Timber Pier

Inveraray Pier- A neglected Pearl of a Great Town

2025-05-31  •  No comments  •  Inspire Inveraray  •  Regeneration Capital Grant Fund

Inveraray Pier has been in a cycle of neglectful private ownership for over 20 years, and closed to the community, visitors and marine traffic for 10 years. In July 2023 Inspire Inveraray secured funding to purchase the pier on behalf of the community and has since successfully restored and opened the stone part of the pier to the public, however the timber pier remains closed and is in desperate need of restoration. 

The objective of the project is the restoration and opening of the existing timber peir. The heritage of the timber pier is at the heart of the community, and was identified as a priority in a recent community consultation. The timber pier is in extremely poor condition and ,without restoration, the risk of loss of a valuable local asset is inevitable.

Restoration works will commence as soon as funding has been achieved, ideally starting in October 2025.

The community ownership of the pier has given a sense of pride and achievement to local people who are now keen to help and get involved to get the timber part of the pier restored. This is the opportunity for the local community to manage a valuable local asset and to complete the full restoration of the pier including the timber part. Reopening the pier has connected local communities and is building confidence in the achievability and benefits of community asset ownership.

The pier is the gateway to Inveraray and for the past 10 years had been an eye sore in the town. Restoring the timber part of the pier will help increase the number of visitors to the town by boat, creating an opportunity to generate an income that can be reinvested into community projects.

The pier will be a flat and open accessible space encouraging activities such as water sports, community events and gatherings amongst the local community. Fully restoring the timber part will allow more vessels to moor in Inveraray, serving as a safe transfer platform for cargo and passengers.

Once fully restored, Heritage boards will be commissioned for placement on the pier to provide historical background for local people and visitors visiting Inveraray and its treasured pier.

No supports
Aerial View Tarbert Harbour

Tarbert Harbour Watercraft Launch & Recovery Slipway and Community Activity Hub

2025-04-09  •  No comments  •  Tarbert (Loch Fyne) Harbour Authority  •  Regeneration Capital Grant Fund

  1. Tarbert Harbour Authority has a bold and strategic ambition to build a Launch and Recovery Sportscraft / Watersports Slipway together with a Community and Watersports Activity Hub.  Whilst the Activity Hub and Slipway are linked as a strategic development; for the purposes of funding, build and project managment, they are being treated as distinct projects with individual costs, individual project timescales and individual benefits and outcome profiles. Phase 1  will see the development of a Watercraft Launch & Recovery Slipway, Kayak Pontoon and Boat Laydown Area - £1.5M   Phase 2 will see the building of a Community Water Sports and Activity Hub - £1.4M.

  2. The Project utilises a vacant and semi-derelict harbourside development plot to address: A significant health and social gap in terms of water sports, gym and soft play areas and associated learning and development activities.   An identified need for orgnanised, safe, educational and affordable access to the above facilities together with a learning area, meeting and events space.  Community Facilities are vital for the well-being of rural villages and a community hub/gym combined with a water sports facility can be a game-changer for diverse groups of people.  The integration of these amenities not only promotes physical health but also fosters social interaction together with economic growth.

  3. The development of the Community Water Sports Slipway and Activity Hub will provide wide ranging benefits.  Adults and children in Tarbert and Loch Fyne's local communities will have accessible opportunites to improve their health, wellbeing, social confidence, learning and skill sets.  Local families will benefit from access to safe soft play and early years development stimulus.  Young people in education along Loch Fyne will have the opportunity to acquire new experiences, skills and qualifications that will support their social development and provide a platform for demonstrating their capabilities in diverse ways. Visitors to Tarbert and the surrounding area, whether for work or leisure purposes, will be able to relax and participate in safe gym exercise, supervised water-based activities, training and development in sailing and boating to established National Standards.  Additional employment opportunities will be directly and indirectly created by this development.  The development will be a major step forward in realising the next stage in the village's regeneration and development.  Regular exercise is known to reduce stress, anxiety and depression, leading to healthier, more product individuals.  A well equipped gym provides access to fitness resources, encouraging users to adopt a healthy lifestyle.  The gym will cater for a wide range of fitness levels and interests, from beginners to advanced.  The Activity Hub will also be used as a training/meeting place for sports clubs/organisations, community groups, school groups, RYA training, activity leaders, famiies and friends.  

