Tarbert Harbour Watercraft Launch & Recovery Slipway and Community Activity Hub
2025-04-09 • No comments • • Regeneration Capital Grant Fund
-
Tarbert Harbour Authority has a bold and strategic ambition to build a Launch and Recovery Sportscraft / Watersports Slipway together with a Community and Watersports Activity Hub. Whilst the Activity Hub and Slipway are linked as a strategic development; for the purposes of funding, build and project managment, they are being treated as distinct projects with individual costs, individual project timescales and individual benefits and outcome profiles. Phase 1 will see the development of a Watercraft Launch & Recovery Slipway, Kayak Pontoon and Boat Laydown Area - £1.5M Phase 2 will see the building of a Community Water Sports and Activity Hub - £1.4M.
-
The Project utilises a vacant and semi-derelict harbourside development plot to address: A significant health and social gap in terms of water sports, gym and soft play areas and associated learning and development activities. An identified need for orgnanised, safe, educational and affordable access to the above facilities together with a learning area, meeting and events space. Community Facilities are vital for the well-being of rural villages and a community hub/gym combined with a water sports facility can be a game-changer for diverse groups of people. The integration of these amenities not only promotes physical health but also fosters social interaction together with economic growth.
-
The development of the Community Water Sports Slipway and Activity Hub will provide wide ranging benefits. Adults and children in Tarbert and Loch Fyne's local communities will have accessible opportunites to improve their health, wellbeing, social confidence, learning and skill sets. Local families will benefit from access to safe soft play and early years development stimulus. Young people in education along Loch Fyne will have the opportunity to acquire new experiences, skills and qualifications that will support their social development and provide a platform for demonstrating their capabilities in diverse ways. Visitors to Tarbert and the surrounding area, whether for work or leisure purposes, will be able to relax and participate in safe gym exercise, supervised water-based activities, training and development in sailing and boating to established National Standards. Additional employment opportunities will be directly and indirectly created by this development. The development will be a major step forward in realising the next stage in the village's regeneration and development. Regular exercise is known to reduce stress, anxiety and depression, leading to healthier, more product individuals. A well equipped gym provides access to fitness resources, encouraging users to adopt a healthy lifestyle. The gym will cater for a wide range of fitness levels and interests, from beginners to advanced. The Activity Hub will also be used as a training/meeting place for sports clubs/organisations, community groups, school groups, RYA training, activity leaders, famiies and friends.
-
It is proposed, once all Phase 1 funding is in place, to commence the development of the Launch/Retrieval Watercraft slipway this financial year with a completion date of mid 2026, Phase 2 will follow, when funding allows, and when the final funding matrix is clearer.
Partnerships: We plan to collaborate with:
-
Argyll & Bute community Council to align with local interests.
-
Schools and educational institutions to promote learning opportunities.
-
Local businesses, including bike hire providers and tourism boards, to enhance visitor engagement.
Renewing the fabric of Atlantis Leisure for the next Generation
2025-06-02 • No comments • • Regeneration Capital Grant Fund
Atlantis Leisure is a vibrant, community-run health and wellbeing hub in the heart of Oban. For over 30 years, we’ve been a lifeline for locals of all ages - a place where toddlers learn to swim, teens train with sports clubs, adults improve their fitness and older residents stay active and connected. As a registered charity and social enterprise, every penny we earn is reinvested. Our huge range of facilities are designed to support active, healthy lives. We work with schools, NHS partners, and community groups to deliver inclusive, high-impact services. With over 150,000 visits a year and no other facility like it for 95 miles, Atlantis isn’t just a leisure centre - it’s the beating heart of our community.
This application comprises separate projects that are also listed on Aspiring Places indivdiually but we thought it made sense to group them together as a single proposal for the purposes of RCGF too:
1. What do you want to do? We propose a multi-strand capital regeneration programme at Atlantis Leisure — a vital, community-owned asset serving Oban and surrounding remote rural areas — to deliver large-scale, community-led change aligned with RCGF's aims that breathes new life into an over 50 year old facility.
