Project Proposals: Regeneration Capital Grant Fund

Total budget £0

The Isle of Mull Wet Weather Sports Hall

Isle of Mull Wet Weather Sports Hall

2025-06-01  •  No comments  •  The Isle of Mull Rugby Club  •  Regeneration Capital Grant Fund

What do you want to do?

Build a wet weather and indoor sports hall next to the Island playing fields at Garmony, near Craignure.

A healthy lifestyle is essential for the well being of a community. A core pillar of attaining health is access to physical activity. Over the past 20 years there has been a dramatic weather change on our island. Gone are the frosty days and snow covered mountains. During winters it rains most days and is often stormy. As a direct result of this sports participation on Mull has fallen away at an alarming rate. The proposed project is to construct a desperately needed Wet Weather Sports Hall. The project has significant support from throughout Mull. This was reinforced by active participation by our Community Council who submitted our application for full planning permission. This facility will be available for all to use. The Mull Rugby Club will be in full consultation with Sportscotland on a fair and equitable way to manage the facility. 

Why is your project needed?

There is no wet weather or indoor sports hall on Mull. As Mull is an island people cannot travel to facilities elsewhere without difficulty. They must be provided locally. 

Apart from greatly improving life on Mull this project will be invaluable to existing community sports groups, create opportunities for new organisations and, hopefully, re-establish some we have lost. Many events are organised at the Garmony playing fields but with the increase in inclement weather these often have to be cancelled on the day of the event. For example our island sports day has now been abandoned after many disruptions due to weather. It cannot proceed on wet grass. This was sole destroying for all involved. A cancellation causes great disruption to island life due to difficulties of communication as children are travelling by a variety of methods from up to 40 miles away and in different directions. With the hall this event could move inside if it was raining. The hall would also give our indoor athletes a suitable premises and allow them to have well catered home events on Mull. At last Mull would have a full sized basketball court and could, for the first time, play home games and join leagues. The facility would mean evening training for all sports could always go ahead no-matter the weather. Multiple badminton courts would provide an exciting and competitive space. It will even accommodate a tennis court for our keen players. It is heart breaking to record that the once very active Isle of Mull Football Association is no longer in existence. There is still a strong football presence on Mull and this facility will provide an indoor pitch giving an gateway to football participation in all weathers. And finally our own club, the Isle of Mull Rugby Club has seen a drastic decrease in player numbers over recent years. Training is almost always in wet, cold windy weather. This is disheartening for the players and leads to more injuries as the fitness to participate is diminished.

What positive changes will your project bring about?

This project will enrich life on the Island of Mull.

For the active participants the wet weather hall will provide a comfortable environment. This results in higher skill levels and increasing participation. For voluntary officials it will enhance achievement and remove the demoralising effect of bad weather. For communities it will encourage supporting roles and family involvement across all sports and leisure activities. The project also aligns with many lifestyle priorities. Well-being is improved. A tailored space protected from a hostile environment encourages diversity and inclusion for all. Try running a fun day in horizontal rain and our use of words becomes well chosen as only the hardy participate. Performance is improved across all age groups and skill levels leading to enhanced personal satisfaction.

It is highly probable that a project of this nature will encourage local families to stay on Mull and remove barriers to decisions on whether to move to our island. It is therefore considered that the project will have a positive impact on the population of our island. The Mull Community Council was unanimous in its support of the project.

By situating this project at Garmony it becomes part of a prooven sports destination. The Isle of Mull Rugby Sevens takes place at Garmony and this event has attracted teams from as far away as America with four figure attendances each year. Members and players of visiting teams and organisations will find the experience of using the facility highly rewarding.

How long will your project run for?

This project is stage three of the long term development of sports facilities at Garmony on the Isle of Mull.

Out of a need for playing facilities the Isle of Mull Rugby Club decided to embark on a long term development of sports facilities for the island. There were none available on Mull. An island survey by Tobermory High School selected Garmony as it was in a central position on Mull and was situated between the two main ferry terminals of Craignure and Fishnish.

Stage 1 Building a two pitch sports field from scratch on waste ground. Successfully completed.

Stage 2 Building changing rooms and community club house with kitchen. Successfully completed.

Stage 3 Building a wet weather facility. This objective was always planned but has become a matter of urgency in recent years. We project a start date and completion in 2026

The existing Garmony facilities are available for all to use. They also receive no revenue support and are fully self-supporting financially. We anticipate the same for Stage 3.

