2025-06-02  •  No comments  •  Tobermory Fishermans Pier Association  •  Regeneration Capital Grant Fund

1 What do we want to do?

Tobermory Fisherman's Pier Association intends to renovate and improve Thomas Telford's hisoric pier for the use of fishermen and other commercial users.  We would like to preserve the pier as a place that can be used and enjoyed by locals and visitors alike.  We want to open the pier to other commercial users and provide a solution to the risk of flooding caused by increasingly higher tides.  A structural engineers report has been commissioned and has provided a plan for remedial works.

2 Why is the project needed?

While the pier is a vital economic resource for the fishermen of North Mull, it is also an essential and integral part of Tobermory's built heritage.  Without the pier the fishermen would need to look for alternative space to store and repair gear.  They would have to use moorings or pontoons and they would have to use alternative means to land their catch.  All of these alternatives are costly, inconvenient and not as safe as the platform provided by the pier.

We have the support of the community and are backed by Mull Community Council, Tobermory Harbour Association and Mull and Iona Community Trust.

3  What positive changes will our project bring about?

The proposed improvements to the pier will provide a fit for purpose structure that will enable the fishing community, and other commercial users, to have confidence in the long-term viability of their businesses and provide the oppurtunity to support new entrants to the sector.  Securing the long-term future of the pier will enable it to remain at the heart of the community for centuries to come, bringing economic benefit to the town as a platform for the fishermen and also as part of what draws visitors to Tobermory.  It will continue to be a much loved hub for community celebrations and a valued civic space for locals and visitors to enjoy.

4  How long will our project run for?

The project will start in March 2026 and run for seven months.

Please refer to the attached PDF file for our more comprehensive proposal.

No supports
Tiree Rural Centre - the site for a new community-owned vet practice

Tiree & Coll Community Vet Practice Project

2025-05-30  •  No comments  •  Tiree Rural Development Ltd  •  Regeneration Capital Grant Fund

What do we want to do?

This project seeks to transform an existing community space at the Tiree Rural Centre – previously used as a café – into a community-owned vet practice serving the islands of Coll and Tiree. The Rural Centre hosts the island’s cattle and sheep market along with an exhibition showing all aspects of crofting and wildlife on Tiree. It plays a leading role in preserving Tiree’s rich crofting heritage and, together with its central location on the island, is well-placed to host a community vet practice. This represents a significant investment and regeneration project for both Tiree and Coll, and would contribute positively to local economies, which revolve around crofting.

This project is led by a consortium of island stakeholders which includes Tiree Rural Development (which manage the Rural Centre), Tiree Community Development Trust, various crofters and community representatives, and the current vet. This steering group provides strategic oversight and represents a community-led approach focused on safeguarding a key island service and a shared belief that something must be done before it is too late.

To that end, the Tiree Community Development Trust commissioned a feasibility study to investigate renovating the available, currently vacant space at the Rural Centre into a vet practice. With a full design and accurate costs now in place, the consortium are now in a position to commence a build phase of the project, and are actively seeking funding to make this important project a reality.

Why is our project needed?

A vet is absolutely critical to both Tiree and Coll. Without an island vet, crofting largely becomes untenable, as crofters need access to veterinary services to keep animals and ensure their welfare. Crucially, Tiree’s culture, history, economy, and its unique machair landscape are all strongly linked to crofting. In addition to running their crofts, crofters often hold multiple jobs and community roles, and are essential to island life. 

As crofting is the island’s primary industry, the loss of a vet would have dire consequences for the local economy. This would likely lead to emigration and a decline in the numbers of families living on the island. Even a few families leaving would have a significant impact on services, and could spark the further closure of lifeline services such as the school, GP surgery, and local businesses – a gradual process often seen in other small Scottish islands once the population falls below a critical point. Once these key services are lost, we know from experience and research that they rarely return. This is due to the high cost of running services on islands, the challenges of setting up, and the dwindling economic returns and economies of scale. Remote islands are places where market failure is the norm, not the exception. The group recognises that the vet practice is one such service that the island cannot afford to lose. 

Moreover, many residents keep small animals and pets; the operational and cost implications of relying on a mainland vet service for Tiree and Coll residents are significant, in some instances prohibitive. The vet also plays a central role in protecting the island’s unique wildlife and marine life, regularly attending call-outs to help stranded dolphins and seals, for example.

