Sonas Childcare Project

2025-05-26  •  No comments  •  South Islay Development  •  Regeneration Capital Grant Fund

SID plans to build a dedicated childcare facility to cater for babies and toddlers up to three years old and provide dedicated childcare services for the community. This building will complement the soon to be finished new community Pavilion, and will be set within the 16 acres of Playing Fields, with access to a nearby enclosed playpark, and plenty of green space. 

On Islay there are a very limited number of childminders available. Islay has had a steady number of babies born in the last three years (ranging from 20-22 babies/year) and this is predicted to rise. Due to the lack of services available, families are using relatives and friends as childminders to allow them to return to work. The provision of a dedicated childcare facility would provide flexibility with this.

The facility will bring the following positive changes: 

  • More flexibility for families with regards to 0 to 3 childcare options.
  • More opportunities for families to work childcare around their needs, enabling parents to return to work. 
  • Families may be encouraged to move to Islay, as instead of having severely limited childcare options there will be a dedicated facility. 
  • It will provide options for employment and training within the facility. It may help provide an opportunity for students and school leavers to gain work experience in their chosen field, without having to leave Islay. 

It is anticipated that it will be several years before the facility is up and running. The project is currently in the early stages. A Planning Application has been submitted to Argyll & Bute Council, and the Building Warrant has been completed as far as possible, given the current funding restrictions. SID are currently looking for funding to finalise the Building Warrant, and move on to the construction phases. 

No supports
Community Village Hall/Community Hub

Clachan Village Hall/Community Hub Phoenix project

2025-06-02  •  No comments  •  Clachan Village Hall (Kintyre) SCIO SC050324  •  Regeneration Capital Grant Fund

Clachan lost its much loved and well used village hall due to terminal decline as an asbestos concrete roofed building with corroded portal flames and was demolished in 2022. The iconic historic B Lited Kilcalmonell church was purchased with a Scottish Land Fund grant to serve as a replacement village hall to arise like the proverbial phoenix from the ashes of the old hall. The hub will allow resumption of the dormant user group activities and will provide a recreational, educational venue for the comunity as well as a resource for private hire. It will also serve as an emergency centre to provide safe haven and meal provision at times of emergency such as has occured on many occasions over the past 10 years particualrly in relation to power cuts, village floods, a freak snow storm, and gales, some of which also resulted in blocking the A83 artery to Campbeltown. We are in the process of renovating the exisitng church building to provide the main comunal space and this work shold be completed by the end of the year.  This is being funded in part by are own fund raising initiatives and by local wind farm trust grants. We then need grant funding for the extension to provides the addtional space for : a catering/kitchen area, a small meeting room, additional storage and toilet provision with disabled access for larger capacity events and activities. It is is this extension project (phase 2) that we are seeking funding from the RCGF scheme as well as other agencies such as the Windfarm Trusts, and other grant funders. We are looking for this construction work to be done 2026-2027.

No supports
Old forestry buildings

Creating a Cairnbaan Community Hub. Refurbishment of the old forestry buildings

2025-05-30  •  No comments  •  Cairnbaan Community Trust  •  Regeneration Capital Grant Fund

1. What we want to achieve.

The Cairnbaan Community Trust, (SC052905) wants to refurbish the forestry buildings to provide a community gathering point and flexible workshop and event spaces. We want a community hub that can be used by the community for education such as crafts and Gaelic, health e.g. yoga and other activities, recreation and social gatherings, inside and outside and temporary office space for local entrepreneurs.

Our priority is the smaller of the two buildings which will provide space for community events and workshops, social meeting space, hot desks and a community kitchen. There is external space that can be developed to provide a community garden and outside event space.  It is hoped in the future the larger of the two buildings can be developed to provide space for larger workshops and events.

We have divided the work into phases and we are currently seeking funding for phases 1 and 2. 

Phase 0: This covers the procurement of the forestry buildings under a community asset transfer funded by the Scottish Land Fund and we have secured initial funding for essential repairs to both buildings to make them safe and weatherproof.  The work will start when we take ownership on the 01/08/2025.