This project brings together three deliverable, community-prioritised infrastructure improvements:
- Installation of rooftop solar panels and battery storage: significanty reducing carbon emissions, lowering long-term operating costs and contributing to Net Zero targets. 160k
- Expansion of Atlantis’ gym: a two-storey extension to accommodate growing community demand, support inclusive programmes like Elevate & Stay Active, and provide flexible meeting and office space to host outreach services and community partners. 175k
- Creation of accessible changing facility: reconfiguring existing internal space, to provide a dignified, fully inclusive changing area to support disabled users 50k
- Restoration of end of life outdoor sports pitch: bringing an end-of-life, unusable asset back into service, enabling schools, clubs, and informal groups to use it year-round, relieving pressure from indoor space and boosting physical activity levels. 90k
- Restoration of Sports Hall Roof: rectifying end-of-life aspects of the roofing. 150,000k
2. Why is your project needed? Atlantis Leisure is a community-run registered charity and social enterprise that delivers year-round access to sport, physical activity, and wellbeing services. We are the only such facility within a 95-mile radius and serve over 150,000 users annually — yet key parts of our infrastructure are now limiting access, affordability, and impact.
- The pitch is end-of-life and unusable, with back-up facilities constrained by a statutory noise order.
- We've run out of room in our existing gym facility meaning vital communtiy programmes like Healthy Options are unable to operate properly
- There is no suitable changing space for users with complex access needs, meaning many are excluded from participation.
- Energy costs are surging, making it harder to deliver affordable access and sustain services for low-income families.
The project will regenerate these essential community assets, futureproof our building, reduce inequalities in access, and enable Atlantis to deliver sustainable social value for decades to come — directly supporting the RCGF’s priorities around deprivation, climate, inclusion, and place-based transformation.
3. What positive changes will your project bring about?
- Inclusive Infrastructure: The accessible changing space addresses long-standing inequality, empowering disabled users to participate fully & independently.
- Net-Zero Progress: Solar & battery systems will directly reduce carbon emissions, support national climate goals, & make Atlantis more financially sustainable.
- Renewed Community Space: The front pitch transformation will reinstate valuable outdoor capacity, expanding options for schools, clubs, and families.
- Address Capacity Issues: Expanding the gym answers a growing problem with existing capacity.
- Child Poverty Impact: Reducing running costs helps us to maintain subsidised programmes, removing financial barriers to physical & social wellbeing.
- Place-Based Renewal: This project aligns with the Place Principle and National Strategy for Economic Transformation by investing in a community-anchored asset with cross-cutting impact.
Together, these outcomes represent transformational, community-led regeneration that will enhance the resilience, health, and wellbeing of Oban.
4. How long will your project run for?
The project is fully deliverable within FY 2026–27.
- Start: Early 2026
- End: March 2027
- Drawdown Ready: All spend will be committed or completed within the terms of the RCGF.
- Delivery Approach: Projects will be managed by Atlantis Leisure’s Facilities Subgroup with oversight from the Board.
- Match Funding: Confirmed: Atlantis own contribution. Pending: we are actively pursuing applications and conversations with other funders including LES's CARES programme
Complete our lifeline link road!
2025-06-02 • No comments • • Regeneration Capital Grant Fund
In 2021 and 2022, IKDT secured funding to construst 1.79KM of brand new road connecting the North and South of the island. This project has been in the pipeline for many decades and has connected up the two different communities and is allowing our island to thrive as one. Just after we have secured the funding for the 2nd stage of the project, the tar topping, war broke out in Ukraine. Apart from the obvious humanitarian crisis, this had an instant impact on the price of all the raw materials required for surfacing. It meant we had to scale stage 2 back and make do with tarring the new built section of the road with a single layer of tar and leave approx 500 metres of road in an unbound, farm track state. Our plan for stage 2 had been to deliver 2 layers of tar over the new road (1.79km) and the 500m of existing road when we could petition the council to adopt the road as it connects up the existing council road to several council tax paying households. As it stands, while the road is in use and is hugely beneficial to life on the island however the maintenance burden on IKDT is not ideal. The council will not consider adoption until the road is brought up to the standard we had planned for stage 2 so we are hoping to complete the job. Adoption is key to the long term future of the road and indeed to whole community as it will allow unfettered access to all including vital services, emergency vehicles and access to the lifeline ferry service. The surfacing could be delivered in one week but the effects would be felt for generations to come. We would hope to continue the excellent working relationship with A&B Roads department to help deliver the best value for money possible.
