2025-05-22 • No comments • • Regeneration Capital Grant Fund
MACPool Activity Hub is a local community hub settled within the rural area of Lochgilphead. We currently service the area of Mid Argyll, where the population is approximately 6,000 people. On an average week, we will provide services such as specialised swimming sessions, fitness classes and Learn to Swim lessons, where over 500 regular participants will attend the Activity Hub.
MACPool Activity Hub works closely with rural school with promoting Water Safety Sessions and scheduled blocks of weekly lessons to pupils. The main Learn to Swim program caters to more than 220 participants from a 25 mile radius on a weekly basis, with ages ranging from 4-75 years old.
We offer a range of programs designed to specialise in different needs such as our Toddler Time sessions to classes such as HyrdoMobility, a senior exercise class, focusing on water-based exercises to strengthen the core and increase stability.
In collaboration with RMFitness and the NHS Living Well Program, MACPool Activity Hub has been assisting with the rehabilitation within the senior community, providing a bespoke area to re-build confidence, both in and out of the water.
We also host Additional Support Needs (ASN) and Young Carer sessions in partnership with the Mid Argyll Youth Development Services (MAYDS), providing a safe space for those in the community who may not otherwise have access to such spaces.
In accordance with our sustainability principles, MACPool Activity Hub is a part of the Renewable Heating Incentive (RHI) scheme. Therefore, the Hub uses a biomass boiler that is fuelled by woodchips to produce the necessary heating for the swimming pool and hot water systems. MACPool Activity Hub is also a part of the Feed In Tariff (FIT) scheme and have over 100 solar panels, which generate renewable electricity.
During previous winters, however, the quality of the fuel source has declined, causing our boilers to malfunction. It is essential that our boilers remain fully operational to comply with regulations concerning water and air temperatures. When we do not meet these regulations, we are forced to close the pool, cancelling valuable swimming lessons, fitness classes and pre-programmed sessions, thus losing credibility and revenue.
Our vision is to expand on the foundations of what we have created so far, improving integral community bonds, while seeking other connections to become a cornerstone of the community. To sustain our efforts, we aim to secure funding for a secondary heating source and to upgrade the storage silo, to allow us to change over from woodchips to wood pellets. This will enable us to remain in the RHI scheme while continuing to develop our programs and timetable, while also fostering partnerships that align with the needs of the community.

Jura Community Sports Facility - Project Aspiration
2025-04-10 • No comments • • Regeneration Capital Grant Fund
The new sports facility will be suitable for all weather conditions and will enable the playing of various sports on the same surface, including five-a-side football, netball, basketball, and shinty practice.
The Jura Community Development Plan, produced by the Jura Development Trust, highlights the necessity for improved youth and recreational facilities on the Island and concludes that further investigation is required regarding the preferred nature of these facilities.
Developing community-owned and managed assets is strongly supported by national and local policy.

Lighting Up the Shore Station - a sustainable Hub for Tiree
2025-05-27 • No comments • • Regeneration Capital Grant Fund
1 We would like to refurbish Alan Stevenson House (ASH) to offer a locally inspired restaurant, bar with 6 ensuite rooms (1 disabled). We would like to upgrade the Harbour with pontoons and seating/viewpoints to take in the wonderful natural environment and encourage people to come by boat to the site in the summer months. Morton Boyd Hall (MBH) is an excellent multi purpose facility that just needs some upgrading and could complment any activities going on at the site. The site at Hynish, with its heritage and special quality of place, has the opportunity to develop its local hospitality and develop something of a Hub for the southern end of the island. Capturing tourism and events spend, alongside island/day visitor spend would provide a revenue stream.