Phase 1: Is the refurbishment of the smaller building.  This phase will change the internal layout of the building to create flexible spaces.  This entails new partitions, doors, lighting and upgrade to the heating.  Additional facilities, external and internal, will be needed for disabled and users with special needs.  We also aim to fit a community kitchen and social space for coffee mornings.   Finally we need to replace windows and install new furnishings and fittings.

Phase 2: Is the landscaping and provision of a community garden and outdoor space.   

Phase 3: Is the refurbishment and fitting out of the larger building.  In this phase we also plan to look at energy efficiency improvements, e.g. heat pumps and solar panels.

2. Why our project is needed

Currently there is no community centre to provide a focal point or resources for the community.   There is a risk of social isolation amongst our older population and there are no facilities for the young people in our village.  Community cohesion is being eroded.

We commissioned a feasibility report through Community Enterprise which highlighted the following points. Accessing facilities is difficult without a car, the minimal bus service is a school service with no evening or Sunday services.  There are no shops, medical or other services in the village.  Despite scoring highly in other domains the area falls into the 10% most deprived areas in Scotland in terms of access to services in relation to the Scottish indices of multiple deprivation. Feedback from local people highlighted that a primary need in the community is an indoor social area and meeting space.

3. The positive changes our project will bring

Our vision is to reduce isolation, improve community life and reflect the cultural, environment and historic heritage of the area. The current priorities for the CCT are.

  • Bringing the community together to enable opportunities for social interaction and growth.
  • Advancement of arts, heritage, culture and science.
  • The provision and organization of recreational facilities to improve the quality of life for the community.
  • Improving the environment including education about the environment, culture and history.
  • The relief of thos in need either because of age, ill health, disability or financial hardship.

The refurbishment of the buidings will provide a focal point for the community and the resources to bring the community together especially those that feel isolated. It will provide resources for all ages across the community and give everyone opportunities for development and a sense of purpose and indentity.

Through current engagement with the local community we have already identified skills and volunteers that can contribute to the refurbishment which will foster community involvement from the outset

4. How long will our project run

Phase 1 and 2 of the project will start on: 05/01/2026

The project will run for: 15 months

Our Business plan and the Feasibility report are available on request.  Unfortunately the file size was too big to attach.

No supports
Screenshot 2025-04-10 at 12.20.39.png

Jura Community Sports Facility - Project Aspiration

2025-04-10  •  No comments  •  Jura Community Enterprise (formerly Jura MUGA)  •  Regeneration Capital Grant Fund

The new sports facility will be suitable for all weather conditions and will enable the playing of various sports on the same surface, including five-a-side football, netball, basketball, and shinty practice.

The Jura Community Development Plan, produced by the Jura Development Trust, highlights the necessity for improved youth and recreational facilities on the Island and concludes that further investigation is required regarding the preferred nature of these facilities.

Developing community-owned and managed assets is strongly supported by national and local policy.

No supports
20221027_111318 (1).jpg

Complete our lifeline link road!

2025-06-02  •  No comments  •  Isle of Kerrera Development Trust  •  Regeneration Capital Grant Fund

In 2021 and 2022, IKDT secured funding to construst 1.79KM of brand new road connecting the North and South of the island. This project has been in the pipeline for many decades and has connected up the two different communities and is allowing our island to thrive as one. Just after we have secured the funding for the 2nd stage of the project, the tar topping, war broke out in Ukraine. Apart from the obvious humanitarian crisis, this had an instant impact on the price of all the raw materials required for surfacing. It meant we had to scale stage 2 back and make do with tarring the new built section of the road with a single layer of tar and leave approx 500 metres of road in an unbound, farm track state. Our plan for stage 2 had been to deliver 2 layers of tar over the new road (1.79km) and the 500m of existing road when we could petition the council to adopt the road as it connects up the existing council road to several council tax paying households. As it stands, while the road is in use and is hugely beneficial to life on the island however the maintenance burden on IKDT is not ideal. The council will not consider adoption until the road is brought up to the standard we had planned for stage 2 so we are hoping to complete the job. Adoption is key to the long term future of the road and indeed to whole community as it will allow unfettered access to all including vital services, emergency vehicles and access to the lifeline ferry service. The surfacing could be delivered in one week but the effects would be felt for generations to come. We would hope to continue the excellent working relationship with A&B Roads department to help deliver the best value for money possible.

