Clachan Village Hall/Community Hub Phoenix project
2025-06-02 • No comments • • Regeneration Capital Grant Fund
Clachan lost its much loved and well used village hall due to terminal decline as an asbestos concrete roofed building with corroded portal flames and was demolished in 2022. The iconic historic B Lited Kilcalmonell church was purchased with a Scottish Land Fund grant to serve as a replacement village hall to arise like the proverbial phoenix from the ashes of the old hall. The hub will allow resumption of the dormant user group activities and will provide a recreational, educational venue for the comunity as well as a resource for private hire. It will also serve as an emergency centre to provide safe haven and meal provision at times of emergency such as has occured on many occasions over the past 10 years particualrly in relation to power cuts, village floods, a freak snow storm, and gales, some of which also resulted in blocking the A83 artery to Campbeltown. We are in the process of renovating the exisitng church building to provide the main comunal space and this work shold be completed by the end of the year. This is being funded in part by are own fund raising initiatives and by local wind farm trust grants. We then need grant funding for the extension to provides the addtional space for : a catering/kitchen area, a small meeting room, additional storage and toilet provision with disabled access for larger capacity events and activities. It is is this extension project (phase 2) that we are seeking funding from the RCGF scheme as well as other agencies such as the Windfarm Trusts, and other grant funders. We are looking for this construction work to be done 2026-2027.
Dunoon Pier
2025-03-26 • No comments • • Regeneration Capital Grant Fund
Operating under the governance of the Dunoon Community Development Trust and in partnership with Argyll and Bute Council, the Save the Pier working group has been actively seeking funding and carrying out further research to progress the necessary technical studies needed to inform these types of developments.
The initial goal of the working group is to develop a robust, evidence-based feasibility study, providing a clear case for the pier’s redevelopment and its potential role within the future of the town’s wider marine infrastructure. Longer-term they hope to begin the process of the pier’s renovation.
The wider team —comprising volunteers with expertise in public sector infrastructure, finance, heritage preservation, project development and community engagement —has been engaging with stakeholders in the public and private sector, having discussions with potential funders, and laying the groundwork to ensure any future redevelopment is viable and sustainable.
Our Progress So Far
The project has involved extensive positive collaboration with Argyll and Bute Council, alongside wider stakeholder consultations, a public petition, and collaboration with advisors in major infrastructure, heritage conservation, and funding options.
Community Involvement
Community engagement will be essential to shaping the pier’s future. There has consistently been a lot of interest on social media and in the newspaper with large numbers of people getting behind the idea of Dunoon Pier being regenerated. It is clear that there is good community support for the idea and the working group welcomes the input of local residents, businesses, and local organisations as the project evolves.
At this stage, the focus is on gathering the necessary technical and financial evidence to determine what is achievable.
Next Steps
Funding is currently being secured to complete a feasibility study, which will provide a comprehensive assessment of the pier’s future potential. This study will form the foundation for securing funding to progress any future redevelopment. However, given the scale of the project, careful planning and a phased approach is required. We aim to complete this initial phase and be in a position to share the feasibility study by Summer 2025.
Looking Ahead
Public infrastructure projects of this scale take time, but the dedication of the team working with the support of the local authority and Dunoon Community Development Trust means that there is a good chance that this project will progress positively. The Dunoon Pier working group is committed to communicating on their progress and will provide regular updates via Dunoon Community Development Trust and partners as the project moves forward.
Strachur Community Men's Shed
2025-05-22 • No comments • • Regeneration Capital Grant Fund
Our primary aim is to build a safe social/recreational workshop and creative workspace for retired men & women to undertake creative projects for the village and local district. This should assist in improving the appearance of Strachur and surrounding area for the benefit of the local community and visitors e.g. by reconstituting picnic areas that have fallen into disrepair, also by maintaining benches; fences etc. such as those in our community Heron Park and installing sculpture/art works where agreed as appropriate. Similar maintenance and creative projects would be made available to the district with the involvement of people domiciled within a 10 mile radius. Existing craft and trade skills that 'Shed' members possess would be used to do this, hopefully enabling members to learn new skills as well. Other local organizations would also benefit e.g. the local Youth/Drama Group where members could assist in the manufacture of costumes and scenery for the regular annual productions at reduced cost.
