- Cards
- List
Renewing the fabric of Atlantis Leisure for the next Generation
2025-06-02 • No comments • • Regeneration Capital Grant Fund
Atlantis Leisure is a vibrant, community-run health and wellbeing hub in the heart of Oban. For over 30 years, we’ve been a lifeline for locals of all ages - a place where toddlers learn to swim, teens train with sports clubs, adults improve their fitness and older residents stay active and connected. As a registered charity and social enterprise, every penny we earn is reinvested. Our huge range of facilities are designed to support active, healthy lives. We work with schools, NHS partners, and community groups to deliver inclusive, high-impact services. With over 150,000 visits a year and no other facility like it for 95 miles, Atlantis isn’t just a leisure centre - it’s the beating heart of our community.
This application comprises separate projects that are also listed on Aspiring Places indivdiually but we thought it made sense to group them together as a single proposal for the purposes of RCGF too:
1. What do you want to do? We propose a multi-strand capital regeneration programme at Atlantis Leisure — a vital, community-owned asset serving Oban and surrounding remote rural areas — to deliver large-scale, community-led change aligned with RCGF's aims that breathes new life into an over 50 year old facility.
This project brings together three deliverable, community-prioritised infrastructure improvements:
- Installation of rooftop solar panels and battery storage: significanty reducing carbon emissions, lowering long-term operating costs and contributing to Net Zero targets. 160k
- Expansion of Atlantis’ gym: a two-storey extension to accommodate growing community demand, support inclusive programmes like Elevate & Stay Active, and provide flexible meeting and office space to host outreach services and community partners. 175k
- Creation of accessible changing facility: reconfiguring existing internal space, to provide a dignified, fully inclusive changing area to support disabled users 50k
- Restoration of end of life outdoor sports pitch: bringing an end-of-life, unusable asset back into service, enabling schools, clubs, and informal groups to use it year-round, relieving pressure from indoor space and boosting physical activity levels. 90k
- Restoration of Sports Hall Roof: rectifying end-of-life aspects of the roofing. 150,000k
2. Why is your project needed? Atlantis Leisure is a community-run registered charity and social enterprise that delivers year-round access to sport, physical activity, and wellbeing services. We are the only such facility within a 95-mile radius and serve over 150,000 users annually — yet key parts of our infrastructure are now limiting access, affordability, and impact.
- The pitch is end-of-life and unusable, with back-up facilities constrained by a statutory noise order.
- We've run out of room in our existing gym facility meaning vital communtiy programmes like Healthy Options are unable to operate properly
- There is no suitable changing space for users with complex access needs, meaning many are excluded from participation.
- Energy costs are surging, making it harder to deliver affordable access and sustain services for low-income families.
The project will regenerate these essential community assets, futureproof our building, reduce inequalities in access, and enable Atlantis to deliver sustainable social value for decades to come — directly supporting the RCGF’s priorities around deprivation, climate, inclusion, and place-based transformation.
3. What positive changes will your project bring about?
- Inclusive Infrastructure: The accessible changing space addresses long-standing inequality, empowering disabled users to participate fully & independently.
- Net-Zero Progress: Solar & battery systems will directly reduce carbon emissions, support national climate goals, & make Atlantis more financially sustainable.
- Renewed Community Space: The front pitch transformation will reinstate valuable outdoor capacity, expanding options for schools, clubs, and families.
- Address Capacity Issues: Expanding the gym answers a growing problem with existing capacity.
- Child Poverty Impact: Reducing running costs helps us to maintain subsidised programmes, removing financial barriers to physical & social wellbeing.
- Place-Based Renewal: This project aligns with the Place Principle and National Strategy for Economic Transformation by investing in a community-anchored asset with cross-cutting impact.
Together, these outcomes represent transformational, community-led regeneration that will enhance the resilience, health, and wellbeing of Oban.
4. How long will your project run for?
The project is fully deliverable within FY 2026–27.
- Start: Early 2026
- End: March 2027
- Drawdown Ready: All spend will be committed or completed within the terms of the RCGF.
- Delivery Approach: Projects will be managed by Atlantis Leisure’s Facilities Subgroup with oversight from the Board.