With our current vet looking to retire in the near future, we are keen to minimise barriers that an incoming vet faces. In the past, it has been difficult to recruit and retain vet capacity, and recent shortages in the sector, combined with a low financial return of investing in an island-based vet practice, have made this challenge more acute. Additionally, the current vet operates out of a small and temporary space which is unlikely to meet future RCVS standards and does not fully meet the dynamic needs of an island vet. A high-quality, affordable, and long-term practice ensures that the prospect of moving to Tiree to take over the practice becomes much more attractive and financially viable.

What positive changes will our project bring about?

This project provides key benefits to crofters and the wider community on both Tiree and Coll:

  • A bespoke, compliant, and modern vet practice will make it easier to attract an incoming vet to the island, and retain them once they have arrived.
  • It improves the standard of care and contributes positively to animal welfare, as well as providing a better space for a vet to operate out of.
  • Securing an appropriate practice space for Tiree and Coll safeguards the entire crofting sector, the island’s primary industry.
  • Security of tenure for the vet, as well as a stable rental income for a community group dedicated to improving conditions for crofters and wildlife on Tiree.
  • Making better use of existing assets, and optimising design to factor in environmental improvements.
  • Tiree and Coll pet owners are guaranteed access to veterinary care without having to rely on mainland services, which can be difficult and expensive to access – especially during emergencies.
  • The project contributes to the wider regeneration of Tiree’s existing community-owned assets, and will play a key role in Tiree Rural Centre’s future.
  • A lifeline island service is maintained, contributing to the overall viability of Tiree’s small, unique, and thriving community.

How long will our project run for?

The project will start on: 01/03/2026

The project will run for : 12 months

No supports
Dunoon Skatepark.jpg

Dunoon Skatepark Redevelopment

2025-05-30  •  No comments  •  Dunoon Community Development Trust  •  Regeneration Capital Grant Fund

Dunoon Community Development Trust wants to work with children and young people to design and develop a new skatepark facility in Dunoon that will better meet their needs and encourage increased outdoor activity and community connection.

Dunoon Skatepark is sited in Ardenslate, one of two areas in the town within the highest decile of the Scottish Index of Multiple Deprivation.  The original skatepark was campaigned for and developed by local young almost 20 years ago and its creation was a major achievement for those involved. It was well used for several years, however, the original steel structures and rough surfacing are no longer fit for purpose and levels of use have seriously declined. Some elements of the facility present a significant hazard, especially for learners, so there are very few younger users or family involvement. Local young people and young adults have been actively involved in campaigning for improvements to the skatepark gathering hundreds of signatures on their petition on Change.org  Recent engagement with school pupils has confirmed their interest in improved facilities for skating and wheeling on the site.

By developing this facility to better meet the needs of skateboarders, in-line skaters and BMX bikers of all abilities, we will be able to support and encourage children, young people and young adults to build their skills and enjoy peer-to-peer learning experiences. More time spent outdoors engaging in interesting physical activities will help to address the health and wellbeing challenges faced by young people and young adults and help to reduce social isolation.

This project will run for between 12 and 18 months including consultation, design, planning, permissions and construction.

The skatepark is situated on land owned by Argyll & Bute Council so it will be vital to work in partnership with them. Consultation will also involve local schools, Dunoon Community Council and Live Argyll youth work team.

No supports
Old forestry buildings

Creating a Cairnbaan Community Hub. Refurbishment of the old forestry buildings

2025-05-30  •  No comments  •  Cairnbaan Community Trust  •  Regeneration Capital Grant Fund

1. What we want to achieve.

The Cairnbaan Community Trust, (SC052905) wants to refurbish the forestry buildings to provide a community gathering point and flexible workshop and event spaces. We want a community hub that can be used by the community for education such as crafts and Gaelic, health e.g. yoga and other activities, recreation and social gatherings, inside and outside and temporary office space for local entrepreneurs.

Our priority is the smaller of the two buildings which will provide space for community events and workshops, social meeting space, hot desks and a community kitchen. There is external space that can be developed to provide a community garden and outside event space.  It is hoped in the future the larger of the two buildings can be developed to provide space for larger workshops and events.