Like many small rural villages Strachur has an increasing population of retirees. We hope that involvement in local projects - through teamwork - would help in reducing feelings of isolation for the 'older' members of our community by providing mental and physical stimulation, thus showing the 'younger' members of our community that we still have something to contribute to village life whilst improving recreational facilities for all. This approach should enable the facility to be sustained for many years as people become aware of the projects we are involved in. The provision of workshop facilities should also benefit the village Memorial Hall by providing support for maintenance and supplementing the facilities available in the centre of the village. To this end we want to work with the local Development Corporation; the Village Hall Committee and the Organisations that use the limited facilities available at present.
Complete our lifeline link road!
2025-06-02 • No comments • • Regeneration Capital Grant Fund
In 2021 and 2022, IKDT secured funding to construst 1.79KM of brand new road connecting the North and South of the island. This project has been in the pipeline for many decades and has connected up the two different communities and is allowing our island to thrive as one. Just after we have secured the funding for the 2nd stage of the project, the tar topping, war broke out in Ukraine. Apart from the obvious humanitarian crisis, this had an instant impact on the price of all the raw materials required for surfacing. It meant we had to scale stage 2 back and make do with tarring the new built section of the road with a single layer of tar and leave approx 500 metres of road in an unbound, farm track state. Our plan for stage 2 had been to deliver 2 layers of tar over the new road (1.79km) and the 500m of existing road when we could petition the council to adopt the road as it connects up the existing council road to several council tax paying households. As it stands, while the road is in use and is hugely beneficial to life on the island however the maintenance burden on IKDT is not ideal. The council will not consider adoption until the road is brought up to the standard we had planned for stage 2 so we are hoping to complete the job. Adoption is key to the long term future of the road and indeed to whole community as it will allow unfettered access to all including vital services, emergency vehicles and access to the lifeline ferry service. The surfacing could be delivered in one week but the effects would be felt for generations to come. We would hope to continue the excellent working relationship with A&B Roads department to help deliver the best value for money possible.
Sonas Childcare Project
2025-05-26 • No comments • • Regeneration Capital Grant Fund
SID plans to build a dedicated childcare facility to cater for babies and toddlers up to three years old and provide dedicated childcare services for the community. This building will complement the soon to be finished new community Pavilion, and will be set within the 16 acres of Playing Fields, with access to a nearby enclosed playpark, and plenty of green space.
On Islay there are a very limited number of childminders available. Islay has had a steady number of babies born in the last three years (ranging from 20-22 babies/year) and this is predicted to rise. Due to the lack of services available, families are using relatives and friends as childminders to allow them to return to work. The provision of a dedicated childcare facility would provide flexibility with this.
The facility will bring the following positive changes:
- More flexibility for families with regards to 0 to 3 childcare options.
- More opportunities for families to work childcare around their needs, enabling parents to return to work.
- Families may be encouraged to move to Islay, as instead of having severely limited childcare options there will be a dedicated facility.
- It will provide options for employment and training within the facility. It may help provide an opportunity for students and school leavers to gain work experience in their chosen field, without having to leave Islay.
It is anticipated that it will be several years before the facility is up and running. The project is currently in the early stages. A Planning Application has been submitted to Argyll & Bute Council, and the Building Warrant has been completed as far as possible, given the current funding restrictions. SID are currently looking for funding to finalise the Building Warrant, and move on to the construction phases.
Creating a Cairnbaan Community Hub. Refurbishment of the old forestry buildings
2025-05-30 • No comments • • Regeneration Capital Grant Fund
1. What we want to achieve.
The Cairnbaan Community Trust, (SC052905) wants to refurbish the forestry buildings to provide a community gathering point and flexible workshop and event spaces. We want a community hub that can be used by the community for education such as crafts and Gaelic, health e.g. yoga and other activities, recreation and social gatherings, inside and outside and temporary office space for local entrepreneurs.
Our priority is the smaller of the two buildings which will provide space for community events and workshops, social meeting space, hot desks and a community kitchen. There is external space that can be developed to provide a community garden and outside event space. It is hoped in the future the larger of the two buildings can be developed to provide space for larger workshops and events.
We have divided the work into phases and we are currently seeking funding for phases 1 and 2.
Phase 0: This covers the procurement of the forestry buildings under a community asset transfer funded by the Scottish Land Fund and we have secured initial funding for essential repairs to both buildings to make them safe and weatherproof. The work will start when we take ownership on the 01/08/2025.