  4. It is proposed, once all Phase 1 funding is in place, to commence the development of the Launch/Retrieval Watercraft slipway this financial year with a completion date of mid 2026,  Phase 2 will follow, when funding allows, and when the final funding matrix is clearer.

Partnerships: We plan to collaborate with:

  1. Argyll & Bute community Council to align with local interests.

  2. Schools and educational institutions to promote learning opportunities.

  3. Local businesses, including bike hire providers and tourism boards, to enhance visitor engagement.

 

No supports
Community Village Hall/Community Hub

Clachan Village Hall/Community Hub Phoenix project

2025-06-02  •  No comments  •  Clachan Village Hall (Kintyre) SCIO SC050324  •  Regeneration Capital Grant Fund

Clachan lost its much loved and well used village hall due to terminal decline as an asbestos concrete roofed building with corroded portal flames and was demolished in 2022. The iconic historic B Lited Kilcalmonell church was purchased with a Scottish Land Fund grant to serve as a replacement village hall to arise like the proverbial phoenix from the ashes of the old hall. The hub will allow resumption of the dormant user group activities and will provide a recreational, educational venue for the comunity as well as a resource for private hire. It will also serve as an emergency centre to provide safe haven and meal provision at times of emergency such as has occured on many occasions over the past 10 years particualrly in relation to power cuts, village floods, a freak snow storm, and gales, some of which also resulted in blocking the A83 artery to Campbeltown. We are in the process of renovating the exisitng church building to provide the main comunal space and this work shold be completed by the end of the year.  This is being funded in part by are own fund raising initiatives and by local wind farm trust grants. We then need grant funding for the extension to provides the addtional space for : a catering/kitchen area, a small meeting room, additional storage and toilet provision with disabled access for larger capacity events and activities. It is is this extension project (phase 2) that we are seeking funding from the RCGF scheme as well as other agencies such as the Windfarm Trusts, and other grant funders. We are looking for this construction work to be done 2026-2027.

No supports
IMG-20240604-WA0002.jpg

Nonhebel Park (Final Phase)- Community Regeneration in Action

2025-05-30  •  No comments  •  Mull And Iona Community Trust (MICT)  •  Regeneration Capital Grant Fund

The Project:  We want to develop the final piece of community owned land available at Nonhebel Light Industrial Park, Tobermory to build up to two additional business units.   The new units will be for rent to businesses which are on a waiting list for space at the site.  Project Background & Need:  In response to community identified need for small business premises, community led rengeration charity, Mull and Iona Community Trust developed and now manages 38 business units plus fenced compounds, supporting 24 local businesses and an estimated 61 jobs.  There is a waiting list for the units still, proving market failure and the need to develop the final piece of land on the site to further support local businesses and economic regeneration in North Mull.     Project Outcomes: Positive Changes:  New business units supporting a minimum 2 businesses and up to another 8 local jobs.  Improving access to services, tackling rural poverty and population decline by supporting business expansion, start-up and employment; improving family incomes and making the island a more vibrant and sustainable place to live and work.  Project Timescales: Subject to securing funding, work to start in late 2025 and complete in Spring 2026. Highland and Island Enterprise are a project partner with a funding offer in the region of £200k.

 

 

 

No supports

Sonas Childcare Project

2025-05-26  •  No comments  •  South Islay Development  •  Regeneration Capital Grant Fund

SID plans to build a dedicated childcare facility to cater for babies and toddlers up to three years old and provide dedicated childcare services for the community. This building will complement the soon to be finished new community Pavilion, and will be set within the 16 acres of Playing Fields, with access to a nearby enclosed playpark, and plenty of green space. 

On Islay there are a very limited number of childminders available. Islay has had a steady number of babies born in the last three years (ranging from 20-22 babies/year) and this is predicted to rise. Due to the lack of services available, families are using relatives and friends as childminders to allow them to return to work. The provision of a dedicated childcare facility would provide flexibility with this.