Oban Re_Store - Sustainability and Development
2025-05-30 • No comments • • Regeneration Capital Grant Fund
After a successful first year of operation, the Connecting Communities Collective wants to continue to develop and improve our offerings to the community. Re_Store is more than a charity shop- alongside selling affordable food, clothing, books, toys and homewares, we promote sustainability and work to reduce waste. We deliver workshops and events to enable people to learn the skills to repair and upcycle clothing and accessories. We also run a Rescued Food Project, saving short date food from landfill, while offering access to affordable food. We programme events to promote sustainability, share our work and to celebrate our community.
The shop aims to alleviate the impacts of poverty, specifically by reducing food and textile waste and improving skills. While doing this, we have created a social and community hub- a welcoming, safe, creative and encouraging place that helps to alleviate social isolation and promotes community cohesion. We are keen to develop our workshop programme to engage more of the local community. After a successful pilot event in March 2025, we want to run another community fashion show in 2026 to promote sustainability and celebrate the work of Re_Store and the Connecting Communities Collective.
In partnership with a new community-led organisation- the Oban and District Development Trust, the Connecting Communities Collective is working towards the community buyout of the shop building at 113 George St., Oban. This will ensure the security of the shop for the future, along with keeping income within the local economy. Our plans for the sustainability and development of the Re_Store building and the programme of activities are based on the principles of Community Wealth Building.
Why this project is needed:
We have proven that our project is needed by running successfully and smashing projections for sales and uptake in our first year of operation. Feedback from participants and beneficiaries has been incredibly positive and we have evidence via feedback and evaluations that we are having a positive impact on the local community.
Please see the attached document for the full Project Proposal (due to issues with formatting, this wasn't possible to upload)
Redevelopment of Tayvallich Community Hall
2025-05-28 • No comments • • Regeneration Capital Grant Fund
What we want to do -
Phase 1 involves replacing the hall disabled access and the provision of a generator to enhance community resilience.
Phase 2 re-configuring the toilet block and the provision of hot water in the ladies toilets.
Phase 3 - installing a decking, and two patio doors to enhance provision for events. Also creation of more storage.
Why our project is needed.
The hall is used by the local primary school for provision of sports facilities and other activities. The Parent Council arranges parties and other communal events - such as an annual car wash and wreath-making at Christmas. The hall provides many family events, shows, films and talks - to keep the local community informed and entertained. A seperate gym club runs on a wednesday. The multi-sport court provides for sporting activities such as hockey and tennis, and the playing field is used for football and field sports.
Many tourists use the hall's facilities especially for events such as "Gala day", and tourism is an important industry in Scotland. The hall was instrumental in the creation of Tayvallich Initiative which aims to provide low-cost housing in the village for essential workers and implements "rural burdens" which help ensure community survival longer-term. The annual Kayak Symposium run by local firm "Argyll Kayaks", brings dozens to the village for a weekend, centered around the hall, which benefits the whole community including the community shop and the Inn.
"Resilience Planning" is a recent aim of the Community Hall. A few months back there was a power outage for 4 days - many were caught out by it. Apart from losing heating and cooking, many have private water supplies (pumped) and so had no water either. The hall did its best as a "resilience hub" but had no electric itself - simply brewing hot drinks on a gas stove - it could not offer shelter/heating/lighting/hot food. Resilience planning involves a back-up generator to better serve the community in such future events.
The hall provides many services to the local community. Yoga on a monday and thursday; table tennis on a monday; bowls on a thursday; "Pickle ball" on a tuesday; "stretch and tone" on a tuesday; Fencing on a wednesday; Lunch Club every month - providing for the retired members of our community. The hall also hosts First Aid classes which benefit the local community and beyond.
The hall is also a popular venue for weddings (and funerals). There are regular Coffee Mornings in aid of a range of charities - Beatson cancer charity; the Lochgilphead Snowdrop Centre; and the Taynish run in aid of McMillan cancer care. The annual flower show is also a popular event. In addition, the hall hosts events such as Films and Talks - often being full to capacity. Friday and saturday evenings often see the hall host Bands and Ceilidhs which attract visitors from further afield. It encourages and supports local artists and musicians.