Phase 1: Is the refurbishment of the smaller building. This phase will change the internal layout of the building to create flexible spaces. This entails new partitions, doors, lighting and upgrade to the heating. Additional facilities, external and internal, will be needed for disabled and users with special needs. We also aim to fit a community kitchen and social space for coffee mornings. Finally we need to replace windows and install new furnishings and fittings.
Phase 2: Is the landscaping and provision of a community garden and outdoor space.
Phase 3: Is the refurbishment and fitting out of the larger building. In this phase we also plan to look at energy efficiency improvements, e.g. heat pumps and solar panels.
2. Why our project is needed
Currently there is no community centre to provide a focal point or resources for the community. There is a risk of social isolation amongst our older population and there are no facilities for the young people in our village. Community cohesion is being eroded.
We commissioned a feasibility report through Community Enterprise which highlighted the following points. Accessing facilities is difficult without a car, the minimal bus service is a school service with no evening or Sunday services. There are no shops, medical or other services in the village. Despite scoring highly in other domains the area falls into the 10% most deprived areas in Scotland in terms of access to services in relation to the Scottish indices of multiple deprivation. Feedback from local people highlighted that a primary need in the community is an indoor social area and meeting space.
3. The positive changes our project will bring
Our vision is to reduce isolation, improve community life and reflect the cultural, environment and historic heritage of the area. The current priorities for the CCT are.
- Bringing the community together to enable opportunities for social interaction and growth.
- Advancement of arts, heritage, culture and science.
- The provision and organization of recreational facilities to improve the quality of life for the community.
- Improving the environment including education about the environment, culture and history.
- The relief of thos in need either because of age, ill health, disability or financial hardship.
The refurbishment of the buidings will provide a focal point for the community and the resources to bring the community together especially those that feel isolated. It will provide resources for all ages across the community and give everyone opportunities for development and a sense of purpose and indentity.
Through current engagement with the local community we have already identified skills and volunteers that can contribute to the refurbishment which will foster community involvement from the outset
4. How long will our project run
Phase 1 and 2 of the project will start on: 05/01/2026
The project will run for: 15 months
Our Business plan and the Feasibility report are available on request. Unfortunately the file size was too big to attach.
Save Tobermory Fisherman’s Pier
2025-06-02 • No comments • • Regeneration Capital Grant Fund
1 What do we want to do?
Tobermory Fisherman's Pier Association intends to renovate and improve Thomas Telford's hisoric pier for the use of fishermen and other commercial users. We would like to preserve the pier as a place that can be used and enjoyed by locals and visitors alike. We want to open the pier to other commercial users and provide a solution to the risk of flooding caused by increasingly higher tides. A structural engineers report has been commissioned and has provided a plan for remedial works.
2 Why is the project needed?
While the pier is a vital economic resource for the fishermen of North Mull, it is also an essential and integral part of Tobermory's built heritage. Without the pier the fishermen would need to look for alternative space to store and repair gear. They would have to use moorings or pontoons and they would have to use alternative means to land their catch. All of these alternatives are costly, inconvenient and not as safe as the platform provided by the pier.
We have the support of the community and are backed by Mull Community Council, Tobermory Harbour Association and Mull and Iona Community Trust.
3 What positive changes will our project bring about?
The proposed improvements to the pier will provide a fit for purpose structure that will enable the fishing community, and other commercial users, to have confidence in the long-term viability of their businesses and provide the oppurtunity to support new entrants to the sector. Securing the long-term future of the pier will enable it to remain at the heart of the community for centuries to come, bringing economic benefit to the town as a platform for the fishermen and also as part of what draws visitors to Tobermory. It will continue to be a much loved hub for community celebrations and a valued civic space for locals and visitors to enjoy.
4 How long will our project run for?
The project will start in March 2026 and run for seven months.
Please refer to the attached PDF file for our more comprehensive proposal.