The facility will bring the following positive changes: 

  • More flexibility for families with regards to 0 to 3 childcare options.
  • More opportunities for families to work childcare around their needs, enabling parents to return to work. 
  • Families may be encouraged to move to Islay, as instead of having severely limited childcare options there will be a dedicated facility. 
  • It will provide options for employment and training within the facility. It may help provide an opportunity for students and school leavers to gain work experience in their chosen field, without having to leave Islay. 

It is anticipated that it will be several years before the facility is up and running. The project is currently in the early stages. A Planning Application has been submitted to Argyll & Bute Council, and the Building Warrant has been completed as far as possible, given the current funding restrictions. SID are currently looking for funding to finalise the Building Warrant, and move on to the construction phases. 

No supports
Shed letterhead (cropped).jpeg

Strachur Community Men's Shed

2025-05-22  •  No comments  •  Strachur Community Mens Shed  •  Regeneration Capital Grant Fund

Our primary aim is to build a safe social/recreational workshop and creative workspace for retired men & women to undertake creative projects for the village and local district. This should assist in improving the appearance of Strachur and surrounding area for the benefit of the local community and visitors e.g. by reconstituting picnic areas that have fallen into disrepair, also by maintaining benches; fences etc. such as those in our community Heron Park and installing sculpture/art works where agreed as appropriate. Similar maintenance and creative projects would be made available to the district  with the involvement of people domiciled within a 10 mile radius. Existing craft and trade skills that 'Shed' members possess would be used to do this, hopefully enabling members to learn new skills as well. Other local organizations  would also benefit e.g. the local Youth/Drama Group where members could assist in the manufacture of costumes and scenery for the regular annual productions at reduced cost.

Like many small rural villages Strachur has an increasing population of retirees. We hope that involvement in local projects - through teamwork - would help in reducing feelings of isolation for the 'older' members of our community by providing mental and physical stimulation, thus showing the 'younger' members of our community that we still have something to contribute to village life whilst improving recreational facilities for all. This approach should enable the facility to be sustained for many years as people become aware of the projects we are involved in. The provision of workshop facilities should also benefit the village Memorial Hall by providing support for maintenance and supplementing the facilities available in the centre of the village. To this end we want to work with the local Development Corporation; the Village Hall Committee and the Organisations that use the limited facilities available at present.

No supports
Oban Lorne Clubhouse Designs

Oban Lorne RFC's Community Sports & Events Hub (Phase 1-2)

2025-05-21  •  No comments  •  Oban Lorne RFC & Community Sports Hub  •  Regeneration Capital Grant Fund

1. What do you want to do?

We aim to develop the Oban Sports & Events Hub—a modern, inclusive facility featuring a multi-sport clubhouse, floodlit pitches, gym, running track, and event spaces. This hub will serve as a central venue for sports, cultural events, and community gatherings, enhancing opportunities for physical activity and social engagement in Oban and the surrounding areas.

2. Why is your project needed?

Oban's existing sports infrastructure is outdated and lacks accessibility, limiting opportunities for participation in sports and community events. The current facilities do not meet the needs of the growing population, particularly youth and individuals with disabilities. By providing modern, accessible facilities, the Oban Sports & Events Hub will address these gaps, promoting inclusivity and community well-being.

3. What positive changes will your project bring about?

The hub will:

  • Enhance Health and Well-being: Provide facilities that encourage physical activity across all age groups.

  • Promote Inclusivity: Ensure accessible design for individuals with disabilities.

  • Support Youth Development: Offer programs and spaces dedicated to youth engagement.

  • Boost Local Economy: Attract events and visitors, supporting local businesses.

  • Foster Community Cohesion: Serve as a gathering place for diverse community groups.

 

4. How long will your project run for?

The project is planned over multiple phases and is subject to funding and lease agreements. The project has been designed to be flexible but includes:

  • Phase 1 (2025–mid 2026): Construction of the clubhouse, installation of floodlights, and development of the main pitch.

