Project Proposals: Regeneration Capital Grant Fund

Total budget £0

Photograph of the Rockfield Garden

Creating a Community Growing Space in Oban Town Centre

2025-06-02  •  No comments  •  Oban Communities Trust  •  Regeneration Capital Grant Fund

This project meets RCGF criteria: address vacant / derelict land as well as supporting locally developed, place-based regeneration projects that involve local communities, helping to tackle inequalities and improving the economic, social and physical environment of deprived, disadvantaged and fragile remote communities across Scotland. It is community led, and will result in strong regeneration outcomes.

The Rockfield Garden is leased and run by Oban Communities Trust, a Community Benefit Society run by and for its members and the wider community. 

We are transforming a disused, previously cultivated food production area into a vibrant and inclusive community growing space, but need funding to realise our vision. This project is rooted in a growing community movement: over the past year, more than 1,100 volunteer hours have been contributed at The Rockfield Garden. The momentum is clear—and this garden will be a living, growing symbol of community action.

The space, located behind The Rockfield Centre, was previously used to grow fruit, vegetables, and flowers for the former McTavish's Kitchens, but has since lain derelict.

What will your project do? Over the last 12 months a 25+ band of volunteers have spend over 1000 hours on Phase 1, preparing the space for cultivation. We are now seeking funding for Phase 2, which will initiate food production and support both experienced and novice growers, fostering strong community involvement.

  • Installing fencing and handrails to ensure safety and accessibility
  • Building raised beds and flexible growing spaces for communal and individual use
  • Constructing a weatherproof meeting shelter and a secure tool shed.
  • Providing tools, gardening equipment, seeds, compost, and plants.
  • Developing a community composting system to promote circular growing practices.
  • Installing bee hives, chicken coops, and a community orchard
  • Offering a varied programme of community engagement and educational growing activities, including informal social gardening drop-ins, volunteer action days, and community education.

Why is your project needed? Oban currently has no community growing provision, and local residents lack accessible opportunities to grow, learn, and contribute. As a rural town we are also heavily reliant on imported food, reducing local food resilience and creating disproportionately high food mile loadings. This project will:

  • Provide the community with growing space, tools, and support to grow food locally.
  • Encourage healthier lifestyles and increased social connection through shared, hands-on activity
  • Respond to the pressing need for increased food resilience in the face of climate change and supply chain vulnerabilities.
  • Help diversify the town’s food sources, reducing reliance on imported produce and associated transport emissions.
  • Create a learning hub to build knowledge and practical skills in sustainable food growing, composting, and ecological gardening
  • Offer a mix of communal and some individually managed plots, providing flexibility to suit different needs and abilities.
  • Enhance community cohesion and empowerment through participation, ownership, and shared outcomes.
  • Contribute to the Rockfield Centre's mission to reduce its carbon footprint and provide wholesome, healthy, affordable community meals.

What positive changes will your project bring about? The Rockfield Garden will deliver wide-ranging benefits across environmental, social, and educational areas:

  • Environmental Impact: With an estimated growing area of 1,400m², there is potential to produce 2,000–3,000kg of fruit and vegetables annually. This local production could reduce food miles and cut an estimated 3–4 tonnes of CO₂ emissions per year.
  • Food Resilience: In light of climate change and global food supply threats, local food production is a vital adaptation strategy. Growing food locally in Oban will contribute to community-level food security and resilience.
  • Health and Wellbeing: Access to growing spaces and outdoor activities supports mental and physical wellbeing. Gardening fosters regular physical activity, better nutrition, and emotional connection to nature.
  • Learning and Empowerment: Hands-on education will equip participants with valuable skills in food production, sustainability, and ecological stewardship.
  • Community Cohesion: The project will bring together people of all ages and backgrounds, strengthening social bonds, reducing isolation, and building a sense of place and purpose.
  • Sustainability: By incorporating composting and circular practices, such as seed saving, the garden will serve as a practical example of sustainable community living. By transforming this underused land into a thriving garden, we’re not just growing food—we’re growing community, resilience, and shared futures.

