Project Proposals: Regeneration Capital Grant Fund

Total budget £0

Shed letterhead (cropped).jpeg

Strachur Community Men's Shed

2025-05-22  •  No comments  •  Strachur Community Mens Shed  •  Regeneration Capital Grant Fund

Our primary aim is to build a safe social/recreational workshop and creative workspace for retired men & women to undertake creative projects for the village and local district. This should assist in improving the appearance of Strachur and surrounding area for the benefit of the local community and visitors e.g. by reconstituting picnic areas that have fallen into disrepair, also by maintaining benches; fences etc. such as those in our community Heron Park and installing sculpture/art works where agreed as appropriate. Similar maintenance and creative projects would be made available to the district  with the involvement of people domiciled within a 10 mile radius. Existing craft and trade skills that 'Shed' members possess would be used to do this, hopefully enabling members to learn new skills as well. Other local organizations  would also benefit e.g. the local Youth/Drama Group where members could assist in the manufacture of costumes and scenery for the regular annual productions at reduced cost.

Like many small rural villages Strachur has an increasing population of retirees. We hope that involvement in local projects - through teamwork - would help in reducing feelings of isolation for the 'older' members of our community by providing mental and physical stimulation, thus showing the 'younger' members of our community that we still have something to contribute to village life whilst improving recreational facilities for all. This approach should enable the facility to be sustained for many years as people become aware of the projects we are involved in. The provision of workshop facilities should also benefit the village Memorial Hall by providing support for maintenance and supplementing the facilities available in the centre of the village. To this end we want to work with the local Development Corporation; the Village Hall Committee and the Organisations that use the limited facilities available at present.

No supports
20221027_111318 (1).jpg

Complete our lifeline link road!

2025-06-02  •  No comments  •  Isle of Kerrera Development Trust  •  Regeneration Capital Grant Fund

In 2021 and 2022, IKDT secured funding to construst 1.79KM of brand new road connecting the North and South of the island. This project has been in the pipeline for many decades and has connected up the two different communities and is allowing our island to thrive as one. Just after we have secured the funding for the 2nd stage of the project, the tar topping, war broke out in Ukraine. Apart from the obvious humanitarian crisis, this had an instant impact on the price of all the raw materials required for surfacing. It meant we had to scale stage 2 back and make do with tarring the new built section of the road with a single layer of tar and leave approx 500 metres of road in an unbound, farm track state. Our plan for stage 2 had been to deliver 2 layers of tar over the new road (1.79km) and the 500m of existing road when we could petition the council to adopt the road as it connects up the existing council road to several council tax paying households. As it stands, while the road is in use and is hugely beneficial to life on the island however the maintenance burden on IKDT is not ideal. The council will not consider adoption until the road is brought up to the standard we had planned for stage 2 so we are hoping to complete the job. Adoption is key to the long term future of the road and indeed to whole community as it will allow unfettered access to all including vital services, emergency vehicles and access to the lifeline ferry service. The surfacing could be delivered in one week but the effects would be felt for generations to come. We would hope to continue the excellent working relationship with A&B Roads department to help deliver the best value for money possible.

No supports
Old forestry buildings

Creating a Cairnbaan Community Hub. Refurbishment of the old forestry buildings

2025-05-30  •  No comments  •  Cairnbaan Community Trust  •  Regeneration Capital Grant Fund

1. What we want to achieve.

The Cairnbaan Community Trust, (SC052905) wants to refurbish the forestry buildings to provide a community gathering point and flexible workshop and event spaces. We want a community hub that can be used by the community for education such as crafts and Gaelic, health e.g. yoga and other activities, recreation and social gatherings, inside and outside and temporary office space for local entrepreneurs.

Our priority is the smaller of the two buildings which will provide space for community events and workshops, social meeting space, hot desks and a community kitchen. There is external space that can be developed to provide a community garden and outside event space.  It is hoped in the future the larger of the two buildings can be developed to provide space for larger workshops and events.

We have divided the work into phases and we are currently seeking funding for phases 1 and 2. 

Phase 0: This covers the procurement of the forestry buildings under a community asset transfer funded by the Scottish Land Fund and we have secured initial funding for essential repairs to both buildings to make them safe and weatherproof.  The work will start when we take ownership on the 01/08/2025.