The project will bring about many positive changes.
It is essential that the hall can continue to act as a community hub. Phase 1 - the generator - will ensure it can run as a resilience hub too. Phase 1 also includes better disabled access which is essential. Provision of better toilet facilities is also essential (Phase 2), given the hall's popularity. Phase 3 will increase the capacity of the hall - even more community activities will be encouraged and supported.
The hall is a vital community resource and needs to be supported and protected. The success of the community hall helps kindle social cohesion - it is a vital part of village life.
The project will start in July 2025 and take 6 months to complete.
Creating a Cairnbaan Community Hub. Refurbishment of the old forestry buildings
2025-05-30 • No comments • • Regeneration Capital Grant Fund
1. What we want to achieve.
The Cairnbaan Community Trust, (SC052905) wants to refurbish the forestry buildings to provide a community gathering point and flexible workshop and event spaces. We want a community hub that can be used by the community for education such as crafts and Gaelic, health e.g. yoga and other activities, recreation and social gatherings, inside and outside and temporary office space for local entrepreneurs.
Our priority is the smaller of the two buildings which will provide space for community events and workshops, social meeting space, hot desks and a community kitchen. There is external space that can be developed to provide a community garden and outside event space. It is hoped in the future the larger of the two buildings can be developed to provide space for larger workshops and events.
We have divided the work into phases and we are currently seeking funding for phases 1 and 2.
Phase 0: This covers the procurement of the forestry buildings under a community asset transfer funded by the Scottish Land Fund and we have secured initial funding for essential repairs to both buildings to make them safe and weatherproof. The work will start when we take ownership on the 01/08/2025.
Phase 1: Is the refurbishment of the smaller building. This phase will change the internal layout of the building to create flexible spaces. This entails new partitions, doors, lighting and upgrade to the heating. Additional facilities, external and internal, will be needed for disabled and users with special needs. We also aim to fit a community kitchen and social space for coffee mornings. Finally we need to replace windows and install new furnishings and fittings.
Phase 2: Is the landscaping and provision of a community garden and outdoor space.
Phase 3: Is the refurbishment and fitting out of the larger building. In this phase we also plan to look at energy efficiency improvements, e.g. heat pumps and solar panels.
2. Why our project is needed
Currently there is no community centre to provide a focal point or resources for the community. There is a risk of social isolation amongst our older population and there are no facilities for the young people in our village. Community cohesion is being eroded.
We commissioned a feasibility report through Community Enterprise which highlighted the following points. Accessing facilities is difficult without a car, the minimal bus service is a school service with no evening or Sunday services. There are no shops, medical or other services in the village. Despite scoring highly in other domains the area falls into the 10% most deprived areas in Scotland in terms of access to services in relation to the Scottish indices of multiple deprivation. Feedback from local people highlighted that a primary need in the community is an indoor social area and meeting space.
3. The positive changes our project will bring
Our vision is to reduce isolation, improve community life and reflect the cultural, environment and historic heritage of the area. The current priorities for the CCT are.
- Bringing the community together to enable opportunities for social interaction and growth.
- Advancement of arts, heritage, culture and science.
- The provision and organization of recreational facilities to improve the quality of life for the community.
- Improving the environment including education about the environment, culture and history.
- The relief of thos in need either because of age, ill health, disability or financial hardship.
The refurbishment of the buidings will provide a focal point for the community and the resources to bring the community together especially those that feel isolated. It will provide resources for all ages across the community and give everyone opportunities for development and a sense of purpose and indentity.
Through current engagement with the local community we have already identified skills and volunteers that can contribute to the refurbishment which will foster community involvement from the outset
4. How long will our project run
Phase 1 and 2 of the project will start on: 05/01/2026
The project will run for: 15 months
Our Business plan and the Feasibility report are available on request. Unfortunately the file size was too big to attach.
Dunoon Pier
2025-03-26 • No comments • • Regeneration Capital Grant Fund
Operating under the governance of the Dunoon Community Development Trust and in partnership with Argyll and Bute Council, the Save the Pier working group has been actively seeking funding and carrying out further research to progress the necessary technical studies needed to inform these types of developments.