No supports
Oban Lorne Clubhouse Designs

Oban Lorne RFC's Community Sports & Events Hub (Phase 1-2)

2025-05-21  •  No comments  •  Oban Lorne RFC & Community Sports Hub  •  Regeneration Capital Grant Fund

1. What do you want to do?

We aim to develop the Oban Sports & Events Hub—a modern, inclusive facility featuring a multi-sport clubhouse, floodlit pitches, gym, running track, and event spaces. This hub will serve as a central venue for sports, cultural events, and community gatherings, enhancing opportunities for physical activity and social engagement in Oban and the surrounding areas.

2. Why is your project needed?

Oban's existing sports infrastructure is outdated and lacks accessibility, limiting opportunities for participation in sports and community events. The current facilities do not meet the needs of the growing population, particularly youth and individuals with disabilities. By providing modern, accessible facilities, the Oban Sports & Events Hub will address these gaps, promoting inclusivity and community well-being.

3. What positive changes will your project bring about?

The hub will:

  • Enhance Health and Well-being: Provide facilities that encourage physical activity across all age groups.

  • Promote Inclusivity: Ensure accessible design for individuals with disabilities.

  • Support Youth Development: Offer programs and spaces dedicated to youth engagement.

  • Boost Local Economy: Attract events and visitors, supporting local businesses.

  • Foster Community Cohesion: Serve as a gathering place for diverse community groups.

 

4. How long will your project run for?

The project is planned over multiple phases and is subject to funding and lease agreements. The project has been designed to be flexible but includes:

  • Phase 1 (2025–mid 2026): Construction of the clubhouse, installation of floodlights, and development of the main pitch.

  • Phase 2 (mid–late 2026): Addition of a running track and 4G area.

  • Phase 3–4 (2027): Redevelopment of the bottom pitch and support of potential construction of the skate park.

  • Phases 5–8 (2028–2032): Expansion to include additional facilities and infrastructure improvements.

 

Partnerships:

We plan to collaborate with:

  • Local Sports Clubs: Oban Lorne RFC, Oban Saints FC, Oban Camanachd, and others.

  • Educational Institutions: Local schools and youth organisations, including the school hostel. 

  • Community Groups: Oban Community Skate Park Committee and cultural organisations.

  • Local Businesses & Charities: Atlantis Leisure, Adventure Oban, Happy Wee Health Club.

  • Local Authorities: Argyll and Bute Council for planning and support.

  • National Event Organisers

These partnerships will ensure the hub meets the diverse needs of the community and operates sustainably.

No supports

Unlocking Ulva: A Community Barge to Connect, Create and Thrive

2025-06-02  •  No comments  •  North West Mull Community Woodland Company  •  Regeneration Capital Grant Fund

North West Mull Community Woodland Company (NWMCWC) proposes to purchase and operate a community-owned barge to serve the Isle of Ulva. This transformative asset will unlock essential access for people, goods, vehicles, livestock, and materials - enabling regeneration, resilience, and economic growth on a fragile, remote island currently constrained by limited marine transport.

Ulva is a roadless island off the west coast of Mull, with no bridge and only a passenger ferry. The community is entirely reliant on the support of a local fish farm for occasional barge support - help that has been generous and invaluable over the last few years, though is naturally limited. This creates a significant barrier to regeneration, preventing progress on key projects and undermining the island’s long-term sustainability. 

The barge will address this infrastructure gap and enable a range of community-led initiatives, including:

  • Heritage restoration, including the movement of scaffolding, stone, and tools to repair historic buildings like Ulva House or Telford-designed church, and other community buildings.

  • Sustainable land management, supporting crofting and farming by transporting livestock, feed, and agricultural supplies, as well as help with the removal of unused and broken equipment and machinery.

  • Resident-led business development, giving islanders the infrastructure needed to start and sustain their own small enterprises - enabling self-sufficiency and reducing dependence on external services.

  • Contractor and service access, allowing building and infrastructure work to proceed without excessive private transport costs.

  • Emergency resilience, offering an alternative logistics route in the event of ferry failure.

  • A community-led initiatives like Ulva Producers’ Market, connecting local growers, makers, and visitors in a shared island space.