- Match Funding: Confirmed: Atlantis own contribution. Pending: we are actively pursuing applications and conversations with other funders including LES's CARES programme
Creating a Cairnbaan Community Hub. Refurbishment of the old forestry buildings
2025-05-30 • No comments • • Regeneration Capital Grant Fund
1. What we want to achieve.
The Cairnbaan Community Trust, (SC052905) wants to refurbish the forestry buildings to provide a community gathering point and flexible workshop and event spaces. We want a community hub that can be used by the community for education such as crafts and Gaelic, health e.g. yoga and other activities, recreation and social gatherings, inside and outside and temporary office space for local entrepreneurs.
Our priority is the smaller of the two buildings which will provide space for community events and workshops, social meeting space, hot desks and a community kitchen. There is external space that can be developed to provide a community garden and outside event space. It is hoped in the future the larger of the two buildings can be developed to provide space for larger workshops and events.
We have divided the work into phases and we are currently seeking funding for phases 1 and 2.
Phase 0: This covers the procurement of the forestry buildings under a community asset transfer funded by the Scottish Land Fund and we have secured initial funding for essential repairs to both buildings to make them safe and weatherproof. The work will start when we take ownership on the 01/08/2025.
Phase 1: Is the refurbishment of the smaller building. This phase will change the internal layout of the building to create flexible spaces. This entails new partitions, doors, lighting and upgrade to the heating. Additional facilities, external and internal, will be needed for disabled and users with special needs. We also aim to fit a community kitchen and social space for coffee mornings. Finally we need to replace windows and install new furnishings and fittings.
Phase 2: Is the landscaping and provision of a community garden and outdoor space.
Phase 3: Is the refurbishment and fitting out of the larger building. In this phase we also plan to look at energy efficiency improvements, e.g. heat pumps and solar panels.
2. Why our project is needed
Currently there is no community centre to provide a focal point or resources for the community. There is a risk of social isolation amongst our older population and there are no facilities for the young people in our village. Community cohesion is being eroded.
We commissioned a feasibility report through Community Enterprise which highlighted the following points. Accessing facilities is difficult without a car, the minimal bus service is a school service with no evening or Sunday services. There are no shops, medical or other services in the village. Despite scoring highly in other domains the area falls into the 10% most deprived areas in Scotland in terms of access to services in relation to the Scottish indices of multiple deprivation. Feedback from local people highlighted that a primary need in the community is an indoor social area and meeting space.
3. The positive changes our project will bring
Our vision is to reduce isolation, improve community life and reflect the cultural, environment and historic heritage of the area. The current priorities for the CCT are.
- Bringing the community together to enable opportunities for social interaction and growth.
- Advancement of arts, heritage, culture and science.
- The provision and organization of recreational facilities to improve the quality of life for the community.
- Improving the environment including education about the environment, culture and history.
- The relief of thos in need either because of age, ill health, disability or financial hardship.
The refurbishment of the buidings will provide a focal point for the community and the resources to bring the community together especially those that feel isolated. It will provide resources for all ages across the community and give everyone opportunities for development and a sense of purpose and indentity.
Through current engagement with the local community we have already identified skills and volunteers that can contribute to the refurbishment which will foster community involvement from the outset
4. How long will our project run
Phase 1 and 2 of the project will start on: 05/01/2026
The project will run for: 15 months
Our Business plan and the Feasibility report are available on request. Unfortunately the file size was too big to attach.
Portsonachan Hall Rennovation & Modernisation Project
2025-05-30 • No comments • • Regeneration Capital Grant Fund
We want to modernise and improve our village hall which has remained unchanged for almost 100 years so that it can remain at the heart of our unique loch-side community for another century.
We are a close-knit community, but geographically remote, stretching 18 linear miles down Loch Awe-side. Ensuring we have a Village Hall that is fit for purpose is essential to keep us together, especially through the long autumn and winter months. The Hall provides us with a way of keeping in touch, offering people company and activities when there are so few amenities within the proximity of our community. Our Hall is home to about 13 different community groups, each with approximately 10-20 members. The Hall also provides an important resource for meetings for the South Lochaweside Community Company and the Glenorchy and Innishail Community Council as two examples. Having this space is vital for ensuring we can maintain such activities which allow our community a voice within the democratic process. We also hold many social evenings, which bring together new members of the community looking to integrate as well as many of the established community who would not get to see each other without the Hall. Our most recent BBQ brought in 90 people and our Sunday lunch catered for 30 people, and many of whom said without having this event, they would have spent their weekend alone.