We have divided the work into phases and we are currently seeking funding for phases 1 and 2. 

Phase 0: This covers the procurement of the forestry buildings under a community asset transfer funded by the Scottish Land Fund and we have secured initial funding for essential repairs to both buildings to make them safe and weatherproof.  The work will start when we take ownership on the 01/08/2025.

Phase 1: Is the refurbishment of the smaller building.  This phase will change the internal layout of the building to create flexible spaces.  This entails new partitions, doors, lighting and upgrade to the heating.  Additional facilities, external and internal, will be needed for disabled and users with special needs.  We also aim to fit a community kitchen and social space for coffee mornings.   Finally we need to replace windows and install new furnishings and fittings.

Phase 2: Is the landscaping and provision of a community garden and outdoor space.   

Phase 3: Is the refurbishment and fitting out of the larger building.  In this phase we also plan to look at energy efficiency improvements, e.g. heat pumps and solar panels.

2. Why our project is needed

Currently there is no community centre to provide a focal point or resources for the community.   There is a risk of social isolation amongst our older population and there are no facilities for the young people in our village.  Community cohesion is being eroded.

We commissioned a feasibility report through Community Enterprise which highlighted the following points. Accessing facilities is difficult without a car, the minimal bus service is a school service with no evening or Sunday services.  There are no shops, medical or other services in the village.  Despite scoring highly in other domains the area falls into the 10% most deprived areas in Scotland in terms of access to services in relation to the Scottish indices of multiple deprivation. Feedback from local people highlighted that a primary need in the community is an indoor social area and meeting space.

3. The positive changes our project will bring

Our vision is to reduce isolation, improve community life and reflect the cultural, environment and historic heritage of the area. The current priorities for the CCT are.

  • Bringing the community together to enable opportunities for social interaction and growth.
  • Advancement of arts, heritage, culture and science.
  • The provision and organization of recreational facilities to improve the quality of life for the community.
  • Improving the environment including education about the environment, culture and history.
  • The relief of thos in need either because of age, ill health, disability or financial hardship.

The refurbishment of the buidings will provide a focal point for the community and the resources to bring the community together especially those that feel isolated. It will provide resources for all ages across the community and give everyone opportunities for development and a sense of purpose and indentity.

Through current engagement with the local community we have already identified skills and volunteers that can contribute to the refurbishment which will foster community involvement from the outset

4. How long will our project run

Phase 1 and 2 of the project will start on: 05/01/2026

The project will run for: 15 months

Our Business plan and the Feasibility report are available on request.  Unfortunately the file size was too big to attach.

No supports
Community Village Hall/Community Hub

Clachan Village Hall/Community Hub Phoenix project

2025-06-02  •  No comments  •  Clachan Village Hall (Kintyre) SCIO SC050324  •  Regeneration Capital Grant Fund

Clachan lost its much loved and well used village hall due to terminal decline as an asbestos concrete roofed building with corroded portal flames and was demolished in 2022. The iconic historic B Lited Kilcalmonell church was purchased with a Scottish Land Fund grant to serve as a replacement village hall to arise like the proverbial phoenix from the ashes of the old hall. The hub will allow resumption of the dormant user group activities and will provide a recreational, educational venue for the comunity as well as a resource for private hire. It will also serve as an emergency centre to provide safe haven and meal provision at times of emergency such as has occured on many occasions over the past 10 years particualrly in relation to power cuts, village floods, a freak snow storm, and gales, some of which also resulted in blocking the A83 artery to Campbeltown. We are in the process of renovating the exisitng church building to provide the main comunal space and this work shold be completed by the end of the year.  This is being funded in part by are own fund raising initiatives and by local wind farm trust grants. We then need grant funding for the extension to provides the addtional space for : a catering/kitchen area, a small meeting room, additional storage and toilet provision with disabled access for larger capacity events and activities. It is is this extension project (phase 2) that we are seeking funding from the RCGF scheme as well as other agencies such as the Windfarm Trusts, and other grant funders. We are looking for this construction work to be done 2026-2027.

No supports
20221027_111318 (1).jpg

Complete our lifeline link road!