No supports
Photograph of the Rockfield Garden

Creating a Community Growing Space in Oban Town Centre

2025-06-02  •  No comments  •  Oban Communities Trust  •  Regeneration Capital Grant Fund

This project meets RCGF criteria: address vacant / derelict land as well as supporting locally developed, place-based regeneration projects that involve local communities, helping to tackle inequalities and improving the economic, social and physical environment of deprived, disadvantaged and fragile remote communities across Scotland. It is community led, and will result in strong regeneration outcomes.

The Rockfield Garden is leased and run by Oban Communities Trust, a Community Benefit Society run by and for its members and the wider community. 

We are transforming a disused, previously cultivated food production area into a vibrant and inclusive community growing space, but need funding to realise our vision. This project is rooted in a growing community movement: over the past year, more than 1,100 volunteer hours have been contributed at The Rockfield Garden. The momentum is clear—and this garden will be a living, growing symbol of community action.

The space, located behind The Rockfield Centre, was previously used to grow fruit, vegetables, and flowers for the former McTavish's Kitchens, but has since lain derelict.

What will your project do? Over the last 12 months a 25+ band of volunteers have spend over 1000 hours on Phase 1, preparing the space for cultivation. We are now seeking funding for Phase 2, which will initiate food production and support both experienced and novice growers, fostering strong community involvement.

  • Installing fencing and handrails to ensure safety and accessibility
  • Building raised beds and flexible growing spaces for communal and individual use
  • Constructing a weatherproof meeting shelter and a secure tool shed.
  • Providing tools, gardening equipment, seeds, compost, and plants.
  • Developing a community composting system to promote circular growing practices.
  • Installing bee hives, chicken coops, and a community orchard
  • Offering a varied programme of community engagement and educational growing activities, including informal social gardening drop-ins, volunteer action days, and community education.

Why is your project needed? Oban currently has no community growing provision, and local residents lack accessible opportunities to grow, learn, and contribute. As a rural town we are also heavily reliant on imported food, reducing local food resilience and creating disproportionately high food mile loadings. This project will:

  • Provide the community with growing space, tools, and support to grow food locally.
  • Encourage healthier lifestyles and increased social connection through shared, hands-on activity
  • Respond to the pressing need for increased food resilience in the face of climate change and supply chain vulnerabilities.
  • Help diversify the town’s food sources, reducing reliance on imported produce and associated transport emissions.
  • Create a learning hub to build knowledge and practical skills in sustainable food growing, composting, and ecological gardening
  • Offer a mix of communal and some individually managed plots, providing flexibility to suit different needs and abilities.
  • Enhance community cohesion and empowerment through participation, ownership, and shared outcomes.
  • Contribute to the Rockfield Centre's mission to reduce its carbon footprint and provide wholesome, healthy, affordable community meals.

What positive changes will your project bring about? The Rockfield Garden will deliver wide-ranging benefits across environmental, social, and educational areas:

  • Environmental Impact: With an estimated growing area of 1,400m², there is potential to produce 2,000–3,000kg of fruit and vegetables annually. This local production could reduce food miles and cut an estimated 3–4 tonnes of CO₂ emissions per year.
  • Food Resilience: In light of climate change and global food supply threats, local food production is a vital adaptation strategy. Growing food locally in Oban will contribute to community-level food security and resilience.
  • Health and Wellbeing: Access to growing spaces and outdoor activities supports mental and physical wellbeing. Gardening fosters regular physical activity, better nutrition, and emotional connection to nature.
  • Learning and Empowerment: Hands-on education will equip participants with valuable skills in food production, sustainability, and ecological stewardship.
  • Community Cohesion: The project will bring together people of all ages and backgrounds, strengthening social bonds, reducing isolation, and building a sense of place and purpose.
  • Sustainability: By incorporating composting and circular practices, such as seed saving, the garden will serve as a practical example of sustainable community living. By transforming this underused land into a thriving garden, we’re not just growing food—we’re growing community, resilience, and shared futures.