The closure of the local bar recently has left a void in the community with the hall now the only communal space where members of the community can come together.
Having a space that is safe, warm and usable is a lifeline for rural communities like ours, and has wide-reaching impacts, including on our community's health and wellbeing. Given the age of our existing hall we need to refurbish our Hall to ensure it can continue to serve our community and for it to become more environmentally-considerate.
Full planning permission was granted for the rennovation project in May 2025. We can now begin work on the creation of our project management plan which is likely to be divided into distinct phases.
We anticipate that this project will take a year to a year and half to complete, during which time we will partner with Glenorchy & Innishail Community Council, South Loch Awe Community Company, Dalmally Community Company and Orchy & Awe Community Trust.
Clachan Village Hall/Community Hub Phoenix project
2025-06-02 • No comments • • Regeneration Capital Grant Fund
Clachan lost its much loved and well used village hall due to terminal decline as an asbestos concrete roofed building with corroded portal flames and was demolished in 2022. The iconic historic B Lited Kilcalmonell church was purchased with a Scottish Land Fund grant to serve as a replacement village hall to arise like the proverbial phoenix from the ashes of the old hall. The hub will allow resumption of the dormant user group activities and will provide a recreational, educational venue for the comunity as well as a resource for private hire. It will also serve as an emergency centre to provide safe haven and meal provision at times of emergency such as has occured on many occasions over the past 10 years particualrly in relation to power cuts, village floods, a freak snow storm, and gales, some of which also resulted in blocking the A83 artery to Campbeltown. We are in the process of renovating the exisitng church building to provide the main comunal space and this work shold be completed by the end of the year. This is being funded in part by are own fund raising initiatives and by local wind farm trust grants. We then need grant funding for the extension to provides the addtional space for : a catering/kitchen area, a small meeting room, additional storage and toilet provision with disabled access for larger capacity events and activities. It is is this extension project (phase 2) that we are seeking funding from the RCGF scheme as well as other agencies such as the Windfarm Trusts, and other grant funders. We are looking for this construction work to be done 2026-2027.
Dunoon Skatepark Redevelopment
2025-05-30 • No comments • • Regeneration Capital Grant Fund
Dunoon Community Development Trust wants to work with children and young people to design and develop a new skatepark facility in Dunoon that will better meet their needs and encourage increased outdoor activity and community connection.
Dunoon Skatepark is sited in Ardenslate, one of two areas in the town within the highest decile of the Scottish Index of Multiple Deprivation. The original skatepark was campaigned for and developed by local young almost 20 years ago and its creation was a major achievement for those involved. It was well used for several years, however, the original steel structures and rough surfacing are no longer fit for purpose and levels of use have seriously declined. Some elements of the facility present a significant hazard, especially for learners, so there are very few younger users or family involvement. Local young people and young adults have been actively involved in campaigning for improvements to the skatepark gathering hundreds of signatures on their petition on Change.org Recent engagement with school pupils has confirmed their interest in improved facilities for skating and wheeling on the site.
By developing this facility to better meet the needs of skateboarders, in-line skaters and BMX bikers of all abilities, we will be able to support and encourage children, young people and young adults to build their skills and enjoy peer-to-peer learning experiences. More time spent outdoors engaging in interesting physical activities will help to address the health and wellbeing challenges faced by young people and young adults and help to reduce social isolation.
This project will run for between 12 and 18 months including consultation, design, planning, permissions and construction.
The skatepark is situated on land owned by Argyll & Bute Council so it will be vital to work in partnership with them. Consultation will also involve local schools, Dunoon Community Council and Live Argyll youth work team.
Jura Community Sports Facility - Project Aspiration
2025-04-10 • No comments • • Regeneration Capital Grant Fund
The new sports facility will be suitable for all weather conditions and will enable the playing of various sports on the same surface, including five-a-side football, netball, basketball, and shinty practice.