Phase 1: Is the refurbishment of the smaller building.  This phase will change the internal layout of the building to create flexible spaces.  This entails new partitions, doors, lighting and upgrade to the heating.  Additional facilities, external and internal, will be needed for disabled and users with special needs.  We also aim to fit a community kitchen and social space for coffee mornings.   Finally we need to replace windows and install new furnishings and fittings.

Phase 2: Is the landscaping and provision of a community garden and outdoor space.   

Phase 3: Is the refurbishment and fitting out of the larger building.  In this phase we also plan to look at energy efficiency improvements, e.g. heat pumps and solar panels.

2. Why our project is needed

Currently there is no community centre to provide a focal point or resources for the community.   There is a risk of social isolation amongst our older population and there are no facilities for the young people in our village.  Community cohesion is being eroded.

We commissioned a feasibility report through Community Enterprise which highlighted the following points. Accessing facilities is difficult without a car, the minimal bus service is a school service with no evening or Sunday services.  There are no shops, medical or other services in the village.  Despite scoring highly in other domains the area falls into the 10% most deprived areas in Scotland in terms of access to services in relation to the Scottish indices of multiple deprivation. Feedback from local people highlighted that a primary need in the community is an indoor social area and meeting space.

3. The positive changes our project will bring

Our vision is to reduce isolation, improve community life and reflect the cultural, environment and historic heritage of the area. The current priorities for the CCT are.

  • Bringing the community together to enable opportunities for social interaction and growth.
  • Advancement of arts, heritage, culture and science.
  • The provision and organization of recreational facilities to improve the quality of life for the community.
  • Improving the environment including education about the environment, culture and history.
  • The relief of thos in need either because of age, ill health, disability or financial hardship.

The refurbishment of the buidings will provide a focal point for the community and the resources to bring the community together especially those that feel isolated. It will provide resources for all ages across the community and give everyone opportunities for development and a sense of purpose and indentity.

Through current engagement with the local community we have already identified skills and volunteers that can contribute to the refurbishment which will foster community involvement from the outset

4. How long will our project run

Phase 1 and 2 of the project will start on: 05/01/2026

The project will run for: 15 months

Our Business plan and the Feasibility report are available on request.  Unfortunately the file size was too big to attach.

No supports
Photograph of the Rockfield Garden

Creating a Community Growing Space in Oban Town Centre

2025-06-02  •  No comments  •  Oban Communities Trust  •  Regeneration Capital Grant Fund

This project meets RCGF criteria: address vacant / derelict land as well as supporting locally developed, place-based regeneration projects that involve local communities, helping to tackle inequalities and improving the economic, social and physical environment of deprived, disadvantaged and fragile remote communities across Scotland. It is community led, and will result in strong regeneration outcomes.

The Rockfield Garden is leased and run by Oban Communities Trust, a Community Benefit Society run by and for its members and the wider community. 

We are transforming a disused, previously cultivated food production area into a vibrant and inclusive community growing space, but need funding to realise our vision. This project is rooted in a growing community movement: over the past year, more than 1,100 volunteer hours have been contributed at The Rockfield Garden. The momentum is clear—and this garden will be a living, growing symbol of community action.

The space, located behind The Rockfield Centre, was previously used to grow fruit, vegetables, and flowers for the former McTavish's Kitchens, but has since lain derelict.

What will your project do? Over the last 12 months a 25+ band of volunteers have spend over 1000 hours on Phase 1, preparing the space for cultivation. We are now seeking funding for Phase 2, which will initiate food production and support both experienced and novice growers, fostering strong community involvement.

  • Installing fencing and handrails to ensure safety and accessibility
  • Building raised beds and flexible growing spaces for communal and individual use
  • Constructing a weatherproof meeting shelter and a secure tool shed.
  • Providing tools, gardening equipment, seeds, compost, and plants.
  • Developing a community composting system to promote circular growing practices.
  • Installing bee hives, chicken coops, and a community orchard
  • Offering a varied programme of community engagement and educational growing activities, including informal social gardening drop-ins, volunteer action days, and community education.