2025-06-02  •  No comments  •  Isle of Kerrera Development Trust  •  Regeneration Capital Grant Fund

In 2021 and 2022, IKDT secured funding to construst 1.79KM of brand new road connecting the North and South of the island. This project has been in the pipeline for many decades and has connected up the two different communities and is allowing our island to thrive as one. Just after we have secured the funding for the 2nd stage of the project, the tar topping, war broke out in Ukraine. Apart from the obvious humanitarian crisis, this had an instant impact on the price of all the raw materials required for surfacing. It meant we had to scale stage 2 back and make do with tarring the new built section of the road with a single layer of tar and leave approx 500 metres of road in an unbound, farm track state. Our plan for stage 2 had been to deliver 2 layers of tar over the new road (1.79km) and the 500m of existing road when we could petition the council to adopt the road as it connects up the existing council road to several council tax paying households. As it stands, while the road is in use and is hugely beneficial to life on the island however the maintenance burden on IKDT is not ideal. The council will not consider adoption until the road is brought up to the standard we had planned for stage 2 so we are hoping to complete the job. Adoption is key to the long term future of the road and indeed to whole community as it will allow unfettered access to all including vital services, emergency vehicles and access to the lifeline ferry service. The surfacing could be delivered in one week but the effects would be felt for generations to come. We would hope to continue the excellent working relationship with A&B Roads department to help deliver the best value for money possible.

No supports
Aerial View Tarbert Harbour

Tarbert Harbour Watercraft Launch & Recovery Slipway and Community Activity Hub

2025-04-09  •  No comments  •  Tarbert (Loch Fyne) Harbour Authority  •  Regeneration Capital Grant Fund

  1. Tarbert Harbour Authority has a bold and strategic ambition to build a Launch and Recovery Sportscraft / Watersports Slipway together with a Community and Watersports Activity Hub.  Whilst the Activity Hub and Slipway are linked as a strategic development; for the purposes of funding, build and project managment, they are being treated as distinct projects with individual costs, individual project timescales and individual benefits and outcome profiles. Phase 1  will see the development of a Watercraft Launch & Recovery Slipway, Kayak Pontoon and Boat Laydown Area - £1.5M   Phase 2 will see the building of a Community Water Sports and Activity Hub - £1.4M.

  2. The Project utilises a vacant and semi-derelict harbourside development plot to address: A significant health and social gap in terms of water sports, gym and soft play areas and associated learning and development activities.   An identified need for orgnanised, safe, educational and affordable access to the above facilities together with a learning area, meeting and events space.  Community Facilities are vital for the well-being of rural villages and a community hub/gym combined with a water sports facility can be a game-changer for diverse groups of people.  The integration of these amenities not only promotes physical health but also fosters social interaction together with economic growth.

  3. The development of the Community Water Sports Slipway and Activity Hub will provide wide ranging benefits.  Adults and children in Tarbert and Loch Fyne's local communities will have accessible opportunites to improve their health, wellbeing, social confidence, learning and skill sets.  Local families will benefit from access to safe soft play and early years development stimulus.  Young people in education along Loch Fyne will have the opportunity to acquire new experiences, skills and qualifications that will support their social development and provide a platform for demonstrating their capabilities in diverse ways. Visitors to Tarbert and the surrounding area, whether for work or leisure purposes, will be able to relax and participate in safe gym exercise, supervised water-based activities, training and development in sailing and boating to established National Standards.  Additional employment opportunities will be directly and indirectly created by this development.  The development will be a major step forward in realising the next stage in the village's regeneration and development.  Regular exercise is known to reduce stress, anxiety and depression, leading to healthier, more product individuals.  A well equipped gym provides access to fitness resources, encouraging users to adopt a healthy lifestyle.  The gym will cater for a wide range of fitness levels and interests, from beginners to advanced.  The Activity Hub will also be used as a training/meeting place for sports clubs/organisations, community groups, school groups, RYA training, activity leaders, famiies and friends.  

  4. It is proposed, once all Phase 1 funding is in place, to commence the development of the Launch/Retrieval Watercraft slipway this financial year with a completion date of mid 2026,  Phase 2 will follow, when funding allows, and when the final funding matrix is clearer.