How long will your project run for? This is a long-term project that is ticking along in Phase 1, but requires substantial funding to move to Phase 2. Once funded, we anticipate c. 1 year to do the required structural works. We anticipate the total works requiring c. 70k, including staff time, but would gladly accept smaller amounts of funding which would allow us to complete the project in a modular fashion.

No supports
Old forestry buildings

Creating a Cairnbaan Community Hub. Refurbishment of the old forestry buildings

2025-05-30  •  No comments  •  Cairnbaan Community Trust  •  Regeneration Capital Grant Fund

1. What we want to achieve.

The Cairnbaan Community Trust, (SC052905) wants to refurbish the forestry buildings to provide a community gathering point and flexible workshop and event spaces. We want a community hub that can be used by the community for education such as crafts and Gaelic, health e.g. yoga and other activities, recreation and social gatherings, inside and outside and temporary office space for local entrepreneurs.

Our priority is the smaller of the two buildings which will provide space for community events and workshops, social meeting space, hot desks and a community kitchen. There is external space that can be developed to provide a community garden and outside event space.  It is hoped in the future the larger of the two buildings can be developed to provide space for larger workshops and events.

We have divided the work into phases and we are currently seeking funding for phases 1 and 2. 

Phase 0: This covers the procurement of the forestry buildings under a community asset transfer funded by the Scottish Land Fund and we have secured initial funding for essential repairs to both buildings to make them safe and weatherproof.  The work will start when we take ownership on the 01/08/2025.

Phase 1: Is the refurbishment of the smaller building.  This phase will change the internal layout of the building to create flexible spaces.  This entails new partitions, doors, lighting and upgrade to the heating.  Additional facilities, external and internal, will be needed for disabled and users with special needs.  We also aim to fit a community kitchen and social space for coffee mornings.   Finally we need to replace windows and install new furnishings and fittings.

Phase 2: Is the landscaping and provision of a community garden and outdoor space.   

Phase 3: Is the refurbishment and fitting out of the larger building.  In this phase we also plan to look at energy efficiency improvements, e.g. heat pumps and solar panels.

2. Why our project is needed

Currently there is no community centre to provide a focal point or resources for the community.   There is a risk of social isolation amongst our older population and there are no facilities for the young people in our village.  Community cohesion is being eroded.

We commissioned a feasibility report through Community Enterprise which highlighted the following points. Accessing facilities is difficult without a car, the minimal bus service is a school service with no evening or Sunday services.  There are no shops, medical or other services in the village.  Despite scoring highly in other domains the area falls into the 10% most deprived areas in Scotland in terms of access to services in relation to the Scottish indices of multiple deprivation. Feedback from local people highlighted that a primary need in the community is an indoor social area and meeting space.

3. The positive changes our project will bring

Our vision is to reduce isolation, improve community life and reflect the cultural, environment and historic heritage of the area. The current priorities for the CCT are.

  • Bringing the community together to enable opportunities for social interaction and growth.
  • Advancement of arts, heritage, culture and science.
  • The provision and organization of recreational facilities to improve the quality of life for the community.
  • Improving the environment including education about the environment, culture and history.
  • The relief of thos in need either because of age, ill health, disability or financial hardship.

The refurbishment of the buidings will provide a focal point for the community and the resources to bring the community together especially those that feel isolated. It will provide resources for all ages across the community and give everyone opportunities for development and a sense of purpose and indentity.

Through current engagement with the local community we have already identified skills and volunteers that can contribute to the refurbishment which will foster community involvement from the outset

4. How long will our project run

Phase 1 and 2 of the project will start on: 05/01/2026

The project will run for: 15 months

Our Business plan and the Feasibility report are available on request.  Unfortunately the file size was too big to attach.