The initial goal of the working group is to develop a robust, evidence-based feasibility study, providing a clear case for the pier’s redevelopment and its potential role within the future of the town’s wider marine infrastructure. Longer-term they hope to begin the process of the pier’s renovation.
The wider team —comprising volunteers with expertise in public sector infrastructure, finance, heritage preservation, project development and community engagement —has been engaging with stakeholders in the public and private sector, having discussions with potential funders, and laying the groundwork to ensure any future redevelopment is viable and sustainable.
Our Progress So Far
The project has involved extensive positive collaboration with Argyll and Bute Council, alongside wider stakeholder consultations, a public petition, and collaboration with advisors in major infrastructure, heritage conservation, and funding options.
Community Involvement
Community engagement will be essential to shaping the pier’s future. There has consistently been a lot of interest on social media and in the newspaper with large numbers of people getting behind the idea of Dunoon Pier being regenerated. It is clear that there is good community support for the idea and the working group welcomes the input of local residents, businesses, and local organisations as the project evolves.
At this stage, the focus is on gathering the necessary technical and financial evidence to determine what is achievable.
Next Steps
Funding is currently being secured to complete a feasibility study, which will provide a comprehensive assessment of the pier’s future potential. This study will form the foundation for securing funding to progress any future redevelopment. However, given the scale of the project, careful planning and a phased approach is required. We aim to complete this initial phase and be in a position to share the feasibility study by Summer 2025.
Looking Ahead
Public infrastructure projects of this scale take time, but the dedication of the team working with the support of the local authority and Dunoon Community Development Trust means that there is a good chance that this project will progress positively. The Dunoon Pier working group is committed to communicating on their progress and will provide regular updates via Dunoon Community Development Trust and partners as the project moves forward.
An Tobar and Mull Theatre: Theatre Development and Early Years Facility
2025-05-23 • No comments • • Regeneration Capital Grant Fund
Who are we?
An Tobar and Mull Theatre (AT&MT) is a vibrant multi-arts centre on the Isle of Mull and the only producing theatre in the Hebrides. As a hub for artistic excellence, cultural expression, and community connection, we play a vital role in our island's creative and social ecology. We aspire to be an island voice holding space for island experience in global culture at a time when the voices of rural communities are drowned out. Through our wide-ranging programme of theatre, visual arts, creative learning, and music, we serve:
- Local and visiting artists, providing space, time, and collaborative opportunities to experiment and grow.
- All school-age children on Mull, providing arts engagement and curriculum enrichment.
- Young people, creating pathways in the creative industries and amplifying youth voice through the arts.
- Older adults, including those living with dementia and other long-term conditions, supporting wellbeing and inclusion.
AT&MT has been recognised as a leader in community-based arts practice by the Federation of Scottish Theatre and as an essential part of local infrastructure by the Mull and Iona Community Trust. The value of our community outreach, arts provision, and advocacy for rural communities is reflected in the thoughtful feedback we continue to receive from our local community:
“Engaging directly with one’s local community and peers is a valuable experience as it provides opportunity to share ideas and experiences and reinforces connectivity across our islands. I feel that this type of outreach work [AT&MT’s community outreach programme] is fundamental to a thriving cultural ecology on Mull and Iona” – Studio Cèilidh participant
“Because of Mull’s geography and lack of public transport many youngsters have difficulty accessing creative activities [...] The work has been taken to them through schools and location theatre. This ensures equality of access.” – Long-term Community Members
What do we want to do and why?
To secure our future and deepen our impact, we are launching an ambitious development project that responds directly to the needs of our island community. At the heart of this project is the purchase of the land beneath Mull Theatre and extension of the building to include dedicated creative workshop spaces for artists and visiting practitioners and an on-site crèche and early years facility to support families and broaden access to the arts.
This project is essential to:
- Protect the future of Mull's only professional theatre and the only producing theatre in the Hebrides. Currently operating under a lease, securing ownership of our site will give us long-term stability and the confidence to plan boldly.
- Address a critical shortage in early years childcare. Mull faces a well-documented lack of affordable and accessible childcare. This project offers a creative, community-centred solution that support parents and caregivers to participate fully in island life and the creative sector.