Partnerships: We plan to collaborate with:

  1. Argyll & Bute community Council to align with local interests.

  2. Schools and educational institutions to promote learning opportunities.

  3. Local businesses, including bike hire providers and tourism boards, to enhance visitor engagement.

 

No supports

Portsonachan Hall Rennovation & Modernisation Project

2025-05-30  •  No comments  •  Portsonachan Hall  •  Regeneration Capital Grant Fund

We want to modernise and improve our village hall which has remained unchanged for almost 100 years so that it can remain at the heart of our unique loch-side community for another century.

We are a close-knit community, but geographically remote, stretching 18 linear miles down Loch Awe-side. Ensuring we have a Village Hall that is fit for purpose is essential to keep us together, especially through the long autumn and winter months. The Hall provides us with a way of keeping in touch, offering people company and activities when there are so few amenities within the proximity of our community. Our Hall is home to about 13 different community groups, each with approximately 10-20 members. The Hall also provides an important resource for meetings for the South Lochaweside Community Company and the Glenorchy and Innishail Community Council as two examples. Having this space is vital for ensuring we can maintain such activities which allow our community a voice within the democratic process. We also hold many social evenings, which bring together new members of the community looking to integrate as well as many of the established community who would not get to see each other without the Hall. Our most recent BBQ brought in 90 people and our Sunday lunch catered for 30 people, and many of whom said without having this event, they would have spent their weekend alone.

The closure of the local bar recently has left a void in the community with the hall now the only communal space where members of the community can come together.

Having a space that is safe, warm and usable is a lifeline for rural communities like ours, and has wide-reaching impacts, including on our community's health and wellbeing. Given the age of our existing hall we need to refurbish our Hall to ensure it can continue to serve our community and for it to become more environmentally-considerate.  

Full planning permission was granted for the rennovation project in May 2025.  We can now begin work on the creation of our project management plan which is likely to be divided into distinct phases.

We anticipate that this project will take a year to a year and half to complete, during which time we will partner with Glenorchy & Innishail Community Council, South Loch Awe Community Company, Dalmally Community Company and Orchy & Awe Community Trust.

 

No supports
The Atlantis Leisure Centre in Oban

Renewing the fabric of Atlantis Leisure for the next Generation

2025-06-02  •  No comments  •  Atlantis Leisure  •  Regeneration Capital Grant Fund

Atlantis Leisure is a vibrant, community-run health and wellbeing hub in the heart of Oban. For over 30 years, we’ve been a lifeline for locals of all ages - a place where toddlers learn to swim, teens train with sports clubs, adults improve their fitness and older residents stay active and connected. As a registered charity and social enterprise, every penny we earn is reinvested. Our huge range of facilities are designed to support active, healthy lives. We work with schools, NHS partners, and community groups to deliver inclusive, high-impact services. With over 150,000 visits a year and no other facility like it for 95 miles, Atlantis isn’t just a leisure centre - it’s the beating heart of our community.

This application comprises separate projects that are also listed on Aspiring Places indivdiually but we thought it made sense to group them together as a single proposal for the purposes of RCGF too:

1. What do you want to do? We propose a multi-strand capital regeneration programme at Atlantis Leisure — a vital, community-owned asset serving Oban and surrounding remote rural areas — to deliver large-scale, community-led change aligned with RCGF's aims that breathes new life into an over 50 year old facility. 

This project brings together three deliverable, community-prioritised infrastructure improvements:

  1. Installation of rooftop solar panels and battery storage: significanty reducing carbon emissions, lowering long-term operating costs and contributing to Net Zero targets. 160k
  2. Expansion of Atlantis’ gym: a two-storey extension to accommodate growing community demand, support inclusive programmes like Elevate & Stay Active, and provide flexible meeting and office space to host outreach services and community partners. 175k
  3. Creation of accessible changing facility: reconfiguring existing internal space, to provide a dignified, fully inclusive changing area to support disabled users 50k
  4. Restoration of end of life outdoor sports pitch: bringing an end-of-life, unusable asset back into service, enabling schools, clubs, and informal groups to use it year-round, relieving pressure from indoor space and boosting physical activity levels. 90k
  5. Restoration of Sports Hall Roof: rectifying end-of-life aspects of the roofing. 150,000k

2. Why is your project needed? Atlantis Leisure is a community-run registered charity and social enterprise that delivers year-round access to sport, physical activity, and wellbeing services. We are the only such facility within a 95-mile radius and serve over 150,000 users annually — yet key parts of our infrastructure are now limiting access, affordability, and impact.