No supports
Youngster enjoying the ride.

"On your Bike", Tayinloan Youth Club

2025-04-29  •  No comments  •  Tayinloan Youth Club  •  Regeneration Capital Grant Fund

1. First and foremost, we want to keep our children safe while they enjoy being outdoors. The A83 runs the entire length of West Kintyre and as all the villages are spurs from this extremely fast and dangerous road, there is just nowhere safe for children to ride their bikes. To address this, we wish to install a pump track at Tayinloan

2. We feel it is needed because the main A83 is getting busier, and is one of the most dangerous roads in Scotland. Children and adults of all ages are now taking up more and more physical exercise and cycling has become very popular indeed.  We wish to offer a safe enclosed area where they can learn and ride in safety.

3. The project could bring many positive benefits.  Pump track riding not only provides a physical workout, but also promotes good mental well-being. It’s not just about the physical challenge – although that’s definitely a big part of the appeal. Spending time outdoors, surrounded by nature, has a way of melting away stress and lifting spirits. Pump track riding can actually help sharpen the mind and improve cognitive function. It is a way to encourage youngsters to leave their screens for a while and enjoy outdoor activities and social interaction.

These are just some of the positive changes for those participating in the sport. However there are many others, such as helping with social isolation which has become a big problem in these post Covid times.

At the pump track, generations come together, no matter their age! From little ones with their parents or grandparents to teenagers and young adults, everyone can enjoy fun and friendship, making it a true community hub. The little ones learn how to ride and gain confidence, while the more experienced riders practice their skills. Parents can have a great time too, as they watch their children gain confidence and make friends

4. Once the planning has been approved (hopefully within 6 months of application) and the funding secured, the pump track can be installed in 6 weeks.

We will work with Velosolutions, who are world leaders in this technology.

We will also liaise with schools and youth clubs.

We will work with Argyll and Bute Councillors

No supports
Piles damage

Save Tobermory Fisherman’s Pier

2025-06-02  •  No comments  •  Tobermory Fishermans Pier Association  •  Regeneration Capital Grant Fund

1 What do we want to do?

Tobermory Fisherman's Pier Association intends to renovate and improve Thomas Telford's hisoric pier for the use of fishermen and other commercial users.  We would like to preserve the pier as a place that can be used and enjoyed by locals and visitors alike.  We want to open the pier to other commercial users and provide a solution to the risk of flooding caused by increasingly higher tides.  A structural engineers report has been commissioned and has provided a plan for remedial works.

2 Why is the project needed?

While the pier is a vital economic resource for the fishermen of North Mull, it is also an essential and integral part of Tobermory's built heritage.  Without the pier the fishermen would need to look for alternative space to store and repair gear.  They would have to use moorings or pontoons and they would have to use alternative means to land their catch.  All of these alternatives are costly, inconvenient and not as safe as the platform provided by the pier.

We have the support of the community and are backed by Mull Community Council, Tobermory Harbour Association and Mull and Iona Community Trust.

3  What positive changes will our project bring about?

The proposed improvements to the pier will provide a fit for purpose structure that will enable the fishing community, and other commercial users, to have confidence in the long-term viability of their businesses and provide the oppurtunity to support new entrants to the sector.  Securing the long-term future of the pier will enable it to remain at the heart of the community for centuries to come, bringing economic benefit to the town as a platform for the fishermen and also as part of what draws visitors to Tobermory.  It will continue to be a much loved hub for community celebrations and a valued civic space for locals and visitors to enjoy.

4  How long will our project run for?

The project will start in March 2026 and run for seven months.

Please refer to the attached PDF file for our more comprehensive proposal.

No supports
Screenshot 2025-04-10 at 12.20.39.png

Jura Community Sports Facility - Project Aspiration

2025-04-10  •  No comments  •  Jura Community Enterprise (formerly Jura MUGA)  •  Regeneration Capital Grant Fund

The new sports facility will be suitable for all weather conditions and will enable the playing of various sports on the same surface, including five-a-side football, netball, basketball, and shinty practice.