2 The Skerryvore Shore Station was transferred to the Tiree community in January 25. The transition has taken 3 years. There are 3 income streams - Housing, Heritage and Business - that will ensure it is a sustainable community organisation going forward. We have been reviewing the use of our 20+ A listed buildings to ensure they are fit for purpose and revenue earning where possible. ASH was first rebuilt in 1990 as a hostel type accomodation for groups with special needs. it was only used for a few weeks in the summer months and was always a overhead for the charity. MBH had been used to house the exhibition/museum but originally had been rebuilt as a multi purpose hall. The harbour stands strong against the incredible tides and weather. It is a viewpoint for sealife and birds. The community when asked what they would like to see at the site in our survey and subsequent community events were clear that Business should be a priority. 84% said that they wanted a restaurant/cafe, quality accomodation and event space all year round. They also wanted the Harbour preserved. So our community mandate was clear. We have piloted the restaurant and rooms over the past 2 years and now believe that it could definately work if we had a good standard of accomodation to offer and a multi purpose space for events. We have moved the exhbition to another building to free up Morton Boyd Hall so that we have a this multi purpose facility. We will then be able to work with community groups to put on a variety of events and functions during the year. We will also be able to provide permanent employment for locals.
3 We can already see from our pilot that our community is very positive about the fact we have a local family working at ASH and have created year round employment for locals. We have trialled a number of community events over last winter and they proved to be very popular. The Tiree people just love the shore station and feel a strong sense of guardianship. The pilot has also showed us that we could have a reasonable income stream from this. We now have some facts and figures to base our projections on which gives us confidence this is the right way forward. All the buildings at Hynish need to work and complement each other to ensure the "place" is kept in alignment. The pilot has demonstrated that the restaurant/rooms/bar and events do contribute greatly to this. The project would enhance the employment opportunities; keep a family with 3 children living on Tiree as they have jobs; provide the much needed income stream to ensure sustainability; reduce running costs; make the buildings all more energy efficient and in line with our aim to lower the carbon footprint and provice a place for people and business to floutish.
4 The project will start early in 2026 and be completed by November 2026.
Unlocking Ulva: A Community Barge to Connect, Create and Thrive
2025-06-02 • No comments • • Regeneration Capital Grant Fund
North West Mull Community Woodland Company (NWMCWC) proposes to purchase and operate a community-owned barge to serve the Isle of Ulva. This transformative asset will unlock essential access for people, goods, vehicles, livestock, and materials - enabling regeneration, resilience, and economic growth on a fragile, remote island currently constrained by limited marine transport.
Ulva is a roadless island off the west coast of Mull, with no bridge and only a passenger ferry. The community is entirely reliant on the support of a local fish farm for occasional barge support - help that has been generous and invaluable over the last few years, though is naturally limited. This creates a significant barrier to regeneration, preventing progress on key projects and undermining the island’s long-term sustainability.
The barge will address this infrastructure gap and enable a range of community-led initiatives, including:
-
Heritage restoration, including the movement of scaffolding, stone, and tools to repair historic buildings like Ulva House or Telford-designed church, and other community buildings.
-
Sustainable land management, supporting crofting and farming by transporting livestock, feed, and agricultural supplies, as well as help with the removal of unused and broken equipment and machinery.
-
Resident-led business development, giving islanders the infrastructure needed to start and sustain their own small enterprises - enabling self-sufficiency and reducing dependence on external services.
-
Contractor and service access, allowing building and infrastructure work to proceed without excessive private transport costs.
-
Emergency resilience, offering an alternative logistics route in the event of ferry failure.
-
A community-led initiatives like Ulva Producers’ Market, connecting local growers, makers, and visitors in a shared island space.
-
Cultural and community events, such as pop-up exhibitions, and other events that require transporting bulky or heavy equipment.
As one resident said, "A community barge would secure the long-term future of the farm and ensure we’re no longer totally reliant on a third party to move livestock or machinery. It would also open up opportunities for diversification. On a personal level, it would create a more sustainable and flexible connection between Ulva and Mull—helping our community grow, thrive, and engage more with the wider community of north-west Mull.”
The barge will be community-owned, maintained by NWMCWC, and operated in partnership with residents and local businesses. It will have multiple uses and function flexibly, supporting both everyday needs and long-term community goals. Critically, it provides a foundation for further regeneration efforts, addressing a clear case of market failure and enabling transformational change.
The project will be ready to commence once capital funding is secured, with delivery anticipated over 12–18 months, including procurement, compliance, training, and launch.