  • Cultural and community events, such as pop-up exhibitions, and other events that require transporting bulky or heavy equipment.

As one resident said, "A community barge would secure the long-term future of the farm and ensure we’re no longer totally reliant on a third party to move livestock or machinery. It would also open up opportunities for diversification. On a personal level, it would create a more sustainable and flexible connection between Ulva and Mull—helping our community grow, thrive, and engage more with the wider community of north-west Mull.”

The barge will be community-owned, maintained by NWMCWC, and operated in partnership with residents and local businesses. It will have multiple uses and function flexibly, supporting both everyday needs and long-term community goals. Critically, it provides a foundation for further regeneration efforts, addressing a clear case of market failure and enabling transformational change.

The project will be ready to commence once capital funding is secured, with delivery anticipated over 12–18 months, including procurement, compliance, training, and launch.

No supports
Site plan for reference and example

Creating a Safe, Accessible, Multi-Purpose Gathering Space in the Heart of Oban

2025-06-02  •  No comments  •  Oban Communities Trust  •  Regeneration Capital Grant Fund

This proposal meets RCGF criteria:  supporting locally developed, place-based regeneration projects that involve local communities, helping to tackle inequalities and improving the economic, social and physical environment of deprived, disadvantaged and fragile remote communities across Scotland. It is community led, addresses market failure (inadequate parking and outdoor event space) and will result in strong regeneration outcomes.

The Rockfield Centre is owned and run by Oban Communities Trust, a Community Benefit Society run by and for its members and the wider community. It sits within c. 2000 m2 of old playpark, currently used as a car park

What will your project do? The project will re-surface the existing outdoor space surrounding The Rockfield Centre, resulting in a safe, smooth surfaced area which can be used to bring the community together through large-scale outdoor events, create economic additionality by unlocking new potential for town centre events, and contribute to ongoing town-centre carparking demand.

Why is your project needed? In the recent past, The Rockfield Centre's outdoor space has been used for a range of outdoor events from the Clipper food and drink village (July 2024) and the centre's Spring Festival (June 2025), whilst day-to-day it contributes ~ 50 spaces to the town centre parking supply - a critical resource during peak season. However, the space is badly in need of resurfacing, both to ensure its future as a carparking resource and to enable its use as a safe and accessible community gathering space. 

What positive changes will your project bring about? We belive that this project will unlock huge potential for outdoor events within Oban town centre, with benefits for business, local charities, and the wider community. Our strategic planning has identified a need within the Oban town centre area for a flexible and adaptable outdoor space that can be used by community groups for a wide range of activities - including markets, concerts, festivals, and outdoor theatre. Our outdoor space is the ideal location for holding these events as it is enclosed, easy to secure, and removes the need for disruptive and costly road closures which would be highly advantageous in a town which regularly experiences traffic flow issues and can struggle with capacity at peak times. We believe that Oban and the wider community will benefit from this project as it will open up opportunities which have otherwise not been considered, as there is no alternative suitable town centre area that can offer these facilities. This project will allow these opportunities to be fully explored and realised. The Rockfield Centre is strategically placed at the heart of the town, and is open to all. We have a track record of successfully delivering exciting, inclusive, and novel community-focussed events alongside large contracted projects, and are fully commited to working collabaratively and building strength through partnerships.

How long will your project run for?  Once funding is in place, the works could be completed quickly with actual disruption to the space kept to 2-3 weeks. We estimate the cost to be £60k (based on quotes obtained in summer 2024). We aim to have this work completed by the end of 2025.

No supports
20221027_111318 (1).jpg

Complete our lifeline link road!

2025-06-02  •  No comments  •  Isle of Kerrera Development Trust  •  Regeneration Capital Grant Fund

In 2021 and 2022, IKDT secured funding to construst 1.79KM of brand new road connecting the North and South of the island. This project has been in the pipeline for many decades and has connected up the two different communities and is allowing our island to thrive as one. Just after we have secured the funding for the 2nd stage of the project, the tar topping, war broke out in Ukraine. Apart from the obvious humanitarian crisis, this had an instant impact on the price of all the raw materials required for surfacing. It meant we had to scale stage 2 back and make do with tarring the new built section of the road with a single layer of tar and leave approx 500 metres of road in an unbound, farm track state. Our plan for stage 2 had been to deliver 2 layers of tar over the new road (1.79km) and the 500m of existing road when we could petition the council to adopt the road as it connects up the existing council road to several council tax paying households. As it stands, while the road is in use and is hugely beneficial to life on the island however the maintenance burden on IKDT is not ideal. The council will not consider adoption until the road is brought up to the standard we had planned for stage 2 so we are hoping to complete the job. Adoption is key to the long term future of the road and indeed to whole community as it will allow unfettered access to all including vital services, emergency vehicles and access to the lifeline ferry service. The surfacing could be delivered in one week but the effects would be felt for generations to come. We would hope to continue the excellent working relationship with A&B Roads department to help deliver the best value for money possible.