  • The pitch is end-of-life and unusable, with back-up facilities constrained by a statutory noise order.
  • We've run out of room in our existing gym facility meaning vital communtiy programmes like Healthy Options are unable to operate properly
  • There is no suitable changing space for users with complex access needs, meaning many are excluded from participation.
  • Energy costs are surging, making it harder to deliver affordable access and sustain services for low-income families.

The project will regenerate these essential community assets, futureproof our building, reduce inequalities in access, and enable Atlantis to deliver sustainable social value for decades to come — directly supporting the RCGF’s priorities around deprivation, climate, inclusion, and place-based transformation.

3. What positive changes will your project bring about?

  • Inclusive Infrastructure: The accessible changing space addresses long-standing inequality, empowering disabled users to participate fully & independently.
  • Net-Zero Progress: Solar & battery systems will directly reduce carbon emissions, support national climate goals, & make Atlantis more financially sustainable.
  • Renewed Community Space: The front pitch transformation will reinstate valuable outdoor capacity, expanding options for schools, clubs, and families.
  • Address Capacity Issues: Expanding the gym answers a growing problem with existing capacity.
  • Child Poverty Impact: Reducing running costs helps us to maintain subsidised programmes, removing financial barriers to physical & social wellbeing.
  • Place-Based Renewal: This project aligns with the Place Principle and National Strategy for Economic Transformation by investing in a community-anchored asset with cross-cutting impact.

Together, these outcomes represent transformational, community-led regeneration that will enhance the resilience, health, and wellbeing of Oban.

4. How long will your project run for?

The project is fully deliverable within FY 2026–27.

  • Start: Early 2026
  • End: March 2027
  • Drawdown Ready: All spend will be committed or completed within the terms of the RCGF.
  • Delivery Approach: Projects will be managed by Atlantis Leisure’s Facilities Subgroup with oversight from the Board. 
  • Match Funding: Confirmed: Atlantis own contribution. Pending: we are actively pursuing applications and conversations with other funders including LES's CARES programme

No supports
DCDT Dunoon Pier Working Group.png

Dunoon Pier

2025-03-26  •  No comments  •  Dunoon Community Development Trust  •  Regeneration Capital Grant Fund

Operating under the governance of the Dunoon Community Development Trust and in partnership with Argyll and Bute Council, the Save the Pier working group has been actively seeking funding and carrying out further research to progress the necessary technical studies needed to inform these types of developments.

The initial goal of the working group is to develop a robust, evidence-based feasibility study, providing a clear case for the pier’s redevelopment and its potential role within the future of the town’s wider marine infrastructure. Longer-term they hope to begin the process of the pier’s renovation.

The wider team —comprising volunteers with expertise in public sector infrastructure, finance, heritage preservation, project development and community engagement —has been engaging with stakeholders in the public and private sector, having discussions with potential funders, and laying the groundwork to ensure any future redevelopment is viable and sustainable.

Our Progress So Far

The project has involved extensive positive collaboration with Argyll and Bute Council, alongside wider stakeholder consultations, a public petition, and collaboration with advisors in major infrastructure, heritage conservation, and funding options.

Community Involvement

Community engagement will be essential to shaping the pier’s future. There has consistently been a lot of interest on social media and in the newspaper with large numbers of people getting behind the idea of Dunoon Pier being regenerated. It is clear that there is good community support for the idea and the working group welcomes the input of local residents, businesses, and local organisations as the project evolves.

At this stage, the focus is on gathering the necessary technical and financial evidence to determine what is achievable.

Next Steps

Funding is currently being secured to complete a feasibility study, which will provide a comprehensive assessment of the pier’s future potential. This study will form the foundation for securing funding to progress any future redevelopment. However, given the scale of the project, careful planning and a phased approach is required. We aim to complete this initial phase and be in a position to share the feasibility study by Summer 2025.

Looking Ahead

Public infrastructure projects of this scale take time, but the dedication of the team working with the support of the local authority and Dunoon Community Development Trust means that there is a good chance that this project will progress positively. The Dunoon Pier working group is committed to communicating on their progress and will provide regular updates via Dunoon Community Development Trust and partners as the project moves forward.