How long will your project run for? This is a long-term project that is ticking along in Phase 1, but requires substantial funding to move to Phase 2. Once funded, we anticipate c. 1 year to do the required structural works. We anticipate the total works requiring c. 70k, including staff time, but would gladly accept smaller amounts of funding which would allow us to complete the project in a modular fashion.

No supports
DCDT Dunoon Pier Working Group.png

Dunoon Pier

2025-03-26  •  No comments  •  Dunoon Community Development Trust  •  Regeneration Capital Grant Fund

Operating under the governance of the Dunoon Community Development Trust and in partnership with Argyll and Bute Council, the Save the Pier working group has been actively seeking funding and carrying out further research to progress the necessary technical studies needed to inform these types of developments.

The initial goal of the working group is to develop a robust, evidence-based feasibility study, providing a clear case for the pier’s redevelopment and its potential role within the future of the town’s wider marine infrastructure. Longer-term they hope to begin the process of the pier’s renovation.

The wider team —comprising volunteers with expertise in public sector infrastructure, finance, heritage preservation, project development and community engagement —has been engaging with stakeholders in the public and private sector, having discussions with potential funders, and laying the groundwork to ensure any future redevelopment is viable and sustainable.

Our Progress So Far

The project has involved extensive positive collaboration with Argyll and Bute Council, alongside wider stakeholder consultations, a public petition, and collaboration with advisors in major infrastructure, heritage conservation, and funding options.

Community Involvement

Community engagement will be essential to shaping the pier’s future. There has consistently been a lot of interest on social media and in the newspaper with large numbers of people getting behind the idea of Dunoon Pier being regenerated. It is clear that there is good community support for the idea and the working group welcomes the input of local residents, businesses, and local organisations as the project evolves.

At this stage, the focus is on gathering the necessary technical and financial evidence to determine what is achievable.

Next Steps

Funding is currently being secured to complete a feasibility study, which will provide a comprehensive assessment of the pier’s future potential. This study will form the foundation for securing funding to progress any future redevelopment. However, given the scale of the project, careful planning and a phased approach is required. We aim to complete this initial phase and be in a position to share the feasibility study by Summer 2025.

Looking Ahead

Public infrastructure projects of this scale take time, but the dedication of the team working with the support of the local authority and Dunoon Community Development Trust means that there is a good chance that this project will progress positively. The Dunoon Pier working group is committed to communicating on their progress and will provide regular updates via Dunoon Community Development Trust and partners as the project moves forward.

No supports
Piles damage

Save Tobermory Fisherman’s Pier

2025-06-02  •  No comments  •  Tobermory Fishermans Pier Association  •  Regeneration Capital Grant Fund

1 What do we want to do?

Tobermory Fisherman's Pier Association intends to renovate and improve Thomas Telford's hisoric pier for the use of fishermen and other commercial users.  We would like to preserve the pier as a place that can be used and enjoyed by locals and visitors alike.  We want to open the pier to other commercial users and provide a solution to the risk of flooding caused by increasingly higher tides.  A structural engineers report has been commissioned and has provided a plan for remedial works.

2 Why is the project needed?

While the pier is a vital economic resource for the fishermen of North Mull, it is also an essential and integral part of Tobermory's built heritage.  Without the pier the fishermen would need to look for alternative space to store and repair gear.  They would have to use moorings or pontoons and they would have to use alternative means to land their catch.  All of these alternatives are costly, inconvenient and not as safe as the platform provided by the pier.

We have the support of the community and are backed by Mull Community Council, Tobermory Harbour Association and Mull and Iona Community Trust.