Lorn and Oban Reuse Initiative - Renewals and Expansion Project
2025-05-30 • 1 comment • • Regeneration Capital Grant Fund
What we want to do - Lorn and Oban Reuse Initiative (LORI) is our long-standing furniture reuse project based in Oban, serving communities for over 15 years. The project, which aims to achieve a Zero Waste society, diverts furniture, household goods and electricals etc. into reuse and before [these] unwanted items enter the waste hierarchy. In the last 12 months, LORI has supported over 11500 customers including businesses, individuals and families. Those in poverty and personal crisis, those displaced by war in Ukraine and communities challenged by the ongoing cost of living crisis. “Such a fantastic way to reduce wasting perfectly good products. Furniture is top quality and the staff I met were friendly, welcoming and incredibly helpful.” CustomerThis is an exciting period for our charity, as we are planning a major expansion of our work to enable us to better support the growing number of people who come to us for help. Our plans are well advanced including planning consent and building warrant for the proposed improvements and renewals to increase available floor space to meet the growing demand for reuse goods. GRAB has set aside reserves to contribute to the cost of these improvements.Under this grant we propose to move forward rapidly with the project. Available match funding already secured will support project management and admin resources and back LORI during any disruption to trade while improvements take place. Under this grant, captal funds will be deployed to prepare groundworks and the foundations to accommodate new modular buildings, the purchase of new buildings to replace derelict and delapidated units and much-needed welfare facilities. And extensive refurbishment to an existing building. Why the project is needed - In Argyll and Bute, landfill accounts for around half of the Council’s annual production of Carbon Dioxide equivalent emissions (CO2e). (Source: Argyll and Bute Council Decarbonisation Plan 2021). Positive changes will the project bring about - Planet – Tackling the climate emergency, LORI reduces landfill; 45% of greenhouse gases come from products we use and purchase. Saving valuable resources from landfill, LORI reduces the communities’ carbon footprint and cuts emissions. In Oban and Lorn approx. 858 tonnes of Municipal Solid Waste is produced each year. Currently just over 10% or 86 tonnes is diverted through reuse by The GRAB Trust. People – supporting local people and creating jobs, LORI supports communities to utilise existing resources, LORI has steadily increased volumes diverted from landfill each year; diverting over 450 tonnes from landfill in the last 8 years. The initiative sustains 7 jobs and 12 regular volunteers. Pounds – Strengthening the circular economy we offer low cost, high quality furniture and homewares to everyone as a sustainable, low cost alternative to buying new. LORI supports the Circular Economy by keeping existing resources in use for longer and our not-for-profit community enterprise now recirculates over £120,000 in our communities annually. Reducing the tax burden, LORI decreases landfill tax, saving local taxpayers over £8,000 annually. Place – engaging and empowering communities LORI is a place where ideas flourish. We support community groups and partners in the third sector. We help businesses like cafes, hotels and Air B&B furnish their premises. We help communities to share and to learn new skills; reusing and repairing is a creative way to try new things, gain useful skills, appreciate what we already have and find new uses to make the most of it. GRAB is part of Circular Communities Scotland Share and Repair Network and LORI is a source for tools for makers and craftsmen - keeping traditions alive.Our renewals project at LORI will ensure communities are supported for years to come - increase available floorspace by 80%, introduce welfare facilities for staff and volunteers and extend product lines – the new provision of running water at the site will open up the possibility of testing white goods (washing machines & dishwashers) for example. With increased floorspace LORI will better serve the growing demand for reuse, further reduce landfill and offer increased support to the circular economy in Oban and Lorn.
Tighnabruaich Community Petrol Station - powering a fragile community
2025-05-31 • No comments • • Regeneration Capital Grant Fund
The Problem
Our petrol station is threatened with closure due to retirement of the owners, and the business case for a commercial purchase is very weak. We are likely to end up with no fuel within 24 miles (and more for the isolated parts of our district). If people are forced to travel out of the area for fuel, they will tend to do all their shopping on the same trip, affecting other local shops and businesses . Carbon emissions will increase as people are forced to travel at least 48 miles round trip for fuel, over single-track mountain roads. Even running garden tools will become problematic, and our local Life Boat and volunteer Fire Service will have problems with adequate supply.
The Solution
This type of scenario is a perfect fit for a community enterprise response: improving the resilience and sustainability of the local area; providing opportunities for business and employment; and helping our community plan ahead for the switch to electric vehicles. We need a community-owned petrol station to secure fuel supplies in the area in the medium-term, install charging points, create business units for rent, and refurbish the historic building as a community transport and resilience hub. Having run two community consultations in the past two years we know that people will continue to need fuel for the next 10 - 15 years, that there is demand for workshop spaces for small businesses and that the petrol station building (a former Victorian pier house) has a high heritage value for the local community.