.jpeg)
Strachur Community Men's Shed
2025-05-22 • No comments • • Regeneration Capital Grant Fund
Our primary aim is to build a safe social/recreational workshop and creative workspace for retired men & women to undertake creative projects for the village and local district. This should assist in improving the appearance of Strachur and surrounding area for the benefit of the local community and visitors e.g. by reconstituting picnic areas that have fallen into disrepair, also by maintaining benches; fences etc. such as those in our community Heron Park and installing sculpture/art works where agreed as appropriate. Similar maintenance and creative projects would be made available to the district with the involvement of people domiciled within a 10 mile radius. Existing craft and trade skills that 'Shed' members possess would be used to do this, hopefully enabling members to learn new skills as well. Other local organizations would also benefit e.g. the local Youth/Drama Group where members could assist in the manufacture of costumes and scenery for the regular annual productions at reduced cost.
Like many small rural villages Strachur has an increasing population of retirees. We hope that involvement in local projects - through teamwork - would help in reducing feelings of isolation for the 'older' members of our community by providing mental and physical stimulation, thus showing the 'younger' members of our community that we still have something to contribute to village life whilst improving recreational facilities for all. This approach should enable the facility to be sustained for many years as people become aware of the projects we are involved in. The provision of workshop facilities should also benefit the village Memorial Hall by providing support for maintenance and supplementing the facilities available in the centre of the village. To this end we want to work with the local Development Corporation; the Village Hall Committee and the Organisations that use the limited facilities available at present.

Creating a Community Growing Space in Oban Town Centre
2025-06-02 • No comments • • Regeneration Capital Grant Fund
This project meets RCGF criteria: address vacant / derelict land as well as supporting locally developed, place-based regeneration projects that involve local communities, helping to tackle inequalities and improving the economic, social and physical environment of deprived, disadvantaged and fragile remote communities across Scotland. It is community led, and will result in strong regeneration outcomes.
The Rockfield Garden is leased and run by Oban Communities Trust, a Community Benefit Society run by and for its members and the wider community.
We are transforming a disused, previously cultivated food production area into a vibrant and inclusive community growing space, but need funding to realise our vision. This project is rooted in a growing community movement: over the past year, more than 1,100 volunteer hours have been contributed at The Rockfield Garden. The momentum is clear—and this garden will be a living, growing symbol of community action.
The space, located behind The Rockfield Centre, was previously used to grow fruit, vegetables, and flowers for the former McTavish's Kitchens, but has since lain derelict.
What will your project do? Over the last 12 months a 25+ band of volunteers have spend over 1000 hours on Phase 1, preparing the space for cultivation. We are now seeking funding for Phase 2, which will initiate food production and support both experienced and novice growers, fostering strong community involvement.
- Installing fencing and handrails to ensure safety and accessibility
- Building raised beds and flexible growing spaces for communal and individual use
- Constructing a weatherproof meeting shelter and a secure tool shed.
- Providing tools, gardening equipment, seeds, compost, and plants.
- Developing a community composting system to promote circular growing practices.
- Installing bee hives, chicken coops, and a community orchard
- Offering a varied programme of community engagement and educational growing activities, including informal social gardening drop-ins, volunteer action days, and community education.
Why is your project needed? Oban currently has no community growing provision, and local residents lack accessible opportunities to grow, learn, and contribute. As a rural town we are also heavily reliant on imported food, reducing local food resilience and creating disproportionately high food mile loadings. This project will:
- Provide the community with growing space, tools, and support to grow food locally.
- Encourage healthier lifestyles and increased social connection through shared, hands-on activity
- Respond to the pressing need for increased food resilience in the face of climate change and supply chain vulnerabilities.
- Help diversify the town’s food sources, reducing reliance on imported produce and associated transport emissions.
- Create a learning hub to build knowledge and practical skills in sustainable food growing, composting, and ecological gardening
- Offer a mix of communal and some individually managed plots, providing flexibility to suit different needs and abilities.
- Enhance community cohesion and empowerment through participation, ownership, and shared outcomes.
- Contribute to the Rockfield Centre's mission to reduce its carbon footprint and provide wholesome, healthy, affordable community meals.
What positive changes will your project bring about? The Rockfield Garden will deliver wide-ranging benefits across environmental, social, and educational areas:
- Environmental Impact: With an estimated growing area of 1,400m², there is potential to produce 2,000–3,000kg of fruit and vegetables annually. This local production could reduce food miles and cut an estimated 3–4 tonnes of CO₂ emissions per year.