The Jura Community Development Plan, produced by the Jura Development Trust, highlights the necessity for improved youth and recreational facilities on the Island and concludes that further investigation is required regarding the preferred nature of these facilities.

Developing community-owned and managed assets is strongly supported by national and local policy.

No supports
The Atlantis Leisure Centre in Oban

Renewing the fabric of Atlantis Leisure for the next Generation

2025-06-02  •  No comments  •  Atlantis Leisure  •  Regeneration Capital Grant Fund

Atlantis Leisure is a vibrant, community-run health and wellbeing hub in the heart of Oban. For over 30 years, we’ve been a lifeline for locals of all ages - a place where toddlers learn to swim, teens train with sports clubs, adults improve their fitness and older residents stay active and connected. As a registered charity and social enterprise, every penny we earn is reinvested. Our huge range of facilities are designed to support active, healthy lives. We work with schools, NHS partners, and community groups to deliver inclusive, high-impact services. With over 150,000 visits a year and no other facility like it for 95 miles, Atlantis isn’t just a leisure centre - it’s the beating heart of our community.

This application comprises separate projects that are also listed on Aspiring Places indivdiually but we thought it made sense to group them together as a single proposal for the purposes of RCGF too:

1. What do you want to do? We propose a multi-strand capital regeneration programme at Atlantis Leisure — a vital, community-owned asset serving Oban and surrounding remote rural areas — to deliver large-scale, community-led change aligned with RCGF's aims that breathes new life into an over 50 year old facility. 

This project brings together three deliverable, community-prioritised infrastructure improvements:

  1. Installation of rooftop solar panels and battery storage: significanty reducing carbon emissions, lowering long-term operating costs and contributing to Net Zero targets. 160k
  2. Expansion of Atlantis’ gym: a two-storey extension to accommodate growing community demand, support inclusive programmes like Elevate & Stay Active, and provide flexible meeting and office space to host outreach services and community partners. 175k
  3. Creation of accessible changing facility: reconfiguring existing internal space, to provide a dignified, fully inclusive changing area to support disabled users 50k
  4. Restoration of end of life outdoor sports pitch: bringing an end-of-life, unusable asset back into service, enabling schools, clubs, and informal groups to use it year-round, relieving pressure from indoor space and boosting physical activity levels. 90k
  5. Restoration of Sports Hall Roof: rectifying end-of-life aspects of the roofing. 150,000k

2. Why is your project needed? Atlantis Leisure is a community-run registered charity and social enterprise that delivers year-round access to sport, physical activity, and wellbeing services. We are the only such facility within a 95-mile radius and serve over 150,000 users annually — yet key parts of our infrastructure are now limiting access, affordability, and impact.

  • The pitch is end-of-life and unusable, with back-up facilities constrained by a statutory noise order.
  • We've run out of room in our existing gym facility meaning vital communtiy programmes like Healthy Options are unable to operate properly
  • There is no suitable changing space for users with complex access needs, meaning many are excluded from participation.
  • Energy costs are surging, making it harder to deliver affordable access and sustain services for low-income families.

The project will regenerate these essential community assets, futureproof our building, reduce inequalities in access, and enable Atlantis to deliver sustainable social value for decades to come — directly supporting the RCGF’s priorities around deprivation, climate, inclusion, and place-based transformation.

3. What positive changes will your project bring about?

  • Inclusive Infrastructure: The accessible changing space addresses long-standing inequality, empowering disabled users to participate fully & independently.
  • Net-Zero Progress: Solar & battery systems will directly reduce carbon emissions, support national climate goals, & make Atlantis more financially sustainable.
  • Renewed Community Space: The front pitch transformation will reinstate valuable outdoor capacity, expanding options for schools, clubs, and families.
  • Address Capacity Issues: Expanding the gym answers a growing problem with existing capacity.
  • Child Poverty Impact: Reducing running costs helps us to maintain subsidised programmes, removing financial barriers to physical & social wellbeing.
  • Place-Based Renewal: This project aligns with the Place Principle and National Strategy for Economic Transformation by investing in a community-anchored asset with cross-cutting impact.

