older people and the lack of power and communication was very concerning for them. In bringing the petrol station to community ownership we are not blind to the impact of carbon emissions and their effect on community resilience and environmental sustainability.
Although it may seem paradoxical, our purchase of the petrol station will help in lowering carbon emissions by removing the need for unnecessary journeys of around 50 miles. It will protect local services by keeping a point of sale in the area. It will make the district more secure in providing a storage space for emergency resilience supplies (like camping stoves and satellite phones to be used in future storms). It will allow us to install charging points and solar panels. It will bring a restoration of the adjoining pier into consideration as a tourist and leisure resource for swimming and boating. It will give us a site to base the community transport project that was viewed so favourably in our 2023 community survey. All of these achievable goals mean that the community buy-out will be benefiting the area long after the need to sell fossil fuels is gone.
Sandbank Village Hall (SVH) – The Next 100 Years!
2025-06-02 • No comments • • Regeneration Capital Grant Fund
- What do you want to do? Describe the activities your project will carry out and list any partner organisations.
- SVH Management Committee is seeking funding to redevelop the village hall in a rural community where there are no other community facilities. The hall hosts a range of groups and services, such as yoga classes, family celebrations, presentations e.g. local wind farm, fundraising events and acts as a polling station during local and national elections.
- Why is your project needed? Summarise the evidence showing your community needs this project. Help!
Today, SVH remains a vital institution within the village, embodying a rich heritage and an unwavering commitment to community values. It stands as a reminder of the village's history, a venue for collective memory, and a beacon of fellowship. The hall continues to host a diverse range of activities, adapting to contemporary needs while preserving its historical essence.
- What positive changes will your project bring about? Describe the benefits for participants. Help!
The SVH project will help deliver community needs which evidence: -
- Clear and genuine need.
- Relevant and appropriate consultation.
- The ability to keep the site in good order and well maintained once the project is complete.
- Reasonable costs which offer good value.
- The ability to deliver the project on time and on budget.
- The project’s outcomes will benefit the natural, social or built environment and make a positive impact on local communities.
- How long will your project run for? Provide the project duration and estimated start date.
From 1st April 2025 to 31 March 2026