No supports
Shed letterhead (cropped).jpeg

Strachur Community Men's Shed

2025-05-22  •  No comments  •  Strachur Community Mens Shed  •  Regeneration Capital Grant Fund

Our primary aim is to build a safe social/recreational workshop and creative workspace for retired men & women to undertake creative projects for the village and local district. This should assist in improving the appearance of Strachur and surrounding area for the benefit of the local community and visitors e.g. by reconstituting picnic areas that have fallen into disrepair, also by maintaining benches; fences etc. such as those in our community Heron Park and installing sculpture/art works where agreed as appropriate. Similar maintenance and creative projects would be made available to the district  with the involvement of people domiciled within a 10 mile radius. Existing craft and trade skills that 'Shed' members possess would be used to do this, hopefully enabling members to learn new skills as well. Other local organizations  would also benefit e.g. the local Youth/Drama Group where members could assist in the manufacture of costumes and scenery for the regular annual productions at reduced cost.

Like many small rural villages Strachur has an increasing population of retirees. We hope that involvement in local projects - through teamwork - would help in reducing feelings of isolation for the 'older' members of our community by providing mental and physical stimulation, thus showing the 'younger' members of our community that we still have something to contribute to village life whilst improving recreational facilities for all. This approach should enable the facility to be sustained for many years as people become aware of the projects we are involved in. The provision of workshop facilities should also benefit the village Memorial Hall by providing support for maintenance and supplementing the facilities available in the centre of the village. To this end we want to work with the local Development Corporation; the Village Hall Committee and the Organisations that use the limited facilities available at present.

No supports

Sonas Childcare Project

2025-05-26  •  No comments  •  South Islay Development  •  Regeneration Capital Grant Fund

SID plans to build a dedicated childcare facility to cater for babies and toddlers up to three years old and provide dedicated childcare services for the community. This building will complement the soon to be finished new community Pavilion, and will be set within the 16 acres of Playing Fields, with access to a nearby enclosed playpark, and plenty of green space. 

On Islay there are a very limited number of childminders available. Islay has had a steady number of babies born in the last three years (ranging from 20-22 babies/year) and this is predicted to rise. Due to the lack of services available, families are using relatives and friends as childminders to allow them to return to work. The provision of a dedicated childcare facility would provide flexibility with this.

The facility will bring the following positive changes: 

  • More flexibility for families with regards to 0 to 3 childcare options.
  • More opportunities for families to work childcare around their needs, enabling parents to return to work. 
  • Families may be encouraged to move to Islay, as instead of having severely limited childcare options there will be a dedicated facility. 
  • It will provide options for employment and training within the facility. It may help provide an opportunity for students and school leavers to gain work experience in their chosen field, without having to leave Islay. 

It is anticipated that it will be several years before the facility is up and running. The project is currently in the early stages. A Planning Application has been submitted to Argyll & Bute Council, and the Building Warrant has been completed as far as possible, given the current funding restrictions. SID are currently looking for funding to finalise the Building Warrant, and move on to the construction phases. 

No supports
Photograph of the Rockfield Garden

Creating a Community Growing Space in Oban Town Centre

2025-06-02  •  No comments  •  Oban Communities Trust  •  Regeneration Capital Grant Fund

This project meets RCGF criteria: address vacant / derelict land as well as supporting locally developed, place-based regeneration projects that involve local communities, helping to tackle inequalities and improving the economic, social and physical environment of deprived, disadvantaged and fragile remote communities across Scotland. It is community led, and will result in strong regeneration outcomes.

The Rockfield Garden is leased and run by Oban Communities Trust, a Community Benefit Society run by and for its members and the wider community. 