Together, these outcomes represent transformational, community-led regeneration that will enhance the resilience, health, and wellbeing of Oban.

4. How long will your project run for?

The project is fully deliverable within FY 2026–27.

  • Start: Early 2026
  • End: March 2027
  • Drawdown Ready: All spend will be committed or completed within the terms of the RCGF.
  • Delivery Approach: Projects will be managed by Atlantis Leisure’s Facilities Subgroup with oversight from the Board. 
  • Match Funding: Confirmed: Atlantis own contribution. Pending: we are actively pursuing applications and conversations with other funders including LES's CARES programme

No supports
Ceilidh in Hall.jpg

Redevelopment of Tayvallich Community Hall

2025-05-28  •  No comments  •  Tayvallich Community Hall SCIO  •  Regeneration Capital Grant Fund

What we want to do - 

Phase 1 involves replacing the hall disabled access and the provision of a generator to enhance community resilience. 

Phase 2 re-configuring the toilet block and the provision of hot water in the ladies toilets.

Phase 3 - installing a decking, and two patio doors to enhance provision for events. Also creation of more storage. 

Why our project is needed. 

The hall is used by the local primary school for provision of sports facilities and other activities. The Parent Council arranges parties and other communal events - such as an annual car wash and wreath-making at Christmas. The hall provides many family events, shows, films and talks - to keep the local community informed and entertained. A seperate gym club runs on a wednesday. The multi-sport court provides for sporting activities such as hockey and tennis, and the playing field is used for football and field sports. 

Many tourists use the hall's facilities especially for events such as "Gala day", and tourism is an important industry in Scotland. The hall was instrumental in the creation of Tayvallich Initiative which aims to provide low-cost housing in the village for essential workers and implements "rural burdens" which help ensure community survival longer-term. The annual Kayak Symposium run by local firm "Argyll Kayaks", brings dozens to the village for a weekend, centered around the hall, which benefits the whole community including the community shop and the Inn. 

"Resilience Planning" is a recent aim of the Community Hall. A few months back there was a power outage for 4 days - many were caught out by it. Apart from losing heating and cooking, many have private water supplies (pumped) and so had no water either. The hall did its best as a "resilience hub" but had no electric itself - simply brewing hot drinks on a gas stove - it could not offer shelter/heating/lighting/hot food. Resilience planning involves a back-up generator to better serve the community in such future events. 

The hall provides many services to the local community. Yoga on a monday and thursday; table tennis on a monday; bowls on a thursday; "Pickle ball" on a tuesday; "stretch and tone" on a tuesday; Fencing on a wednesday; Lunch Club every month - providing for the retired members of our community. The hall also hosts First Aid classes which benefit the local community and beyond. 

The hall is also a popular venue for weddings (and funerals). There are regular Coffee Mornings in aid of a range of charities - Beatson cancer charity; the Lochgilphead Snowdrop Centre; and the Taynish run in aid of McMillan cancer care. The annual flower show is also a popular event. In addition, the hall hosts events such as Films and Talks - often being full to capacity. Friday and saturday evenings often see the hall host Bands and Ceilidhs which attract visitors from further afield. It encourages and supports local artists and musicians. 

The project will bring about many positive changes.

It is essential that the hall can continue to act as a community hub. Phase 1 - the generator - will ensure it can run as a resilience hub too. Phase 1 also includes better disabled access which is essential. Provision of better toilet facilities is also essential (Phase 2), given the hall's popularity. Phase 3 will increase the capacity of the hall - even more community activities will be encouraged and supported. 