  • Phase 2 (mid–late 2026): Addition of a running track and 4G area.

  • Phase 3–4 (2027): Redevelopment of the bottom pitch and support of potential construction of the skate park.

  • Phases 5–8 (2028–2032): Expansion to include additional facilities and infrastructure improvements.

 

Partnerships:

We plan to collaborate with:

  • Local Sports Clubs: Oban Lorne RFC, Oban Saints FC, Oban Camanachd, and others.

  • Educational Institutions: Local schools and youth organisations, including the school hostel. 

  • Community Groups: Oban Community Skate Park Committee and cultural organisations.

  • Local Businesses & Charities: Atlantis Leisure, Adventure Oban, Happy Wee Health Club.

  • Local Authorities: Argyll and Bute Council for planning and support.

  • National Event Organisers

These partnerships will ensure the hub meets the diverse needs of the community and operates sustainably.

No supports
20221027_111318 (1).jpg

Complete our lifeline link road!

2025-06-02  •  No comments  •  Isle of Kerrera Development Trust  •  Regeneration Capital Grant Fund

In 2021 and 2022, IKDT secured funding to construst 1.79KM of brand new road connecting the North and South of the island. This project has been in the pipeline for many decades and has connected up the two different communities and is allowing our island to thrive as one. Just after we have secured the funding for the 2nd stage of the project, the tar topping, war broke out in Ukraine. Apart from the obvious humanitarian crisis, this had an instant impact on the price of all the raw materials required for surfacing. It meant we had to scale stage 2 back and make do with tarring the new built section of the road with a single layer of tar and leave approx 500 metres of road in an unbound, farm track state. Our plan for stage 2 had been to deliver 2 layers of tar over the new road (1.79km) and the 500m of existing road when we could petition the council to adopt the road as it connects up the existing council road to several council tax paying households. As it stands, while the road is in use and is hugely beneficial to life on the island however the maintenance burden on IKDT is not ideal. The council will not consider adoption until the road is brought up to the standard we had planned for stage 2 so we are hoping to complete the job. Adoption is key to the long term future of the road and indeed to whole community as it will allow unfettered access to all including vital services, emergency vehicles and access to the lifeline ferry service. The surfacing could be delivered in one week but the effects would be felt for generations to come. We would hope to continue the excellent working relationship with A&B Roads department to help deliver the best value for money possible.

No supports
The Isle of Mull Wet Weather Sports Hall

Isle of Mull Wet Weather Sports Hall

2025-06-01  •  No comments  •  The Isle of Mull Rugby Club  •  Regeneration Capital Grant Fund

What do you want to do?

Build a wet weather and indoor sports hall next to the Island playing fields at Garmony, near Craignure.

A healthy lifestyle is essential for the well being of a community. A core pillar of attaining health is access to physical activity. Over the past 20 years there has been a dramatic weather change on our island. Gone are the frosty days and snow covered mountains. During winters it rains most days and is often stormy. As a direct result of this sports participation on Mull has fallen away at an alarming rate. The proposed project is to construct a desperately needed Wet Weather Sports Hall. The project has significant support from throughout Mull. This was reinforced by active participation by our Community Council who submitted our application for full planning permission. This facility will be available for all to use. The Mull Rugby Club will be in full consultation with Sportscotland on a fair and equitable way to manage the facility. 

Why is your project needed?

There is no wet weather or indoor sports hall on Mull. As Mull is an island people cannot travel to facilities elsewhere without difficulty. They must be provided locally. 