- Food Resilience: In light of climate change and global food supply threats, local food production is a vital adaptation strategy. Growing food locally in Oban will contribute to community-level food security and resilience.
- Health and Wellbeing: Access to growing spaces and outdoor activities supports mental and physical wellbeing. Gardening fosters regular physical activity, better nutrition, and emotional connection to nature.
- Learning and Empowerment: Hands-on education will equip participants with valuable skills in food production, sustainability, and ecological stewardship.
- Community Cohesion: The project will bring together people of all ages and backgrounds, strengthening social bonds, reducing isolation, and building a sense of place and purpose.
- Sustainability: By incorporating composting and circular practices, such as seed saving, the garden will serve as a practical example of sustainable community living. By transforming this underused land into a thriving garden, we’re not just growing food—we’re growing community, resilience, and shared futures.
How long will your project run for? This is a long-term project that is ticking along in Phase 1, but requires substantial funding to move to Phase 2. Once funded, we anticipate c. 1 year to do the required structural works. We anticipate the total works requiring c. 70k, including staff time, but would gladly accept smaller amounts of funding which would allow us to complete the project in a modular fashion.

Lorn and Oban Reuse Initiative - Renewals and Expansion Project
2025-05-30 • 1 comment • • Regeneration Capital Grant Fund
What we want to do - Lorn and Oban Reuse Initiative (LORI) is our long-standing furniture reuse project based in Oban, serving communities for over 15 years. The project, which aims to achieve a Zero Waste society, diverts furniture, household goods and electricals etc. into reuse and before [these] unwanted items enter the waste hierarchy. In the last 12 months, LORI has supported over 11500 customers including businesses, individuals and families. Those in poverty and personal crisis, those displaced by war in Ukraine and communities challenged by the ongoing cost of living crisis. “Such a fantastic way to reduce wasting perfectly good products. Furniture is top quality and the staff I met were friendly, welcoming and incredibly helpful.” CustomerThis is an exciting period for our charity, as we are planning a major expansion of our work to enable us to better support the growing number of people who come to us for help. Our plans are well advanced including planning consent and building warrant for the proposed improvements and renewals to increase available floor space to meet the growing demand for reuse goods. GRAB has set aside reserves to contribute to the cost of these improvements.Under this grant we propose to move forward rapidly with the project. Available match funding already secured will support project management and admin resources and back LORI during any disruption to trade while improvements take place. Under this grant, captal funds will be deployed to prepare groundworks and the foundations to accommodate new modular buildings, the purchase of new buildings to replace derelict and delapidated units and much-needed welfare facilities. And extensive refurbishment to an existing building. Why the project is needed - In Argyll and Bute, landfill accounts for around half of the Council’s annual production of Carbon Dioxide equivalent emissions (CO2e). (Source: Argyll and Bute Council Decarbonisation Plan 2021). Positive changes will the project bring about - Planet – Tackling the climate emergency, LORI reduces landfill; 45% of greenhouse gases come from products we use and purchase. Saving valuable resources from landfill, LORI reduces the communities’ carbon footprint and cuts emissions. In Oban and Lorn approx. 858 tonnes of Municipal Solid Waste is produced each year. Currently just over 10% or 86 tonnes is diverted through reuse by The GRAB Trust. People – supporting local people and creating jobs, LORI supports communities to utilise existing resources, LORI has steadily increased volumes diverted from landfill each year; diverting over 450 tonnes from landfill in the last 8 years. The initiative sustains 7 jobs and 12 regular volunteers. Pounds – Strengthening the circular economy we offer low cost, high quality furniture and homewares to everyone as a sustainable, low cost alternative to buying new. LORI supports the Circular Economy by keeping existing resources in use for longer and our not-for-profit community enterprise now recirculates over £120,000 in our communities annually. Reducing the tax burden, LORI decreases landfill tax, saving local taxpayers over £8,000 annually. Place – engaging and empowering communities LORI is a place where ideas flourish. We support community groups and partners in the third sector. We help businesses like cafes, hotels and Air B&B furnish their premises. We help communities to share and to learn new skills; reusing and repairing is a creative way to try new things, gain useful skills, appreciate what we already have and find new uses to make the most of it. GRAB is part of Circular Communities Scotland Share and Repair Network and LORI is a source for tools for makers and craftsmen - keeping traditions alive.Our renewals project at LORI will ensure communities are supported for years to come - increase available floorspace by 80%, introduce welfare facilities for staff and volunteers and extend product lines – the new provision of running water at the site will open up the possibility of testing white goods (washing machines & dishwashers) for example. With increased floorspace LORI will better serve the growing demand for reuse, further reduce landfill and offer increased support to the circular economy in Oban and Lorn.