3  What positive changes will our project bring about?

The proposed improvements to the pier will provide a fit for purpose structure that will enable the fishing community, and other commercial users, to have confidence in the long-term viability of their businesses and provide the oppurtunity to support new entrants to the sector.  Securing the long-term future of the pier will enable it to remain at the heart of the community for centuries to come, bringing economic benefit to the town as a platform for the fishermen and also as part of what draws visitors to Tobermory.  It will continue to be a much loved hub for community celebrations and a valued civic space for locals and visitors to enjoy.

4  How long will our project run for?

The project will start in March 2026 and run for seven months.

Please refer to the attached PDF file for our more comprehensive proposal.

No supports
LOGO

Lorn and Oban Reuse Initiative - Renewals and Expansion Project

2025-05-30  •  1 comment  •  The GRAB Trust  •  Regeneration Capital Grant Fund

What we want to do - Lorn and Oban Reuse Initiative (LORI) is our long-standing furniture reuse project based in Oban, serving communities for over 15 years. The project, which aims to achieve a Zero Waste society, diverts furniture, household goods and electricals etc. into reuse and before [these] unwanted items enter the waste hierarchy. In the last 12 months, LORI has supported over 11500 customers including businesses, individuals and families. Those in poverty and personal crisis, those displaced by war in Ukraine and communities challenged by the ongoing cost of living crisis. “Such a fantastic way to reduce wasting perfectly good products. Furniture is top quality and the staff I met were friendly, welcoming and incredibly helpful.” CustomerThis is an exciting period for our charity, as we are planning a major expansion of our work to enable us to better support the growing number of people who come to us for help. Our plans are well advanced including planning consent and building warrant for the proposed improvements and renewals to increase available floor space to meet the growing demand for reuse goods. GRAB has set aside reserves to contribute to the cost of these improvements.Under this grant we propose to move forward rapidly with the project. Available match funding already secured will support project management and admin resources and back LORI during any disruption to trade while improvements take place. Under this grant, captal funds will be deployed to prepare groundworks and the foundations to accommodate new modular buildings, the purchase of new buildings to replace derelict and delapidated units and much-needed welfare facilities. And extensive refurbishment to an existing building.    Why the project is needed - In Argyll and Bute, landfill accounts for around half of the Council’s annual production of Carbon Dioxide equivalent emissions (CO2e). (Source: Argyll and Bute Council Decarbonisation Plan 2021). Positive changes will the project bring about - Planet – Tackling the climate emergency, LORI reduces landfill; 45% of greenhouse gases come from products we use and purchase. Saving valuable resources from landfill, LORI reduces the communities’ carbon footprint and cuts emissions.  In Oban and Lorn approx. 858 tonnes of Municipal Solid Waste is produced each year.  Currently just over 10% or 86 tonnes is diverted through reuse by The GRAB Trust.  People – supporting local people and creating jobs, LORI supports communities to utilise existing resources, LORI has steadily increased volumes diverted from landfill each year; diverting over 450 tonnes from landfill in the last 8 years. The initiative sustains 7 jobs and 12 regular volunteers.  Pounds – Strengthening the circular economy we offer low cost, high quality furniture and homewares to everyone as a sustainable, low cost alternative to buying new.  LORI supports the Circular Economy by keeping existing resources in use for longer and our not-for-profit community enterprise now recirculates over £120,000 in our communities annually. Reducing the tax burden, LORI decreases landfill tax, saving local taxpayers over £8,000 annually. Place – engaging and empowering communities LORI is a place where ideas flourish. We support community groups and partners in the third sector. We help businesses like cafes, hotels and Air B&B furnish their premises.  We help communities to share and to learn new skills; reusing and repairing is a creative way to try new things, gain useful skills, appreciate what we already have and find new uses to make the most of it.  GRAB is part of Circular Communities Scotland Share and Repair Network and LORI is a source for tools for makers and craftsmen - keeping traditions alive.Our renewals project at LORI will ensure communities are supported for years to come - increase available floorspace by 80%, introduce welfare facilities for staff and volunteers and extend product lines – the new provision of running water at the site will open up the possibility of testing white goods (washing machines & dishwashers) for example. With increased floorspace LORI will better serve the growing demand for reuse, further reduce landfill and offer increased support to the circular economy in Oban and Lorn.   