Apart from greatly improving life on Mull this project will be invaluable to existing community sports groups, create opportunities for new organisations and, hopefully, re-establish some we have lost. Many events are organised at the Garmony playing fields but with the increase in inclement weather these often have to be cancelled on the day of the event. For example our island sports day has now been abandoned after many disruptions due to weather. It cannot proceed on wet grass. This was sole destroying for all involved. A cancellation causes great disruption to island life due to difficulties of communication as children are travelling by a variety of methods from up to 40 miles away and in different directions. With the hall this event could move inside if it was raining. The hall would also give our indoor athletes a suitable premises and allow them to have well catered home events on Mull. At last Mull would have a full sized basketball court and could, for the first time, play home games and join leagues. The facility would mean evening training for all sports could always go ahead no-matter the weather. Multiple badminton courts would provide an exciting and competitive space. It will even accommodate a tennis court for our keen players. It is heart breaking to record that the once very active Isle of Mull Football Association is no longer in existence. There is still a strong football presence on Mull and this facility will provide an indoor pitch giving an gateway to football participation in all weathers. And finally our own club, the Isle of Mull Rugby Club has seen a drastic decrease in player numbers over recent years. Training is almost always in wet, cold windy weather. This is disheartening for the players and leads to more injuries as the fitness to participate is diminished.

What positive changes will your project bring about?

This project will enrich life on the Island of Mull.

For the active participants the wet weather hall will provide a comfortable environment. This results in higher skill levels and increasing participation. For voluntary officials it will enhance achievement and remove the demoralising effect of bad weather. For communities it will encourage supporting roles and family involvement across all sports and leisure activities. The project also aligns with many lifestyle priorities. Well-being is improved. A tailored space protected from a hostile environment encourages diversity and inclusion for all. Try running a fun day in horizontal rain and our use of words becomes well chosen as only the hardy participate. Performance is improved across all age groups and skill levels leading to enhanced personal satisfaction.

It is highly probable that a project of this nature will encourage local families to stay on Mull and remove barriers to decisions on whether to move to our island. It is therefore considered that the project will have a positive impact on the population of our island. The Mull Community Council was unanimous in its support of the project.

By situating this project at Garmony it becomes part of a prooven sports destination. The Isle of Mull Rugby Sevens takes place at Garmony and this event has attracted teams from as far away as America with four figure attendances each year. Members and players of visiting teams and organisations will find the experience of using the facility highly rewarding.

How long will your project run for?

This project is stage three of the long term development of sports facilities at Garmony on the Isle of Mull.

Out of a need for playing facilities the Isle of Mull Rugby Club decided to embark on a long term development of sports facilities for the island. There were none available on Mull. An island survey by Tobermory High School selected Garmony as it was in a central position on Mull and was situated between the two main ferry terminals of Craignure and Fishnish.

Stage 1 Building a two pitch sports field from scratch on waste ground. Successfully completed.

Stage 2 Building changing rooms and community club house with kitchen. Successfully completed.

Stage 3 Building a wet weather facility. This objective was always planned but has become a matter of urgency in recent years. We project a start date and completion in 2026

The existing Garmony facilities are available for all to use. They also receive no revenue support and are fully self-supporting financially. We anticipate the same for Stage 3.

No supports
20221027_111318 (1).jpg

Complete our lifeline link road!

2025-06-02  •  No comments  •  Isle of Kerrera Development Trust  •  Regeneration Capital Grant Fund

In 2021 and 2022, IKDT secured funding to construst 1.79KM of brand new road connecting the North and South of the island. This project has been in the pipeline for many decades and has connected up the two different communities and is allowing our island to thrive as one. Just after we have secured the funding for the 2nd stage of the project, the tar topping, war broke out in Ukraine. Apart from the obvious humanitarian crisis, this had an instant impact on the price of all the raw materials required for surfacing. It meant we had to scale stage 2 back and make do with tarring the new built section of the road with a single layer of tar and leave approx 500 metres of road in an unbound, farm track state. Our plan for stage 2 had been to deliver 2 layers of tar over the new road (1.79km) and the 500m of existing road when we could petition the council to adopt the road as it connects up the existing council road to several council tax paying households. As it stands, while the road is in use and is hugely beneficial to life on the island however the maintenance burden on IKDT is not ideal. The council will not consider adoption until the road is brought up to the standard we had planned for stage 2 so we are hoping to complete the job. Adoption is key to the long term future of the road and indeed to whole community as it will allow unfettered access to all including vital services, emergency vehicles and access to the lifeline ferry service. The surfacing could be delivered in one week but the effects would be felt for generations to come. We would hope to continue the excellent working relationship with A&B Roads department to help deliver the best value for money possible.

No supports