The hall is a vital community resource and needs to be supported and protected. The success of the community hall helps kindle social cohesion - it is a vital part of village life.

The project will start in July 2025 and take 6 months to complete.  

No supports
Gateway Garden.jpg

South Kintyre Growing Project

2025-05-29  •  No comments  •  South Kintyre Development Trust  •  Regeneration Capital Grant Fund

SKDT already operates the gateway garden (under licence from ACHA), as well as the putting green and herb garden (under licence from ABC) and the Robert Black Memorial Helipad (owner operator).

SKDT has well developed plans in place for these areas, which we would obviously like to see being well used by the community.

The creation of the Gateway Garden over the last 18 months has provided opportunities for food growing, education and intergenerational activity which are identified actions in the Campbeltown Community Action Plan (2022 – 2027). The Growing Project will also go some way towards developing local resilience and food security.

The initial redevelopment of the Gateway Garden, which is in a prominent location at the entrance to the town, has given impetus to other volunteers and potential gardeners to come forward.

Unfortunately, the limited size of the current garden area has restricted the number of growing plots available. The Growing Project would allow us to identify other suitable growing areas which we can develop in a gradual and progressive way, The, now ceased, Campbeltown Community Garden has donated their remaining plant and equipment to SKDT, now in storage, which will give us a head start in developing new growing spaces.

We also have a large selection of lawnmowers, gardening tools, hoses and other items which we can use for this project. However we will still need to acquire additional equipment and sundries (gloves, boots, compost, fertiliser etc) to allow us to proceed.

We will look to access additional funding to develop the project further via local funding through e.g. Common Good Fund, MACC and Campbeltown Community Windfarm Fund.

The main focus of this expansive project will be to attract, retain and train volunteers to get their hands dirty and get digging, weeding and planting.

As well as our own volunteers, there is another group of volunteers who have been looking after the bus terminal area. We will work alongside and support both of these groups. We will access additional training and advice from a network of community gardens throughout Scotland.

We would also continue and expand our work with the local schools on developing their own gardens and teaching kids the benefits of growing your own food. This would also allow for some important intergenerational activities which improve the lives of young and old.

We will also support and lobby for the provision of allotments for people to grow their own produce.

No supports
Screenshot 2025-05-08 134517.jpg

From Small Seeds - Cornabus Community Forest Initiative

2025-05-08  •  No comments  •  Islay Development Initiative  •  Regeneration Capital Grant Fund

   

IDI has set aside an initial 25 acres of Cornabus Community Forest to deliver housing, a Community Orchard, Garden and allotments for the community. 

In 2021 we carried out extensive consultation on the proposed development site within the now community owned Cornabus Forest. Formerly a commercial Sitka Spruce plantation, the whole site will eventually be replanted with native broadleaf to replicate the Atlantic Rainforest once prevalent on Islay, delivering significant biodiversity benefits but also on the community wish list from the consultation was housing for young people, allotments, an orchard and forest trails and a garden areas. 

The project will endeavour to add social and environmental value to the site and also create a space for community members and groups to enjoy. In 2020 Islay lost it's well-known community garden at Islay House, due to the property being sold on the open market. This was a much loved and used community space. Although the site at Cornabus is not a walled garden, extensive research on other forest garden initiatives was carried out in 2022 - including visits to Royal Botanical Society managed forests and formal garden spaces, such as Benmore and Puck's Glen. The intention is to take some elements of the old community garden site and duplicate them and the new, with lots of additional features.

The project is highly ambitious, and the first stage of funding has been secured from Inspiring Scotland for development of the tree nursery site where we will grow the replacement trees.  Secondary funding has come from Carbon Neutral Islands, specifically to create some of the infrastructure and assist with a circular economy approach to fuel wood supply on the island at affordable rates. 