Why is your project needed? Oban currently has no community growing provision, and local residents lack accessible opportunities to grow, learn, and contribute. As a rural town we are also heavily reliant on imported food, reducing local food resilience and creating disproportionately high food mile loadings. This project will:

  • Provide the community with growing space, tools, and support to grow food locally.
  • Encourage healthier lifestyles and increased social connection through shared, hands-on activity
  • Respond to the pressing need for increased food resilience in the face of climate change and supply chain vulnerabilities.
  • Help diversify the town’s food sources, reducing reliance on imported produce and associated transport emissions.
  • Create a learning hub to build knowledge and practical skills in sustainable food growing, composting, and ecological gardening
  • Offer a mix of communal and some individually managed plots, providing flexibility to suit different needs and abilities.
  • Enhance community cohesion and empowerment through participation, ownership, and shared outcomes.
  • Contribute to the Rockfield Centre's mission to reduce its carbon footprint and provide wholesome, healthy, affordable community meals.

What positive changes will your project bring about? The Rockfield Garden will deliver wide-ranging benefits across environmental, social, and educational areas:

  • Environmental Impact: With an estimated growing area of 1,400m², there is potential to produce 2,000–3,000kg of fruit and vegetables annually. This local production could reduce food miles and cut an estimated 3–4 tonnes of CO₂ emissions per year.
  • Food Resilience: In light of climate change and global food supply threats, local food production is a vital adaptation strategy. Growing food locally in Oban will contribute to community-level food security and resilience.
  • Health and Wellbeing: Access to growing spaces and outdoor activities supports mental and physical wellbeing. Gardening fosters regular physical activity, better nutrition, and emotional connection to nature.
  • Learning and Empowerment: Hands-on education will equip participants with valuable skills in food production, sustainability, and ecological stewardship.
  • Community Cohesion: The project will bring together people of all ages and backgrounds, strengthening social bonds, reducing isolation, and building a sense of place and purpose.
  • Sustainability: By incorporating composting and circular practices, such as seed saving, the garden will serve as a practical example of sustainable community living. By transforming this underused land into a thriving garden, we’re not just growing food—we’re growing community, resilience, and shared futures.

How long will your project run for? This is a long-term project that is ticking along in Phase 1, but requires substantial funding to move to Phase 2. Once funded, we anticipate c. 1 year to do the required structural works. We anticipate the total works requiring c. 70k, including staff time, but would gladly accept smaller amounts of funding which would allow us to complete the project in a modular fashion.

No supports
The petrol station in busier days.

Tighnabruaich Community Petrol Station - powering a fragile community

2025-05-31  •  No comments  •  Tighnabruaich District Development Trust  •  Regeneration Capital Grant Fund

The Problem

Our petrol station is threatened with closure due to retirement of the owners, and the business case for a commercial purchase is very weak. We are likely to end up with no fuel within 24 miles (and more for the isolated parts of our district). If people are forced to travel out of the area for fuel, they will tend to do all their shopping on the same trip, affecting other local shops and businesses . Carbon emissions will increase as people are forced to travel at least 48 miles round trip for fuel, over single-track mountain roads. Even running garden tools will become problematic, and our local Life Boat and volunteer Fire Service will have problems with adequate supply.

The Solution

This type of scenario is a perfect fit for a community enterprise response: improving the resilience and sustainability of the local area; providing opportunities for business and employment; and helping our community plan ahead for the switch to electric vehicles. We need a community-owned petrol station to secure fuel supplies in the area in the medium-term, install charging points, create business units for rent, and refurbish the historic building as a community transport and resilience hub. Having run two community consultations in the past two years we know that people will continue to need fuel for the next 10 - 15 years, that there is demand for workshop spaces for small businesses and that the petrol station building (a former Victorian pier house) has a high heritage value for the local community.

Opportunities

Since consulting on the community purchase of the petrol station, we have a had two direct approaches from potential workshop tenants. One local community group has a waiting list of small businesses looking for premises, so the creation of new work units would have a positive impact on the local economy. With joint support from the Scottish Land Fund we would be able to employ a Project and Transition Manager, tasked with delivering improvements to the building, installation of charging points and other renewables measures, managing the workshop spaces and developing our plans for electric community transport. We see many benefits arising from this project as well as securing a vital service.

Current Stage of Planning

We are about to apply to the Scottish Land Fund for support in meeting the purchase price and employing a part-time member of staff. Other funds will come from applications to charitable trusts and the Scottish Government, a community share issue and our own resources. We have a clear idea of the costs of the building refurbishment and the replacment of the fuel pumps with card payment models. Support to install charging points will be our other target for the early stages after our community purchase and there are several possible sources of funding.