No supports
Design of Mull Theatre Extension

An Tobar and Mull Theatre: Theatre Development and Early Years Facility

2025-05-23  •  No comments  •  An Tobar and Mull Theatre  •  Regeneration Capital Grant Fund

Who are we?

An Tobar and Mull Theatre (AT&MT) is a vibrant multi-arts centre on the Isle of Mull and the only producing theatre in the Hebrides. As a hub for artistic excellence, cultural expression, and community connection, we play a vital role in our island's creative and social ecology. We aspire to be an island voice holding space for island experience in global culture at a time when the voices of rural communities are drowned out. Through our wide-ranging programme of theatre, visual arts, creative learning, and music, we serve: 

  • Local and visiting artists, providing space, time, and collaborative opportunities to experiment and grow. 
  • All school-age children on Mull, providing arts engagement and curriculum enrichment. 
  • Young people, creating pathways in the creative industries and amplifying youth voice through the arts. 
  • Older adults, including those living with dementia and other long-term conditions, supporting wellbeing and inclusion.

AT&MT has been recognised as a leader in community-based arts practice by the Federation of Scottish Theatre and as an essential part of local infrastructure by the Mull and Iona Community Trust.  The value of our community outreach, arts provision, and advocacy for rural communities is reflected in the thoughtful feedback we continue to receive from our local community:

“Engaging directly with one’s local community and peers is a valuable experience as it provides opportunity to share ideas and experiences and reinforces connectivity across our islands. I feel that this type of outreach work [AT&MT’s community outreach programme] is fundamental to a thriving cultural ecology on Mull and Iona” – Studio Cèilidh participant

“Because of Mull’s geography and lack of public transport many youngsters have difficulty accessing creative activities [...] The work has been taken to them through schools and location theatre. This ensures equality of access.” – Long-term Community Members

What do we want to do and why?

To secure our future and deepen our impact, we are launching an ambitious development project that responds directly to the needs of our island community. At the heart of this project is the purchase of the land beneath Mull Theatre and extension of the building to include dedicated creative workshop spaces for artists and visiting practitioners and an on-site crèche and early years facility to support families and broaden access to the arts. 

This project is essential to: 

  • Protect the future of Mull's only professional theatre and the only producing theatre in the Hebrides. Currently operating under a lease, securing ownership of our site will give us long-term stability and the confidence to plan boldly.
  • Address a critical shortage in early years childcare. Mull faces a well-documented lack of affordable and accessible childcare. This project offers a creative, community-centred solution that support parents and caregivers to participate fully in island life and the creative sector. 
  • Nurture the next generation of artists and islanders. The crèche and workshop spaces will be designed with care, learning, discovery, and cultural enrichment at their heart. 
  • Grow the island's creative ecology and promote the artistic excellence of Argyll and Bute on a national and international level. New workshop spaces will allow us to host more artists-in-residence and facilitate peer exchange. It will also offer affordable rehearsal and creation space for local and visiting artists, and extend our ability to deliver training, workshops, and events that connect Mull and Argyll and Bute to the wider cultural landscape of Scotland and beyond. 
  • Strengthen community wellbeing. As we emerge from the social and economic challenges of recent years, this development supports community recovery through creativity, care, and collaboration.

Who are our partners?  

We will work in partnership with: 

  • Local early years creative learning practitioners and educators, ensuring the crèche is child-centred, safe, and rooted in best practice. 
  • Forestry and Land Scotland, to navigate our land purchase and ensure the building extension is designed with care and attention to our beautiful natural surroundings. 
  • Mull and Iona Community Trust (MICT), to ensure the facility is bespoke and meets the needs of our island community.
  • Our Community Advisory Group, to ensure that local voices and lived experience remains at the heart of the project. 

We believe that access to the arts, like access to care, should not depend on geography. This project is about more than bricks and mortar, it's about building a future where creativity, care, and community thrive side-by-side. With the support of our partners and funders, we're excited to take this next step in our journey, ensuring that AT&MT remains a place where island voices are heard, nurtured, and celebrated for generations to come. 