The Jura Community Development Plan, produced by the Jura Development Trust, highlights the necessity for improved youth and recreational facilities on the Island and concludes that further investigation is required regarding the preferred nature of these facilities.
Developing community-owned and managed assets is strongly supported by national and local policy.
Sonas Childcare Project
2025-05-26 • No comments • • Regeneration Capital Grant Fund
SID plans to build a dedicated childcare facility to cater for babies and toddlers up to three years old and provide dedicated childcare services for the community. This building will complement the soon to be finished new community Pavilion, and will be set within the 16 acres of Playing Fields, with access to a nearby enclosed playpark, and plenty of green space.
On Islay there are a very limited number of childminders available. Islay has had a steady number of babies born in the last three years (ranging from 20-22 babies/year) and this is predicted to rise. Due to the lack of services available, families are using relatives and friends as childminders to allow them to return to work. The provision of a dedicated childcare facility would provide flexibility with this.
The facility will bring the following positive changes:
- More flexibility for families with regards to 0 to 3 childcare options.
- More opportunities for families to work childcare around their needs, enabling parents to return to work.
- Families may be encouraged to move to Islay, as instead of having severely limited childcare options there will be a dedicated facility.
- It will provide options for employment and training within the facility. It may help provide an opportunity for students and school leavers to gain work experience in their chosen field, without having to leave Islay.
It is anticipated that it will be several years before the facility is up and running. The project is currently in the early stages. A Planning Application has been submitted to Argyll & Bute Council, and the Building Warrant has been completed as far as possible, given the current funding restrictions. SID are currently looking for funding to finalise the Building Warrant, and move on to the construction phases.
MACPool Activity Hub: Sustainability
2025-05-22 • No comments • • Regeneration Capital Grant Fund
MACPool Activity Hub is a local community hub settled within the rural area of Lochgilphead. We currently service the area of Mid Argyll, where the population is approximately 6,000 people. On an average week, we will provide services such as specialised swimming sessions, fitness classes and Learn to Swim lessons, where over 500 regular participants will attend the Activity Hub.
MACPool Activity Hub works closely with rural school with promoting Water Safety Sessions and scheduled blocks of weekly lessons to pupils. The main Learn to Swim program caters to more than 220 participants from a 25 mile radius on a weekly basis, with ages ranging from 4-75 years old.
We offer a range of programs designed to specialise in different needs such as our Toddler Time sessions to classes such as HyrdoMobility, a senior exercise class, focusing on water-based exercises to strengthen the core and increase stability.
In collaboration with RMFitness and the NHS Living Well Program, MACPool Activity Hub has been assisting with the rehabilitation within the senior community, providing a bespoke area to re-build confidence, both in and out of the water.
We also host Additional Support Needs (ASN) and Young Carer sessions in partnership with the Mid Argyll Youth Development Services (MAYDS), providing a safe space for those in the community who may not otherwise have access to such spaces.
In accordance with our sustainability principles, MACPool Activity Hub is a part of the Renewable Heating Incentive (RHI) scheme. Therefore, the Hub uses a biomass boiler that is fuelled by woodchips to produce the necessary heating for the swimming pool and hot water systems. MACPool Activity Hub is also a part of the Feed In Tariff (FIT) scheme and have over 100 solar panels, which generate renewable electricity.
During previous winters, however, the quality of the fuel source has declined, causing our boilers to malfunction. It is essential that our boilers remain fully operational to comply with regulations concerning water and air temperatures. When we do not meet these regulations, we are forced to close the pool, cancelling valuable swimming lessons, fitness classes and pre-programmed sessions, thus losing credibility and revenue.
Our vision is to expand on the foundations of what we have created so far, improving integral community bonds, while seeking other connections to become a cornerstone of the community. To sustain our efforts, we aim to secure funding for a secondary heating source and to upgrade the storage silo, to allow us to change over from woodchips to wood pellets. This will enable us to remain in the RHI scheme while continuing to develop our programs and timetable, while also fostering partnerships that align with the needs of the community.
Dunoon Pier
2025-03-26 • No comments • • Regeneration Capital Grant Fund
Operating under the governance of the Dunoon Community Development Trust and in partnership with Argyll and Bute Council, the Save the Pier working group has been actively seeking funding and carrying out further research to progress the necessary technical studies needed to inform these types of developments.