Opportunities
Since consulting on the community purchase of the petrol station, we have a had two direct approaches from potential workshop tenants. One local community group has a waiting list of small businesses looking for premises, so the creation of new work units would have a positive impact on the local economy. With joint support from the Scottish Land Fund we would be able to employ a Project and Transition Manager, tasked with delivering improvements to the building, installation of charging points and other renewables measures, managing the workshop spaces and developing our plans for electric community transport. We see many benefits arising from this project as well as securing a vital service.
Current Stage of Planning
We are about to apply to the Scottish Land Fund for support in meeting the purchase price and employing a part-time member of staff. Other funds will come from applications to charitable trusts and the Scottish Government, a community share issue and our own resources. We have a clear idea of the costs of the building refurbishment and the replacment of the fuel pumps with card payment models. Support to install charging points will be our other target for the early stages after our community purchase and there are several possible sources of funding.
Longer Term Goals
The move away from fossil fuels is envrionmentally and socially necessary. Climate change is driving a rise in the number of destructive weather events - Storm Eowyn resulted in a five-day power cut for the district. Our scattered population has a very high percentage of older people and the lack of power and communication was very concerning for them. In bringing the petrol station to community ownership we are not blind to the impact of carbon emissions and their effect on community resilience and environmental sustainability.
Although it may seem paradoxical, our purchase of the petrol station will help in lowering carbon emissions by removing the need for unnecessary journeys of around 50 miles. It will protect local services by keeping a point of sale in the area. It will make the district more secure in providing a storage space for emergency resilience supplies (like camping stoves and satellite phones to be used in future storms). It will allow us to install charging points and solar panels. It will bring a restoration of the adjoining pier into consideration as a tourist and leisure resource for swimming and boating. It will give us a site to base the community transport project that was viewed so favourably in our 2023 community survey. All of these achievable goals mean that the community buy-out will be benefiting the area long after the need to sell fossil fuels is gone.
Unlocking Ulva: A Community Barge to Connect, Create and Thrive
2025-06-02 • No comments • • Regeneration Capital Grant Fund
North West Mull Community Woodland Company (NWMCWC) proposes to purchase and operate a community-owned barge to serve the Isle of Ulva. This transformative asset will unlock essential access for people, goods, vehicles, livestock, and materials - enabling regeneration, resilience, and economic growth on a fragile, remote island currently constrained by limited marine transport.
Ulva is a roadless island off the west coast of Mull, with no bridge and only a passenger ferry. The community is entirely reliant on the support of a local fish farm for occasional barge support - help that has been generous and invaluable over the last few years, though is naturally limited. This creates a significant barrier to regeneration, preventing progress on key projects and undermining the island’s long-term sustainability.
The barge will address this infrastructure gap and enable a range of community-led initiatives, including:
-
Heritage restoration, including the movement of scaffolding, stone, and tools to repair historic buildings like Ulva House or Telford-designed church, and other community buildings.
-
Sustainable land management, supporting crofting and farming by transporting livestock, feed, and agricultural supplies, as well as help with the removal of unused and broken equipment and machinery.
-
Resident-led business development, giving islanders the infrastructure needed to start and sustain their own small enterprises - enabling self-sufficiency and reducing dependence on external services.
-
Contractor and service access, allowing building and infrastructure work to proceed without excessive private transport costs.
-
Emergency resilience, offering an alternative logistics route in the event of ferry failure.
-
A community-led initiatives like Ulva Producers’ Market, connecting local growers, makers, and visitors in a shared island space.
-
Cultural and community events, such as pop-up exhibitions, and other events that require transporting bulky or heavy equipment.
As one resident said, "A community barge would secure the long-term future of the farm and ensure we’re no longer totally reliant on a third party to move livestock or machinery. It would also open up opportunities for diversification. On a personal level, it would create a more sustainable and flexible connection between Ulva and Mull—helping our community grow, thrive, and engage more with the wider community of north-west Mull.”
The barge will be community-owned, maintained by NWMCWC, and operated in partnership with residents and local businesses. It will have multiple uses and function flexibly, supporting both everyday needs and long-term community goals. Critically, it provides a foundation for further regeneration efforts, addressing a clear case of market failure and enabling transformational change.
The project will be ready to commence once capital funding is secured, with delivery anticipated over 12–18 months, including procurement, compliance, training, and launch.