This is a lifetime legacy project that will create a destination for outdoor enjoyment but also offer a range of solutions to the socio-economic challenges that the island faces with a strong focus on becoming Carbon Neutral. Islay is in a housing crisis and the addition of 10 affordable houses will help address some of those issues. To ease pressure on the Grid, the project also comes with it’s own district heating system using the remaining Sitka Spruce on site as a fuel source, a wind turbine and solar panels.  

The finished project will deliver a host of positive benefits including but not limited to:

  • Employment
  • Affordable Housing
  • Circular Economy approach/local fuel
  • Community garden
  • Allotments
  • Carbon capture in new tree planting
  • Significant destination space for locals and visitors alike.

The project will link into Argyll College, Islay High School, Youth Initiative and employability. Partners and funders will be Scottish Government – Rural and Islands Housing Fund, Argyll and Bute Council and National Lottery. Community group usage will be open to all groups on the island and will link into national networks such as Community Woodlands Association, Scottish Islands Federation and Community Tree Nursery Network.

 

No supports
The Harbour and ASH

Lighting Up the Shore Station - a sustainable Hub for Tiree

2025-05-27  •  No comments  •  Hynish Trust  •  Regeneration Capital Grant Fund

1  We would like to refurbish Alan Stevenson House (ASH) to offer a locally inspired restaurant, bar with 6 ensuite rooms (1 disabled).  We would like to upgrade the Harbour with pontoons and seating/viewpoints to take in the wonderful natural environment and encourage people to come by boat to the site in the summer months.  Morton Boyd Hall (MBH) is an excellent multi purpose facility that just needs some upgrading and could complment any activities going on at the site.    The site at Hynish, with its heritage and special quality of place, has the opportunity to develop its local hospitality and develop something of a Hub for the southern end of the island.  Capturing tourism and events spend, alongside island/day visitor spend would provide a revenue stream.

2  The Skerryvore Shore Station was transferred to the Tiree community in January 25.  The transition has taken 3 years.  There are 3 income streams - Housing, Heritage and Business -  that will ensure it is a sustainable community organisation going forward.  We have been reviewing the use of our 20+ A listed buildings to ensure they are fit for purpose and revenue earning where possible.   ASH was first rebuilt in 1990 as a hostel type accomodation for groups with special needs.  it was only used for a few weeks in the summer months and was always a overhead for the charity.  MBH had been used to house the exhibition/museum but originally had been rebuilt as a multi purpose hall.  The harbour stands strong against the incredible tides and weather.  It is a viewpoint for sealife and birds.  The community when asked what they would like to see at the site in our survey and subsequent community events were clear that Business should be a priority.   84% said that they wanted a restaurant/cafe, quality accomodation and event space all year round.  They also wanted the Harbour preserved.  So our community mandate was clear.  We have piloted the restaurant and rooms over the past 2 years and now believe that it could definately work if we had a good standard of accomodation to offer and a multi purpose space for events.  We have moved the exhbition to another building to free up Morton Boyd Hall so that we have a this multi purpose facility.  We will then be able to work with community groups to put on a variety of events and functions during the year.  We will also be able to provide permanent employment for locals.

3  We can already see from our pilot that our community is very positive about the fact we have a local family working at ASH and have created year round employment for locals.  We have trialled a number of community events over last winter and they proved to be very popular.  The Tiree people just love the shore station and feel a strong sense of guardianship.  The pilot has also showed us that we could have a reasonable income stream from this.  We now have some facts and figures to base our projections on which gives us confidence this is the right way forward.  All the buildings at Hynish need to work and complement each other to ensure the "place" is kept in alignment.  The pilot has demonstrated that the restaurant/rooms/bar and events do contribute greatly to this.  The project would enhance the employment opportunities; keep a family with 3 children living on Tiree as they have jobs; provide the much needed income stream to ensure sustainability; reduce running costs; make the buildings all more energy efficient and in line with our aim to lower the carbon footprint and provice a place for people and business to floutish.

4  The project will start early in 2026 and be completed by November 2026.

No supports