.png)
Creating a Safe, Accessible, Multi-Purpose Gathering Space in the Heart of Oban
2025-06-02 • No comments • • Regeneration Capital Grant Fund
This proposal meets RCGF criteria: supporting locally developed, place-based regeneration projects that involve local communities, helping to tackle inequalities and improving the economic, social and physical environment of deprived, disadvantaged and fragile remote communities across Scotland. It is community led, addresses market failure (inadequate parking and outdoor event space) and will result in strong regeneration outcomes.
The Rockfield Centre is owned and run by Oban Communities Trust, a Community Benefit Society run by and for its members and the wider community. It sits within c. 2000 m2 of old playpark, currently used as a car park
What will your project do? The project will re-surface the existing outdoor space surrounding The Rockfield Centre, resulting in a safe, smooth surfaced area which can be used to bring the community together through large-scale outdoor events, create economic additionality by unlocking new potential for town centre events, and contribute to ongoing town-centre carparking demand.
Why is your project needed? In the recent past, The Rockfield Centre's outdoor space has been used for a range of outdoor events from the Clipper food and drink village (July 2024) and the centre's Spring Festival (June 2025), whilst day-to-day it contributes ~ 50 spaces to the town centre parking supply - a critical resource during peak season. However, the space is badly in need of resurfacing, both to ensure its future as a carparking resource and to enable its use as a safe and accessible community gathering space.
What positive changes will your project bring about? We belive that this project will unlock huge potential for outdoor events within Oban town centre, with benefits for business, local charities, and the wider community. Our strategic planning has identified a need within the Oban town centre area for a flexible and adaptable outdoor space that can be used by community groups for a wide range of activities - including markets, concerts, festivals, and outdoor theatre. Our outdoor space is the ideal location for holding these events as it is enclosed, easy to secure, and removes the need for disruptive and costly road closures which would be highly advantageous in a town which regularly experiences traffic flow issues and can struggle with capacity at peak times. We believe that Oban and the wider community will benefit from this project as it will open up opportunities which have otherwise not been considered, as there is no alternative suitable town centre area that can offer these facilities. This project will allow these opportunities to be fully explored and realised. The Rockfield Centre is strategically placed at the heart of the town, and is open to all. We have a track record of successfully delivering exciting, inclusive, and novel community-focussed events alongside large contracted projects, and are fully commited to working collabaratively and building strength through partnerships.
How long will your project run for? Once funding is in place, the works could be completed quickly with actual disruption to the space kept to 2-3 weeks. We estimate the cost to be £60k (based on quotes obtained in summer 2024). We aim to have this work completed by the end of 2025.

Redevelopment of Tayvallich Community Hall
2025-05-28 • No comments • • Regeneration Capital Grant Fund
What we want to do -
Phase 1 involves replacing the hall disabled access and the provision of a generator to enhance community resilience.
Phase 2 re-configuring the toilet block and the provision of hot water in the ladies toilets.
Phase 3 - installing a decking, and two patio doors to enhance provision for events. Also creation of more storage.
Why our project is needed.
The hall is used by the local primary school for provision of sports facilities and other activities. The Parent Council arranges parties and other communal events - such as an annual car wash and wreath-making at Christmas. The hall provides many family events, shows, films and talks - to keep the local community informed and entertained. A seperate gym club runs on a wednesday. The multi-sport court provides for sporting activities such as hockey and tennis, and the playing field is used for football and field sports.
Many tourists use the hall's facilities especially for events such as "Gala day", and tourism is an important industry in Scotland. The hall was instrumental in the creation of Tayvallich Initiative which aims to provide low-cost housing in the village for essential workers and implements "rural burdens" which help ensure community survival longer-term. The annual Kayak Symposium run by local firm "Argyll Kayaks", brings dozens to the village for a weekend, centered around the hall, which benefits the whole community including the community shop and the Inn.