- Nurture the next generation of artists and islanders. The crèche and workshop spaces will be designed with care, learning, discovery, and cultural enrichment at their heart.
- Grow the island's creative ecology and promote the artistic excellence of Argyll and Bute on a national and international level. New workshop spaces will allow us to host more artists-in-residence and facilitate peer exchange. It will also offer affordable rehearsal and creation space for local and visiting artists, and extend our ability to deliver training, workshops, and events that connect Mull and Argyll and Bute to the wider cultural landscape of Scotland and beyond.
- Strengthen community wellbeing. As we emerge from the social and economic challenges of recent years, this development supports community recovery through creativity, care, and collaboration.
Who are our partners?
We will work in partnership with:
- Local early years creative learning practitioners and educators, ensuring the crèche is child-centred, safe, and rooted in best practice.
- Forestry and Land Scotland, to navigate our land purchase and ensure the building extension is designed with care and attention to our beautiful natural surroundings.
- Mull and Iona Community Trust (MICT), to ensure the facility is bespoke and meets the needs of our island community.
- Our Community Advisory Group, to ensure that local voices and lived experience remains at the heart of the project.
We believe that access to the arts, like access to care, should not depend on geography. This project is about more than bricks and mortar, it's about building a future where creativity, care, and community thrive side-by-side. With the support of our partners and funders, we're excited to take this next step in our journey, ensuring that AT&MT remains a place where island voices are heard, nurtured, and celebrated for generations to come.
Inveraray Pier- A neglected Pearl of a Great Town
2025-05-31 • No comments • • Regeneration Capital Grant Fund
Inveraray Pier has been in a cycle of neglectful private ownership for over 20 years, and closed to the community, visitors and marine traffic for 10 years. In July 2023 Inspire Inveraray secured funding to purchase the pier on behalf of the community and has since successfully restored and opened the stone part of the pier to the public, however the timber pier remains closed and is in desperate need of restoration.
The objective of the project is the restoration and opening of the existing timber peir. The heritage of the timber pier is at the heart of the community, and was identified as a priority in a recent community consultation. The timber pier is in extremely poor condition and ,without restoration, the risk of loss of a valuable local asset is inevitable.
Restoration works will commence as soon as funding has been achieved, ideally starting in October 2025.
The community ownership of the pier has given a sense of pride and achievement to local people who are now keen to help and get involved to get the timber part of the pier restored. This is the opportunity for the local community to manage a valuable local asset and to complete the full restoration of the pier including the timber part. Reopening the pier has connected local communities and is building confidence in the achievability and benefits of community asset ownership.
The pier is the gateway to Inveraray and for the past 10 years had been an eye sore in the town. Restoring the timber part of the pier will help increase the number of visitors to the town by boat, creating an opportunity to generate an income that can be reinvested into community projects.
The pier will be a flat and open accessible space encouraging activities such as water sports, community events and gatherings amongst the local community. Fully restoring the timber part will allow more vessels to moor in Inveraray, serving as a safe transfer platform for cargo and passengers.
Once fully restored, Heritage boards will be commissioned for placement on the pier to provide historical background for local people and visitors visiting Inveraray and its treasured pier.
Nonhebel Park (Final Phase)- Community Regeneration in Action
2025-05-30 • No comments • • Regeneration Capital Grant Fund
The Project: We want to develop the final piece of community owned land available at Nonhebel Light Industrial Park, Tobermory to build up to two additional business units. The new units will be for rent to businesses which are on a waiting list for space at the site. Project Background & Need: In response to community identified need for small business premises, community led rengeration charity, Mull and Iona Community Trust developed and now manages 38 business units plus fenced compounds, supporting 24 local businesses and an estimated 61 jobs. There is a waiting list for the units still, proving market failure and the need to develop the final piece of land on the site to further support local businesses and economic regeneration in North Mull. Project Outcomes: Positive Changes: New business units supporting a minimum 2 businesses and up to another 8 local jobs. Improving access to services, tackling rural poverty and population decline by supporting business expansion, start-up and employment; improving family incomes and making the island a more vibrant and sustainable place to live and work. Project Timescales: Subject to securing funding, work to start in late 2025 and complete in Spring 2026. Highland and Island Enterprise are a project partner with a funding offer in the region of £200k.