Longer Term Goals

The move away from fossil fuels is envrionmentally and socially necessary. Climate change is driving a rise in the number of destructive weather events - Storm Eowyn resulted in a five-day power cut for the district. Our scattered population has a very high percentage of older people and the lack of power and communication was very concerning for them. In bringing the petrol station to community ownership we are not blind to the impact of carbon emissions and their effect on community resilience and environmental sustainability.

Although it may seem paradoxical, our purchase of the petrol station will help in lowering carbon emissions by removing the need for unnecessary journeys of around 50 miles. It will protect local services by keeping a point of sale in the area. It will make the district more secure in providing a storage space for emergency resilience supplies (like camping stoves and satellite phones to be used in future storms). It will allow us to install charging points and solar panels. It will bring a restoration of the adjoining pier into consideration as a tourist and leisure resource for swimming and boating. It will give us a site to base the community transport project that was viewed so favourably in our 2023 community survey. All of these achievable goals mean that the community buy-out will be benefiting the area long after the need to sell fossil fuels is gone.

No supports
Piles damage

Save Tobermory Fisherman’s Pier

2025-06-02  •  No comments  •  Tobermory Fishermans Pier Association  •  Regeneration Capital Grant Fund

1 What do we want to do?

Tobermory Fisherman's Pier Association intends to renovate and improve Thomas Telford's hisoric pier for the use of fishermen and other commercial users.  We would like to preserve the pier as a place that can be used and enjoyed by locals and visitors alike.  We want to open the pier to other commercial users and provide a solution to the risk of flooding caused by increasingly higher tides.  A structural engineers report has been commissioned and has provided a plan for remedial works.

2 Why is the project needed?

While the pier is a vital economic resource for the fishermen of North Mull, it is also an essential and integral part of Tobermory's built heritage.  Without the pier the fishermen would need to look for alternative space to store and repair gear.  They would have to use moorings or pontoons and they would have to use alternative means to land their catch.  All of these alternatives are costly, inconvenient and not as safe as the platform provided by the pier.

We have the support of the community and are backed by Mull Community Council, Tobermory Harbour Association and Mull and Iona Community Trust.

3  What positive changes will our project bring about?

The proposed improvements to the pier will provide a fit for purpose structure that will enable the fishing community, and other commercial users, to have confidence in the long-term viability of their businesses and provide the oppurtunity to support new entrants to the sector.  Securing the long-term future of the pier will enable it to remain at the heart of the community for centuries to come, bringing economic benefit to the town as a platform for the fishermen and also as part of what draws visitors to Tobermory.  It will continue to be a much loved hub for community celebrations and a valued civic space for locals and visitors to enjoy.

4  How long will our project run for?

The project will start in March 2026 and run for seven months.

Please refer to the attached PDF file for our more comprehensive proposal.

No supports
Youngster enjoying the ride.

"On your Bike", Tayinloan Youth Club

2025-04-29  •  No comments  •  Tayinloan Youth Club  •  Regeneration Capital Grant Fund

1. First and foremost, we want to keep our children safe while they enjoy being outdoors. The A83 runs the entire length of West Kintyre and as all the villages are spurs from this extremely fast and dangerous road, there is just nowhere safe for children to ride their bikes. To address this, we wish to install a pump track at Tayinloan

2. We feel it is needed because the main A83 is getting busier, and is one of the most dangerous roads in Scotland. Children and adults of all ages are now taking up more and more physical exercise and cycling has become very popular indeed.  We wish to offer a safe enclosed area where they can learn and ride in safety.

3. The project could bring many positive benefits.  Pump track riding not only provides a physical workout, but also promotes good mental well-being. It’s not just about the physical challenge – although that’s definitely a big part of the appeal. Spending time outdoors, surrounded by nature, has a way of melting away stress and lifting spirits. Pump track riding can actually help sharpen the mind and improve cognitive function. It is a way to encourage youngsters to leave their screens for a while and enjoy outdoor activities and social interaction.

These are just some of the positive changes for those participating in the sport. However there are many others, such as helping with social isolation which has become a big problem in these post Covid times.

At the pump track, generations come together, no matter their age! From little ones with their parents or grandparents to teenagers and young adults, everyone can enjoy fun and friendship, making it a true community hub. The little ones learn how to ride and gain confidence, while the more experienced riders practice their skills. Parents can have a great time too, as they watch their children gain confidence and make friends

4. Once the planning has been approved (hopefully within 6 months of application) and the funding secured, the pump track can be installed in 6 weeks.