"Resilience Planning" is a recent aim of the Community Hall. A few months back there was a power outage for 4 days - many were caught out by it. Apart from losing heating and cooking, many have private water supplies (pumped) and so had no water either. The hall did its best as a "resilience hub" but had no electric itself - simply brewing hot drinks on a gas stove - it could not offer shelter/heating/lighting/hot food. Resilience planning involves a back-up generator to better serve the community in such future events.
The hall provides many services to the local community. Yoga on a monday and thursday; table tennis on a monday; bowls on a thursday; "Pickle ball" on a tuesday; "stretch and tone" on a tuesday; Fencing on a wednesday; Lunch Club every month - providing for the retired members of our community. The hall also hosts First Aid classes which benefit the local community and beyond.
The hall is also a popular venue for weddings (and funerals). There are regular Coffee Mornings in aid of a range of charities - Beatson cancer charity; the Lochgilphead Snowdrop Centre; and the Taynish run in aid of McMillan cancer care. The annual flower show is also a popular event. In addition, the hall hosts events such as Films and Talks - often being full to capacity. Friday and saturday evenings often see the hall host Bands and Ceilidhs which attract visitors from further afield. It encourages and supports local artists and musicians.
The project will bring about many positive changes.
It is essential that the hall can continue to act as a community hub. Phase 1 - the generator - will ensure it can run as a resilience hub too. Phase 1 also includes better disabled access which is essential. Provision of better toilet facilities is also essential (Phase 2), given the hall's popularity. Phase 3 will increase the capacity of the hall - even more community activities will be encouraged and supported.
The hall is a vital community resource and needs to be supported and protected. The success of the community hall helps kindle social cohesion - it is a vital part of village life.
The project will start in July 2025 and take 6 months to complete.

Oban Lorne RFC's Community Sports & Events Hub (Phase 1-2)
2025-05-21 • No comments • • Regeneration Capital Grant Fund
1. What do you want to do?
We aim to develop the Oban Sports & Events Hub—a modern, inclusive facility featuring a multi-sport clubhouse, floodlit pitches, gym, running track, and event spaces. This hub will serve as a central venue for sports, cultural events, and community gatherings, enhancing opportunities for physical activity and social engagement in Oban and the surrounding areas.
2. Why is your project needed?
Oban's existing sports infrastructure is outdated and lacks accessibility, limiting opportunities for participation in sports and community events. The current facilities do not meet the needs of the growing population, particularly youth and individuals with disabilities. By providing modern, accessible facilities, the Oban Sports & Events Hub will address these gaps, promoting inclusivity and community well-being.
3. What positive changes will your project bring about?
The hub will:
-
Enhance Health and Well-being: Provide facilities that encourage physical activity across all age groups.
-
Promote Inclusivity: Ensure accessible design for individuals with disabilities.
-
Support Youth Development: Offer programs and spaces dedicated to youth engagement.
-
Boost Local Economy: Attract events and visitors, supporting local businesses.
-
Foster Community Cohesion: Serve as a gathering place for diverse community groups.
4. How long will your project run for?
The project is planned over multiple phases and is subject to funding and lease agreements. The project has been designed to be flexible but includes:
-
Phase 1 (2025–mid 2026): Construction of the clubhouse, installation of floodlights, and development of the main pitch.
-
Phase 2 (mid–late 2026): Addition of a running track and 4G area.
-
Phase 3–4 (2027): Redevelopment of the bottom pitch and support of potential construction of the skate park.
-
Phases 5–8 (2028–2032): Expansion to include additional facilities and infrastructure improvements.
Partnerships:
We plan to collaborate with:
-
Local Sports Clubs: Oban Lorne RFC, Oban Saints FC, Oban Camanachd, and others.
-
Educational Institutions: Local schools and youth organisations, including the school hostel.
-
Community Groups: Oban Community Skate Park Committee and cultural organisations.
-
Local Businesses & Charities: Atlantis Leisure, Adventure Oban, Happy Wee Health Club.
-
Local Authorities: Argyll and Bute Council for planning and support.
-
National Event Organisers
These partnerships will ensure the hub meets the diverse needs of the community and operates sustainably.