The initial goal of the working group is to develop a robust, evidence-based feasibility study, providing a clear case for the pier’s redevelopment and its potential role within the future of the town’s wider marine infrastructure. Longer-term they hope to begin the process of the pier’s renovation.
The wider team —comprising volunteers with expertise in public sector infrastructure, finance, heritage preservation, project development and community engagement —has been engaging with stakeholders in the public and private sector, having discussions with potential funders, and laying the groundwork to ensure any future redevelopment is viable and sustainable.
Our Progress So Far
The project has involved extensive positive collaboration with Argyll and Bute Council, alongside wider stakeholder consultations, a public petition, and collaboration with advisors in major infrastructure, heritage conservation, and funding options.
Community Involvement
Community engagement will be essential to shaping the pier’s future. There has consistently been a lot of interest on social media and in the newspaper with large numbers of people getting behind the idea of Dunoon Pier being regenerated. It is clear that there is good community support for the idea and the working group welcomes the input of local residents, businesses, and local organisations as the project evolves.
At this stage, the focus is on gathering the necessary technical and financial evidence to determine what is achievable.
Next Steps
Funding is currently being secured to complete a feasibility study, which will provide a comprehensive assessment of the pier’s future potential. This study will form the foundation for securing funding to progress any future redevelopment. However, given the scale of the project, careful planning and a phased approach is required. We aim to complete this initial phase and be in a position to share the feasibility study by Summer 2025.
Looking Ahead
Public infrastructure projects of this scale take time, but the dedication of the team working with the support of the local authority and Dunoon Community Development Trust means that there is a good chance that this project will progress positively. The Dunoon Pier working group is committed to communicating on their progress and will provide regular updates via Dunoon Community Development Trust and partners as the project moves forward.
Unlocking Ulva: A Community Barge to Connect, Create and Thrive
2025-06-02 • No comments • • Regeneration Capital Grant Fund
North West Mull Community Woodland Company (NWMCWC) proposes to purchase and operate a community-owned barge to serve the Isle of Ulva. This transformative asset will unlock essential access for people, goods, vehicles, livestock, and materials - enabling regeneration, resilience, and economic growth on a fragile, remote island currently constrained by limited marine transport.
Ulva is a roadless island off the west coast of Mull, with no bridge and only a passenger ferry. The community is entirely reliant on the support of a local fish farm for occasional barge support - help that has been generous and invaluable over the last few years, though is naturally limited. This creates a significant barrier to regeneration, preventing progress on key projects and undermining the island’s long-term sustainability.
The barge will address this infrastructure gap and enable a range of community-led initiatives, including:
-
Heritage restoration, including the movement of scaffolding, stone, and tools to repair historic buildings like Ulva House or Telford-designed church, and other community buildings.
-
Sustainable land management, supporting crofting and farming by transporting livestock, feed, and agricultural supplies, as well as help with the removal of unused and broken equipment and machinery.
-
Resident-led business development, giving islanders the infrastructure needed to start and sustain their own small enterprises - enabling self-sufficiency and reducing dependence on external services.
-
Contractor and service access, allowing building and infrastructure work to proceed without excessive private transport costs.
-
Emergency resilience, offering an alternative logistics route in the event of ferry failure.
-
A community-led initiatives like Ulva Producers’ Market, connecting local growers, makers, and visitors in a shared island space.
-
Cultural and community events, such as pop-up exhibitions, and other events that require transporting bulky or heavy equipment.
As one resident said, "A community barge would secure the long-term future of the farm and ensure we’re no longer totally reliant on a third party to move livestock or machinery. It would also open up opportunities for diversification. On a personal level, it would create a more sustainable and flexible connection between Ulva and Mull—helping our community grow, thrive, and engage more with the wider community of north-west Mull.”
The barge will be community-owned, maintained by NWMCWC, and operated in partnership with residents and local businesses. It will have multiple uses and function flexibly, supporting both everyday needs and long-term community goals. Critically, it provides a foundation for further regeneration efforts, addressing a clear case of market failure and enabling transformational change.
The project will be ready to commence once capital funding is secured, with delivery anticipated over 12–18 months, including procurement, compliance, training, and launch.