We will work with Velosolutions, who are world leaders in this technology.

We will also liaise with schools and youth clubs.

We will work with Argyll and Bute Councillors

No supports
Community Village Hall/Community Hub

Clachan Village Hall/Community Hub Phoenix project

2025-06-02  •  No comments  •  Clachan Village Hall (Kintyre) SCIO SC050324  •  Regeneration Capital Grant Fund

Clachan lost its much loved and well used village hall due to terminal decline as an asbestos concrete roofed building with corroded portal flames and was demolished in 2022. The iconic historic B Lited Kilcalmonell church was purchased with a Scottish Land Fund grant to serve as a replacement village hall to arise like the proverbial phoenix from the ashes of the old hall. The hub will allow resumption of the dormant user group activities and will provide a recreational, educational venue for the comunity as well as a resource for private hire. It will also serve as an emergency centre to provide safe haven and meal provision at times of emergency such as has occured on many occasions over the past 10 years particualrly in relation to power cuts, village floods, a freak snow storm, and gales, some of which also resulted in blocking the A83 artery to Campbeltown. We are in the process of renovating the exisitng church building to provide the main comunal space and this work shold be completed by the end of the year.  This is being funded in part by are own fund raising initiatives and by local wind farm trust grants. We then need grant funding for the extension to provides the addtional space for : a catering/kitchen area, a small meeting room, additional storage and toilet provision with disabled access for larger capacity events and activities. It is is this extension project (phase 2) that we are seeking funding from the RCGF scheme as well as other agencies such as the Windfarm Trusts, and other grant funders. We are looking for this construction work to be done 2026-2027.

No supports
Tiree Rural Centre - the site for a new community-owned vet practice

Tiree & Coll Community Vet Practice Project

2025-05-30  •  No comments  •  Tiree Rural Development Ltd  •  Regeneration Capital Grant Fund

What do we want to do?

This project seeks to transform an existing community space at the Tiree Rural Centre – previously used as a café – into a community-owned vet practice serving the islands of Coll and Tiree. The Rural Centre hosts the island’s cattle and sheep market along with an exhibition showing all aspects of crofting and wildlife on Tiree. It plays a leading role in preserving Tiree’s rich crofting heritage and, together with its central location on the island, is well-placed to host a community vet practice. This represents a significant investment and regeneration project for both Tiree and Coll, and would contribute positively to local economies, which revolve around crofting.

This project is led by a consortium of island stakeholders which includes Tiree Rural Development (which manage the Rural Centre), Tiree Community Development Trust, various crofters and community representatives, and the current vet. This steering group provides strategic oversight and represents a community-led approach focused on safeguarding a key island service and a shared belief that something must be done before it is too late.

To that end, the Tiree Community Development Trust commissioned a feasibility study to investigate renovating the available, currently vacant space at the Rural Centre into a vet practice. With a full design and accurate costs now in place, the consortium are now in a position to commence a build phase of the project, and are actively seeking funding to make this important project a reality.

Why is our project needed?

A vet is absolutely critical to both Tiree and Coll. Without an island vet, crofting largely becomes untenable, as crofters need access to veterinary services to keep animals and ensure their welfare. Crucially, Tiree’s culture, history, economy, and its unique machair landscape are all strongly linked to crofting. In addition to running their crofts, crofters often hold multiple jobs and community roles, and are essential to island life. 

As crofting is the island’s primary industry, the loss of a vet would have dire consequences for the local economy. This would likely lead to emigration and a decline in the numbers of families living on the island. Even a few families leaving would have a significant impact on services, and could spark the further closure of lifeline services such as the school, GP surgery, and local businesses – a gradual process often seen in other small Scottish islands once the population falls below a critical point. Once these key services are lost, we know from experience and research that they rarely return. This is due to the high cost of running services on islands, the challenges of setting up, and the dwindling economic returns and economies of scale. Remote islands are places where market failure is the norm, not the exception. The group recognises that the vet practice is one such service that the island cannot afford to lose. 

Moreover, many residents keep small animals and pets; the operational and cost implications of relying on a mainland vet service for Tiree and Coll residents are significant, in some instances prohibitive. The vet also plays a central role in protecting the island’s unique wildlife and marine life, regularly attending call-outs to help stranded dolphins and seals, for example.