We are transforming a disused, previously cultivated food production area into a vibrant and inclusive community growing space, but need funding to realise our vision. This project is rooted in a growing community movement: over the past year, more than 1,100 volunteer hours have been contributed at The Rockfield Garden. The momentum is clear—and this garden will be a living, growing symbol of community action.

The space, located behind The Rockfield Centre, was previously used to grow fruit, vegetables, and flowers for the former McTavish's Kitchens, but has since lain derelict.

What will your project do? Over the last 12 months a 25+ band of volunteers have spend over 1000 hours on Phase 1, preparing the space for cultivation. We are now seeking funding for Phase 2, which will initiate food production and support both experienced and novice growers, fostering strong community involvement.

  • Installing fencing and handrails to ensure safety and accessibility
  • Building raised beds and flexible growing spaces for communal and individual use
  • Constructing a weatherproof meeting shelter and a secure tool shed.
  • Providing tools, gardening equipment, seeds, compost, and plants.
  • Developing a community composting system to promote circular growing practices.
  • Installing bee hives, chicken coops, and a community orchard
  • Offering a varied programme of community engagement and educational growing activities, including informal social gardening drop-ins, volunteer action days, and community education.

Why is your project needed? Oban currently has no community growing provision, and local residents lack accessible opportunities to grow, learn, and contribute. As a rural town we are also heavily reliant on imported food, reducing local food resilience and creating disproportionately high food mile loadings. This project will:

  • Provide the community with growing space, tools, and support to grow food locally.
  • Encourage healthier lifestyles and increased social connection through shared, hands-on activity
  • Respond to the pressing need for increased food resilience in the face of climate change and supply chain vulnerabilities.
  • Help diversify the town’s food sources, reducing reliance on imported produce and associated transport emissions.
  • Create a learning hub to build knowledge and practical skills in sustainable food growing, composting, and ecological gardening
  • Offer a mix of communal and some individually managed plots, providing flexibility to suit different needs and abilities.
  • Enhance community cohesion and empowerment through participation, ownership, and shared outcomes.
  • Contribute to the Rockfield Centre's mission to reduce its carbon footprint and provide wholesome, healthy, affordable community meals.

What positive changes will your project bring about? The Rockfield Garden will deliver wide-ranging benefits across environmental, social, and educational areas:

  • Environmental Impact: With an estimated growing area of 1,400m², there is potential to produce 2,000–3,000kg of fruit and vegetables annually. This local production could reduce food miles and cut an estimated 3–4 tonnes of CO₂ emissions per year.
  • Food Resilience: In light of climate change and global food supply threats, local food production is a vital adaptation strategy. Growing food locally in Oban will contribute to community-level food security and resilience.
  • Health and Wellbeing: Access to growing spaces and outdoor activities supports mental and physical wellbeing. Gardening fosters regular physical activity, better nutrition, and emotional connection to nature.
  • Learning and Empowerment: Hands-on education will equip participants with valuable skills in food production, sustainability, and ecological stewardship.
  • Community Cohesion: The project will bring together people of all ages and backgrounds, strengthening social bonds, reducing isolation, and building a sense of place and purpose.
  • Sustainability: By incorporating composting and circular practices, such as seed saving, the garden will serve as a practical example of sustainable community living. By transforming this underused land into a thriving garden, we’re not just growing food—we’re growing community, resilience, and shared futures.

How long will your project run for? This is a long-term project that is ticking along in Phase 1, but requires substantial funding to move to Phase 2. Once funded, we anticipate c. 1 year to do the required structural works. We anticipate the total works requiring c. 70k, including staff time, but would gladly accept smaller amounts of funding which would allow us to complete the project in a modular fashion.

No supports
Ceilidh in Hall.jpg

Redevelopment of Tayvallich Community Hall

2025-05-28  •  No comments  •  Tayvallich Community Hall SCIO  •  Regeneration Capital Grant Fund

What we want to do - 

Phase 1 involves replacing the hall disabled access and the provision of a generator to enhance community resilience. 

Phase 2 re-configuring the toilet block and the provision of hot water in the ladies toilets.

Phase 3 - installing a decking, and two patio doors to enhance provision for events. Also creation of more storage. 

Why our project is needed. 

The hall is used by the local primary school for provision of sports facilities and other activities. The Parent Council arranges parties and other communal events - such as an annual car wash and wreath-making at Christmas. The hall provides many family events, shows, films and talks - to keep the local community informed and entertained. A seperate gym club runs on a wednesday. The multi-sport court provides for sporting activities such as hockey and tennis, and the playing field is used for football and field sports. 

Many tourists use the hall's facilities especially for events such as "Gala day", and tourism is an important industry in Scotland. The hall was instrumental in the creation of Tayvallich Initiative which aims to provide low-cost housing in the village for essential workers and implements "rural burdens" which help ensure community survival longer-term. The annual Kayak Symposium run by local firm "Argyll Kayaks", brings dozens to the village for a weekend, centered around the hall, which benefits the whole community including the community shop and the Inn. 

"Resilience Planning" is a recent aim of the Community Hall. A few months back there was a power outage for 4 days - many were caught out by it. Apart from losing heating and cooking, many have private water supplies (pumped) and so had no water either. The hall did its best as a "resilience hub" but had no electric itself - simply brewing hot drinks on a gas stove - it could not offer shelter/heating/lighting/hot food. Resilience planning involves a back-up generator to better serve the community in such future events. 

The hall provides many services to the local community. Yoga on a monday and thursday; table tennis on a monday; bowls on a thursday; "Pickle ball" on a tuesday; "stretch and tone" on a tuesday; Fencing on a wednesday; Lunch Club every month - providing for the retired members of our community. The hall also hosts First Aid classes which benefit the local community and beyond. 

The hall is also a popular venue for weddings (and funerals). There are regular Coffee Mornings in aid of a range of charities - Beatson cancer charity; the Lochgilphead Snowdrop Centre; and the Taynish run in aid of McMillan cancer care. The annual flower show is also a popular event. In addition, the hall hosts events such as Films and Talks - often being full to capacity. Friday and saturday evenings often see the hall host Bands and Ceilidhs which attract visitors from further afield. It encourages and supports local artists and musicians. 

The project will bring about many positive changes.

It is essential that the hall can continue to act as a community hub. Phase 1 - the generator - will ensure it can run as a resilience hub too. Phase 1 also includes better disabled access which is essential. Provision of better toilet facilities is also essential (Phase 2), given the hall's popularity. Phase 3 will increase the capacity of the hall - even more community activities will be encouraged and supported. 

The hall is a vital community resource and needs to be supported and protected. The success of the community hall helps kindle social cohesion - it is a vital part of village life.

The project will start in July 2025 and take 6 months to complete.  

No supports
Youngster enjoying the ride.

"On your Bike", Tayinloan Youth Club

2025-04-29  •  No comments  •  Tayinloan Youth Club  •  Regeneration Capital Grant Fund

1. First and foremost, we want to keep our children safe while they enjoy being outdoors. The A83 runs the entire length of West Kintyre and as all the villages are spurs from this extremely fast and dangerous road, there is just nowhere safe for children to ride their bikes. To address this, we wish to install a pump track at Tayinloan

2. We feel it is needed because the main A83 is getting busier, and is one of the most dangerous roads in Scotland. Children and adults of all ages are now taking up more and more physical exercise and cycling has become very popular indeed.  We wish to offer a safe enclosed area where they can learn and ride in safety.

3. The project could bring many positive benefits.  Pump track riding not only provides a physical workout, but also promotes good mental well-being. It’s not just about the physical challenge – although that’s definitely a big part of the appeal. Spending time outdoors, surrounded by nature, has a way of melting away stress and lifting spirits. Pump track riding can actually help sharpen the mind and improve cognitive function. It is a way to encourage youngsters to leave their screens for a while and enjoy outdoor activities and social interaction.

These are just some of the positive changes for those participating in the sport. However there are many others, such as helping with social isolation which has become a big problem in these post Covid times.

At the pump track, generations come together, no matter their age! From little ones with their parents or grandparents to teenagers and young adults, everyone can enjoy fun and friendship, making it a true community hub. The little ones learn how to ride and gain confidence, while the more experienced riders practice their skills. Parents can have a great time too, as they watch their children gain confidence and make friends

4. Once the planning has been approved (hopefully within 6 months of application) and the funding secured, the pump track can be installed in 6 weeks.

We will work with Velosolutions, who are world leaders in this technology.

We will also liaise with schools and youth clubs.

We will work with Argyll and Bute Councillors

No supports