With our current vet looking to retire in the near future, we are keen to minimise barriers that an incoming vet faces. In the past, it has been difficult to recruit and retain vet capacity, and recent shortages in the sector, combined with a low financial return of investing in an island-based vet practice, have made this challenge more acute. Additionally, the current vet operates out of a small and temporary space which is unlikely to meet future RCVS standards and does not fully meet the dynamic needs of an island vet. A high-quality, affordable, and long-term practice ensures that the prospect of moving to Tiree to take over the practice becomes much more attractive and financially viable.

What positive changes will our project bring about?

This project provides key benefits to crofters and the wider community on both Tiree and Coll:

  • A bespoke, compliant, and modern vet practice will make it easier to attract an incoming vet to the island, and retain them once they have arrived.
  • It improves the standard of care and contributes positively to animal welfare, as well as providing a better space for a vet to operate out of.
  • Securing an appropriate practice space for Tiree and Coll safeguards the entire crofting sector, the island’s primary industry.
  • Security of tenure for the vet, as well as a stable rental income for a community group dedicated to improving conditions for crofters and wildlife on Tiree.
  • Making better use of existing assets, and optimising design to factor in environmental improvements.
  • Tiree and Coll pet owners are guaranteed access to veterinary care without having to rely on mainland services, which can be difficult and expensive to access – especially during emergencies.
  • The project contributes to the wider regeneration of Tiree’s existing community-owned assets, and will play a key role in Tiree Rural Centre’s future.
  • A lifeline island service is maintained, contributing to the overall viability of Tiree’s small, unique, and thriving community.

How long will our project run for?

The project will start on: 01/03/2026

The project will run for : 12 months

No supports
Screenshot 2025-05-08 134517.jpg

From Small Seeds - Cornabus Community Forest Initiative

2025-05-08  •  No comments  •  Islay Development Initiative  •  Regeneration Capital Grant Fund

   

IDI has set aside an initial 25 acres of Cornabus Community Forest to deliver housing, a Community Orchard, Garden and allotments for the community. 

In 2021 we carried out extensive consultation on the proposed development site within the now community owned Cornabus Forest. Formerly a commercial Sitka Spruce plantation, the whole site will eventually be replanted with native broadleaf to replicate the Atlantic Rainforest once prevalent on Islay, delivering significant biodiversity benefits but also on the community wish list from the consultation was housing for young people, allotments, an orchard and forest trails and a garden areas. 

The project will endeavour to add social and environmental value to the site and also create a space for community members and groups to enjoy. In 2020 Islay lost it's well-known community garden at Islay House, due to the property being sold on the open market. This was a much loved and used community space. Although the site at Cornabus is not a walled garden, extensive research on other forest garden initiatives was carried out in 2022 - including visits to Royal Botanical Society managed forests and formal garden spaces, such as Benmore and Puck's Glen. The intention is to take some elements of the old community garden site and duplicate them and the new, with lots of additional features.

The project is highly ambitious, and the first stage of funding has been secured from Inspiring Scotland for development of the tree nursery site where we will grow the replacement trees.  Secondary funding has come from Carbon Neutral Islands, specifically to create some of the infrastructure and assist with a circular economy approach to fuel wood supply on the island at affordable rates. 

This is a lifetime legacy project that will create a destination for outdoor enjoyment but also offer a range of solutions to the socio-economic challenges that the island faces with a strong focus on becoming Carbon Neutral. Islay is in a housing crisis and the addition of 10 affordable houses will help address some of those issues. To ease pressure on the Grid, the project also comes with it’s own district heating system using the remaining Sitka Spruce on site as a fuel source, a wind turbine and solar panels.  

The finished project will deliver a host of positive benefits including but not limited to:

  • Employment
  • Affordable Housing
  • Circular Economy approach/local fuel
  • Community garden
  • Allotments
  • Carbon capture in new tree planting
  • Significant destination space for locals and visitors alike.

The project will link into Argyll College, Islay High School, Youth Initiative and employability. Partners and funders will be Scottish Government – Rural and Islands Housing Fund, Argyll and Bute Council and National Lottery. Community group usage will be open to all groups on the island and will link into national networks such as Community Woodlands Association, Scottish Islands Federation and Community Tree Nursery Network.

 